Blanco Telescope and DECam Alistair Walker ACTR meeting 22 March ver 2

Slides:



Advertisements
Similar presentations
CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
Advertisements

Highly Efficient Operations Keck Scientific Strategic Planning 2009 Hilton Lewis T. Armandroff, S. Adkins, R. Goodrich J. Johnson, K. Kinoshita, R. Matsuda.
DECam Community Pipeline Review Closeout Presentation DES Council of Directors’ Review August 30-31, 2010 NCSA, Urbana IL.
1 Astronomical Observational Techniques and Instrumentation RIT Course Number Professor Don Figer Telescopes.
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.
MMT AO run Jan Timeline: –Night 1: Install hardware during MMT engineering –Nights 2-4: AO engineering with fast-framing H camera (Indigo) –Nights.
G D Interferometer Status LSC Meeting, Ann Arbor, June 4, 2005 Daniel Sigg.
1 NGAO Science Instrument Reuse Part 1: NIRC2 NGAO IWG December 12, 2006.
The KPNO 4m “Mayall” Telescope Arjun Dey (NOAO). National Optical Astronomy Observatory Mission: provide the best ground-based astronomical capabilities.
CTIO: DECam Installation, Commissioning, & Operations Oct DES Collab Meeting Philadelphia R. Chris Smith CTIO/NOAO.
Technical manager’s report September Telescope activities Primary mirror hardpoint repair New mirror actuator controls Collimation analysis F/5.
J. Large Binocular Telescope (LBT) Operational Readiness
Magellan Telescopes Observatory Report Accomplishments Problems Work in Progress Network f5 mirror coating.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
G Amaldi Meeting 2015, Gwangju, South Korea1 Status of LIGO June 22, 2015 Daniel Sigg LIGO Hanford Observatory (on behalf of the LIGO Scientific.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 1 Update to FARDOG: Technical Division Xband Activities Fermilab NLC Activities.
CTIO and the Dark Energy Camera Prepared for the CD-1 Director’s Review Tuesday, July 25, 2006 Fermilab Alistair R. Walker.
Dark Energy Survey (DES) (Presenter: Douglas Tucker) DES is observing (Aug. 15 th – Feb. 15 th ) Year 2 Operations Collaboration Meeting in Sussex, UK,
1 The DES Calibrations Effort Douglas L. Tucker (DES Calibrations Scientist) DES NSF/DOE Review, 8-9 June 2009 The DES Calibrations Effort has connections.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
Proton Improvement Plan: View from the Directorate (and the DOE) Stuart Henderson PIP Meeting Jan 3, 2012.
H.E.S.S. - MAGIC – CTA meeting Technical aspects of current & future instrumentation Telescope structures Camera designs Photon detectors Mirrors.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
Brenna Flaugher, PMG, April 6, 2007 DECam Funding Need Profile (Dec 06) (then yr $, Overhead included) This gave a technically driven schedule resulting.
Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 1 The DECam Project Closeout, Action Items Hexapod Optical Lenses CCD Readout Filters Shutter 2008.
SLAC Collaboration Meeting Image Quality Workshop: State of the Blanco Tim Abbott (owing much to Roberto Tighe) CTIO 2 Dec 2009 Tim Abbott, SLAC Collaboration.
Alistair Walker - DECam Instrument Scientist Tim Abbott – Blanco Telescope Scientist CTIO/NOAO DES Collaboration Meeting Oct The Blanco Telescope.
Pg 1 15 September 2015 ACTR Meeting SOAR: Resources & Priorities Jay Elias.
F/8 Repair and recommissioning status and near term forward look Ron Probst, Roberto Tighe 06 Nov 2012.
DECam in Overview Alistair Walker Version 3 December Ver 4 Updates Jan
Blanco & ETS ACTR, 15 March Blanco Glycol cooling system upgrade – Enrique Figueroa report – ACTR DocDB #266 – “A quotation for a 40ton unit has.
Commissioning Alistair Walker NOAO/CTIO 9/30/ DES Collaboration Meeting October
Pg 1 21 April 2016 ACTR Meeting SOAR Priorities Jay Elias.
Updates on projects 472, 470, 443, 462, 442, 471, 480, 483, 484 Tim Abbott Changes since 9 July are in blue.
Out Briefing External Safety Management Review Blanco 4-m Telescopes March 26-28, 2012.
The Blanco Environmental Control System Alistair R. Walker November
T. Axelrod, NASA Asteroid Grand Challenge, Houston, Oct 1, 2013 Improving NEO Discovery Efficiency With Citizen Science Tim Axelrod LSST EPO Scientist.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Blanco Telescope and DECam Alistair Walker ACTR meeting 22 March 2013
SOFIA Program Status Bob Meyer January 10, 2010 Program Manager.
Technical resources schedule
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Blanco F/8 Status AURA Observatory Council, Tucson, 3/2013.
Jay Elias1 1plus bits plagiarized from Steve Heathcote and others
Blanco Environmental Control System
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Alistair Walker Version 3 December
SOCS/Scheduler Development Plan Michael Reuter, Fransicso Delgado
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
John T. Seeman DOE PEP-II Operations Review April 26, 2006
ETS For ACTR 9the April 2015 R.Tighe april 2011 april /04/2015
Magellan Telescopes Observatory Report
DECam Filter/Shutter Installation and Filters Installation
COSMOS Status David Sprayberry, Sean Points & Jay Elias
Fans & Heaters technical seminar
OCS Scheduler Status Francisco Delgado T&S Software Manager
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
Management Breakout: MREFC Budget Summary Victor L
OCS Scheduler Status Francisco Delgado T&S Software Manager
Project planning and status (February 2018)
LGS Project Meeting December 21, 2006 Agenda SWIFT update - A. Bouchez
The Technology Integration Planning Model
HL-LHC upgrade at IPHC news
Project planning and status (May 2018)
Presentation transcript:

Blanco Telescope and DECam Alistair Walker ACTR meeting 22 March 2013 ver 2

DES Directors Operational Readiness Review April 20-21 Tim Axelrod (U of Arizona & LSST) – Chairperson Fernanda Garcia (Fermilab Accelerator Division) Mario Juric (AURA – LSST) Eric McHugh (Fermilab Particle Physics Div. – ESH) Constance Rockosi (UCSD & Lick Observatory) Larry Stepp (Thirty Meter Telescope) David Wittman (UCSD)

Closeout Presentation - March 21, 2013 B. telescope + instrument + ancillary on-mountain systems with capability to acquire survey-quality data with sufficient efficiency to meet survey science goals Primary Writer: Larry Stepp Contributors: Telescope & Mountain Systems Comments: CTIO is completing a major rebuild of the Blanco Telescope, which added 8 tons of mass and a new Telescope Control System. A number of hardware, software and procedural problems were found during integration and commissioning, but most have been remedied during the 7 months of effort. Findings: CTIO has made good progress rebuilding and recommissioning the Blanco Telescope CTIO has a good system of telemetry to help diagnose problems with the Blanco Improvements have been made in system robustness in response to risk assessment/failure modes analysis 3% telescope downtime during first 260 hours of DECam operation is good reliability under the circumstances Cooperation between the CTIO and DECam teams has been excellent DES Council Review of Operational Readiness for DES Closeout Presentation - March 21, 2013

Closeout Presentation - March 21, 2013 B. telescope + instrument + ancillary on-mountain systems with capability to acquire survey-quality data with sufficient efficiency to meet survey science goals Primary Writer: Larry Stepp Contributors: Telescope & Mountain Systems (2) Findings: Failure to meet inter-exposure time limits is a significant risk to survey efficiency and achievement of the survey area science goals; more improvement is needed The team working on analysis of the BCAM and optical "donut" is making good progress in understanding the flexure and alignment issues, but more work is needed Although not all requirements are currently met, it appears the work is on track to complete the needed improvements to get to acceptable telescope performance by the start of the survey Recommendations Further work is needed to understand telescope flexure and reconcile BCAM and optical "donut" measurements, to improve image quality and pointing performance CTIO should proceed with plans to repair the DIMM before the start of the survey Further improvements in inter-exposure time are needed to ensure science goals can be met DES Council Review of Operational Readiness for DES Closeout Presentation - March 21, 2013

Closeout Presentation - March 21, 2013 B. telescope + instrument + ancillary on-mountain systems with capability to acquire survey-quality data with sufficient efficiency to meet survey science goals Primary Writer: Larry Stepp Contributors: Instrument Findings: DECam performance has generally been excellent There are some issues with CCD linearity, bad column features, etc., but these are being worked Instrument reliability of 1% downtime in first 260 hours of operation is excellent Problems with ghost images and stray light have been analyzed and are being dealt with Maintenance of the detector lab at FNAL to continue learning about CCD properties is an excellent approach Comments: D. Silva reports DECam has already been a very successful facility instrument, with much interest from community observers DES Council Review of Operational Readiness for DES Closeout Presentation - March 21, 2013

Closeout Presentation - March 21, 2013 B. telescope + instrument + ancillary on-mountain systems with capability to acquire survey-quality data with sufficient efficiency to meet survey science goals Primary Writer: Larry Stepp Contributors: Instrument Recommendations It is important to carry through with plans to reduce the risk of exposing the CCDs to excessive light conditions Add monitoring procedures to track any changes in CCD performance with time (fullwell level, etc.) DES Council Review of Operational Readiness for DES Closeout Presentation - March 21, 2013

So, what do we need to do? Technical work is described in the next slides We need to execute two projects (464, 470) We need to strengthen the operations support team The really serious review, run by the DOE + NSF, is April 23-24, at Fermilab

Possible Major Upgrades The installation of an air handling unit (or units) in the dome plus installation of a new set of 2.5 inch pipes from the outside-dome chiller is presently being estimated. Cost is likely to be of the order of $50K. It is likely that funds will only become available in FY14, that is a discussion that will take place when we know the costs (end of March). (464) The replacement of the Blanco primary axial support transducers (33) is about to be estimated. Assuming we do this project, it is likely to be both quite expensive and manpower-intensive, and require telescope down time, thus it’s difficult to contemplate doing this before the 2014A semester. (470)

March Replace Tachometer Oil Seal (Patricio) Telescope open-loop tracking adjustment (German, Michael) Efficiency – test shortening the “TCS Delay” (Alistair) Guider tests, need clouds (Alistair) Skymap to build a primary mirror support LUT (Alistair) Exposure to exposure efficiency tests (Alistair) Check dome positioning (Alistair, Omar) Decide whether to make default AOS-5 instead of AOS-1 (Alistair) Test suite of observations (Alistair)

April Oil scrapers? (Freddy) Install PF cage covers (Freddy) Install mask on the g filter (Patricio) Another set of all-sky measurements with the laser system + bigger CCD camera, and Bcams (Roberto, Freddy, Tim) Test suite of observations (Tim)

May Hydraulic oil cooler (Esteban, Edison) Sequence code changes? (Juan Estrada) Install better pointing model (if not before, German, Rolo) Test suite of observations (Alistair)

June Test suite of observations (Alistair) F/8 work (Tim et al.)

July Warm up DECam (Telops, Alistair) Install replacement LN2 pump (Herman Cease, Freddy, Telops) Fix leaks, general maintenance of LN2 system (ditto) Install masks on the other 5 filters (Patricio, +?) Disable remaining fan sensor, replace two fans (Terri Shaw, Lee Groves, Telops) Rewire remote crate switch, check grounding (Steve Chappa, Telops)

On-going activities, plus work not assigned to a particular time slot yet Tune the daytime mirror cooler algorithm (Alistair, Edison) Install remaining temperature sensors (Edison) Plumb second NESLAB (Telops) Plumb second roughing pump in Cass cage (Telops) Plumb second air compressor (Telops) Telemetry for LN2 hoses vacuum jackets (Marco) External photodiode bright-light sensors (Marco) Backup generator for pumps (Marco) Install accelerometer on PF cage (Michael)