FSMP/ 1 Report Presentation to the ANC

Slides:



Advertisements
Similar presentations
AERONAUTICAL COMMUNICATIONS PANEL (ACP) TWENTY THIRD MEETING OF WORKING GROUP F WACAF/ESAF BRIEF REPORT BY OMODELE AROWOLO Cairo, Egypt 21 – 27 September.
Advertisements

Vol. I - ICAO Spectrum Strategy Vol. II - Frequency Planning
Aviation Frequency Spectrum
ICAO Radio Spectrum SeminarMID Office, Cairo, 4 – 6 June ICAO RF Handbook Doc 9718 Prepared by Torsten Jacob ICAO ANB/CNS.
Aeronautical Frequency Spectrum Management and ACP WG-F
Nav, Spectrum & Surveillance Spectrum Management Seminar, Nairobi Feb 2004 PREPARATION IN ICAO FOR WRC-07 presentation by Steve Mitchell, UK.
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
Nav, Spectrum & Surveillance RPG for WRC-2007, ACP WGs B&F and NSP SSG, Bangkok Feb 2005 International Civil Aviation Organization Regional Preparatory.
Regional Preparatory Workshop for the ITU WRC-2015
Presentation of the proposed Annex 19 – Safety Management
1 ITU-R Strategic Plan Draft Report from the RAG Correspondence Group RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013.
Nadia Konzali Project Coordinator, COSCAP-GS
European preparations for WRC Stella Lyubchenko CEPT Workshop on European Spectrum Management and Numbering 4 th June 2014.
Doc.: IEEE /023r0 Submission July 2002 Carl R. Stevenson, Agere Systems Motion to SEC Motion by: Stevenson/ Seconded by: O’Hara Agenda:
WRC-12 Preparation CPG Chairman /
PRESENTATION ON THE WORK OF WORKING GROUP 11 ON SPECTRUM MANAGEMENT EACO Seminar for Chairpersons of National Regulatory Authorities 28 May 2015 Kigali.
NATIONAL INFORMATION AND COMMUNICATIONS TECHNOLOGY AUTHORITY In-country Preparatory Meeting 04 th June 2015, NICTA HQ WRC-15 Issues WRC 15: PNG Preparatory.
Spectrum for UAS UAS at WRC-12 European WRC-12 preparation Martin Weber, Federal Network Agency, Germany EU UAS Panel Workshop Brussels,
2012 World Radiocommunication Conference: A Retrospective.
CEPT positions for WRC-15 Mr. Alexander Kühn CPG-15 Chairman October 2015.
WRC–12 Industry Debrief 23 April 2012 Agenda Items 1.1 Deletion of country footnotes 2 Incorporation by Reference 4 Review of ITU-R Resolutions and Recommendations.
Role of World Radiocommunications Conference and European preparations for WRC Stella Lyubchenko 4 th CEPT Workshop on European Spectrum Management and.
Agenda item on GFT – Global flight tracking for civil aviation.
International Telecommunication Union Document WRC-15-IRWSP-15/16-E 1 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION.
European Regional Aviation Safety Group (RASG EUR)
GTFORCIDI Summary of mandates and proposal for streamlining sectoral ministerial processes.
Vol. I - ICAO Spectrum Strategy Vol. II - Frequency Planning
Preparation process for WRC-19
International Civil Aviation Organization.
UNEP/Global Mechanism support for UNCCD reporting
Harvey Gabriel LEKAMISY
Electronic Filing of Differences(EFOD) System and Filing of Differences Task Force (FDTF) Air Navigation Bureau.
Thailand, Bangkok, 18 – 21 October 2016
ICAO Position for ITU WRC-15
System of Systems (DRAFT) To be approved by the ICAO Council
ITU Working Party 8B Activities
RADIO SPECTRUM MANAGEMENT
ICAO Position for ITU WRC-15
Aeronautical Frequency Spectrum Management and ACP WG-F
Regional Preparatory Workshop for the ITU WRC-2015
Session 1 The ECC in practice, its structure, its working process
Thailand, Bangkok, 18 – 21 October 2016
Prepared by Torsten Jacob ICAO ANB/CNS
Introduction to ECC PT1 February 2011.
SPECIFICS ON FM BROADCAST INTERFERENCE AND LATEST WORK
Introduction to Asia-Pacific Telecommunity (APT)
Preparations for the 2015 World Radiocommunication Conference (WRC-15)
Prepared by Torsten Jacob ICAO ANB/CNS
Aviation Frequency Spectrum
THURAYA Proprietary Information
Doriana Guiducci, European Communications Office
Mr. Cleveland Thomas Vice Chairman Working Party 2/3 Study Group 3 ITU-T.
Cindy Cook, GRSC-9 Chair, ISACC
AIM Global Strategy Air Navigation Procedures for AIM Seminar
SPECTRUM STRATEGY & VISION
Draft ICAO Position for ITU WRC-19
Sergio Buonomo Counselor ITU-R Study Group 5
REFIT Platform 20/02/2019 Diversity Europe Group.
Draft ICAO Position for ITU WRC-15
SADC 5TH WRC – 15 PREPARATORY MEETING
IEEE 802 2nd Vice Chair last name at ieee dot org
TWENTY THIRD MEETING OF WORKING GROUP F
Status report from ITU-R WP 5A on ITS activities
Frequency Management Group Chairman
Overview of the recommendations on software updates
RR-TAG Opening Report Date: November 8, 2015 Authors: March, 2016
Possible Future Agenda Items
ICAO ACP Working Group M Iridium Sub Group Overview
Draft ICAO Position for ITU WRC-15
SIG RFC 2019 Relevant Summary
Presentation transcript:

FSMP/ 1 Report Presentation to the ANC Michael Biggs FSMP Chair 28 August, 2015

Content General overview of meeting Development of job cards Work Programme Development of Job Cards Upcoming Deliverables / Priorities Structure of the panel FSMP/1

General Overview 1st Frequency Spectrum Management Panel Meeting: 24 to 25 August 2015 Attendance 17 Contracting States 7 International Organizations ~60 participants Chairman – Mr Michael Biggs (United States) Vice-Chairman – Mr Andrew Roy (ASRI) Secretary – Loftur Jonasson (ICAO Secretariat) FSMP/1

Development of job cards 5 job cards, amended / finalized Previously developed by ACP WG-F/31 (6 – 10 Oct 2014) Maintenance and update of the ICAO frequency spectrum strategy and policy; ITU Radio Regulations (RR) and ITU World Radiocommunication Conferences (WRC) (frequency spectrum access for aeronautical systems); Maintenance of the ITU Radioregulatory framework relevant to aviation and keeping ICAO provisions and the ITU Radioregulatory framework in sync (ITU-R Recommendations and Reports affecting the implementation of aeronautical systems); Radio frequency interference issues for aviation and the need for action by States, ICAO and international organizations; and Development and maintenance of SARPs and guidance material to facilitate frequency management of C, N and S systems. FSMP/1

Upcoming Deliverables / Priorities Agenda for WRC-19 will be decided by WRC-15 in Nov 2015 First Priority: Develop Position for WRC-19 Deliver draft Pos to ANC by 4Q 2016. If agreeable, then State review process, WG/FSMP, ANC, Council approval and SL by 3Q 2017 Second Priority: Update Spectrum Strategy and Spectrum Policy statements First cut of Spectrum Strategy, as approved by Council is in Doc 9718 Vol I, Chapter 8. Consider update for potential approval by Council. Spectrum Policy, as approved by Council is in Doc 9718 Vol I, Chapter 7. Develop updates reflecting outcome of WRC-15, for potential approval by Council. Other specific tasks to be progressed as detailed in Job Cards FSMP/1

Structure of the panel Panel will work in a single stream to progress work in the most efficient manner possible Chairman of FSMP will act as Rapporteur of WG-FMSP Two to three mtgs of FSMP to be held each quadrennial WRC cycle Held in conjunction with less formal mtgs of a WG/FSMP to progress work not resulting in formal deliverables Other mtgs to be held in a less formal mode of a WG/FSMP, some in ICAO Regions, supporting regional WRC preparatory Workshops. FSMP/1

Structure of the panel Tentative workplan: 2016 2017 2018 2019 Q1 Q3 WG/FSMP FSMP ICAO HQ APAC SAM/CAR-NAM AFI MID FSMP/1

Coordination with other panels Spectrum is an enabler for all Communication, Navigation and Surveillance systems. Hence, the Panel will need to coordinate closely with the various groups of experts responsible for other Annexes and disciplines, in particular with CP, NSP, ASP and RPASP In addition, the Panel will assist Secretariat with development of input documentation and views to support work of Study Groups and Working Parties of the ITU Radiocommunication Sector FSMP/1

Meeting of WG-FSMP/1 (a.k.a. the 33rd meeting of Working Group F) Main thrust of meeting was to finalize preparations for WRC-15 ICAO Position agreed by Council in June, no new output/changes from this meeting Informal discussion of the various strategies by administrations and regional preparatory groups On some issues (1.17, 1.18, etc) have common views On others (1.5, GFT, GADSS) opinions differ Also progressed items such as spectrum strategy and studies on 5 GHz band planning FSMP/1

Development of job cards FSMP/1

Development of job cards FSMP/1

Development of job cards FSMP/1

Development of job cards FSMP/1

Development of job cards FSMP/1