© ETSI All rights reserved

Slides:



Advertisements
Similar presentations
Halifax, 31 Oct – 3 Nov 2011Global Standards Collaboration ETSI ETSI Jørgen Friis, VP ETSI SES (Standards Enabling Services) Document No: GSC-16-PLEN-XX.
Advertisements

CTI UPDATE ON TTCN-3.ORG Silvia AlmagiaMTS#60 1 Oct 2013 © ETSI All rights reserved.
TELECOM ITALIA GROUP ETSI Workshop on Standards & Interoperability in ICT ETPs Sophia Antipolis, France, October 2006 | Giovanni Romano | Technology.
RFID Update Presentation to RFID Workshop John Falck Chairman ETSI-ERM-TG34.
LTE CONFORMANCE TESTING: EXPERIENCES IN A LONG TERM PROJECT TTCN-3 User Conference 2011 – Bled, Slovenia © ETSI All rights reserved Presented by.
1 A Firm Step of 3GPP for UE Conformance & Interoperability Shicheng Hu ETSI PTCC 22 May 2003.
Agreed Document Structure Use ETSI document structure R4.00 Introduction S4.01 Radio transmission and reception (FDD) S4.02 Radio transmission and reception.
© 3GPP 2009 Mobile World Congress, Barcelona, 19 th February 2009© 3GPP GPP The Training Course / Module 1 1 All you always wanted to know about.
MCC 3G and GSM Specification Handling Ian Doig, MCC.
T3UC 2012 Bangalore, India12-13 June, 2012 © ETSI All rights reserved IMS voice conformance test over LTE ETSI STF160.
E-Learning: No Standards; No Coalitions - No Boom Ed Walker 7 December 2000.
TF160 / SS VENDORS SESSION 3GPP RAN5#65 10 – 14 November 2014 Venice, Italy R5-14xxxx Presented by TF160 Leader © ETSI All rights reserved.
02/06/2015 IMT GPP status update 1GSC-9, Seoul SOURCE:ETSI TITLE:3GPP Status update AGENDA ITEM:4.1 (Joint GTSC/GRSC) CONTACT:Adrian Scrase, CTO.
Common IMS Management CIMS GPP/3GPP2 Common IMS Workshop Puerto Vallarta, Mexico, January 2008 Source: 3GPP2 Document for: Discussion Agenda.
Understanding 3GPP Bearers LTE / HSPA / EPC ‘knowledge nuggets’ Neil Wiffen - More free downloads at Public.
1 ITU-R Liaison Group Report - Session #67 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0046.
1 ITU-R Liaison Group Report - Session #66 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0030r1.
Protocol Testing GSM /GPRS Protocols: MM, CC, RR,Physical Layer, RF & NAS UMTS Protocols: NAS, RRC,RLC,MAC,BMC,PDCP, Physical Layer, RF,QoS Core specs.
TP#13 oneM2M testing discussion TP#13 Source: Laurent Velez, ETSI, Meeting Date:
TTCN-3 Language Maintenance and Evolution TTCN-3 User Conference 2011, Bled Gyorgy Rethy STF 430 Leader
1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) CJK-IMT25-xxx.
MCC Task 160 May Status Report Shicheng HU, MCC 07 May, 2001 TP
MCC TF160 / SS VENDORS SESSION 3GPP RAN5#69 16 th – 20 th November 2015 Anaheim, USA R5-15xxxx MCC TF160 © ETSI All rights reserved.
Agreed Document Structure Use ETSI document structure R4.00 Introduction S4.01 Radio transmission and reception (FDD) S4.02 Radio transmission and reception.
ITU-R Liaison Group Report - Session #64 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127 Date.
Introduction to 3GPP Specification & new Trends in Radio Networks
3:00. 2:59 2:58 2:57 2:56 2:55 2:54 2:53 2:52.
ETSI TCCE WG4 work G. Marque-Pucheu (Airbus / ETSI TCCE WG4) 26-27/08/ 2014.
WiMAX (IEEE ) : Wireless Broadband Networks 1.
LTE Introduction Tzu-chin Liu 15th March 2012.
30-31 March 2005Workshop "IMS over Fixed Access" - Washington 1 Joint 3GPP & TISPAN Workshop on NGN-IMS - Objectives - Alain Le Roux (France Telecom),
Way Forward on UE measurement definition and capability
WF on single Tx switched UL
MCC TF160 / SS Vendors Sidebar
ITU-R Ad-Hoc Contact person
IHE Cardiology Schedule
MCC TF160 Status Report (Pre-RAN5#75)
3GPP RAN WG5 Chair Phil Brown NTT DoCoMo Inc. R
3GPP RAN WG5 Chair Phil Brown NTT DoCoMo Inc. R Draft v2
Summary of Offline Discussion on RMSI CORESET Configuration (Part 2)
SCOPE of the Technical Committee
Hire Toyota Innova in Delhi for Outstation Tour
Project Management for RIMI
Location Based Services support
Top Fire Protection Services Ottawa available on Dubinskyconstruction
'. \s\s I. '.. '... · \ \ \,, I.
3GPP Status.
ETSI Testing Projects ICT-OSA/Parlay Workshop Brazil, March 2006
MTS#59 - Input from CTI Silvia Almagia May 2013
György Réthy MTS IPT chairman
SEAL COATING PAINTING / STRIPING NOTICE
Children’s Hospital Update
ETSI ES Using XML schema with TTCN-3
HSPA Practice – Slide 1 Simplify: #1) ÷2+5 10÷
Security Working Group
' '· \ ·' ,,,,
IEEE Coexistence SC closing report in Warsaw in May 2018
STF430 Final Report Summary
Update on LIBSIP and TTCN-3.org
Update on LIBSIP and TTCN-3.org
ITU-R Liaison Group Report - Session #65 Opening Plenary
UPDATE on SVN & MANTIS Upgrade
T3UC & MBT ws 2012 Presented by Stephan Schulz, TC MTS Chairman for MTS#57 © ETSI All rights reserved.
STF393 Status TTCN-3 Language Maintenance
3GPP Long Term Evolution (LTE) and System Architecture Evolution (SAE)
UPDATE on SVN & MANTIS Upgrade
STF393 Final Report Summary TTCN-3 Language Maintenance
CTI/MTS collaboration - 3GPP TF160
Internet of Things (IoT) Work Group
Presentation transcript:

© ETSI 2011. All rights reserved Agenda 3GPP RAN5 - TF160 & SS vendors workshop#23 04-Oct,2013 R5w130300r1 MCC TF160 © ETSI 2011. All rights reserved

© ETSI 2011. All rights reserved Agenda 1. UTRA TDD ASP change (R5w130301) 2. Schedule of TTCN deliveries in 2014 (R5w130303) 3. Analysis of TDD SSC (R5w130309, 318) 4. draft 34.229-3 & 34.229-4 (R5w130306, 313) - 34.229-4 maintenance - a new mapping interface of 34.229-3 (R5w130307) 5. LTE, GERAN ASP / test model (R5w130304, 305, 310, 312, 316, 317) 6. Analysis of IMS test model over HSPA (R5w130302) 7. Analysis of UTRA test model for PTCRB SS test (R5w130308) 8. Stop delivering 8.1.5.7 in TTCN2 9. RTP related issues (R5w130314, 315) 10. Update PRD12 (R5w130311) 11. AoB © ETSI 2011. All rights reserved