Far Detector Activities Late 2017 – Early 2018

Slides:



Advertisements
Similar presentations
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
Advertisements

Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Step IV Infrastructure update STFC Tim Hayler Eddie Holtom Norbert Collomb Graham Stokes 14 th December 2011 MICO170 meeting 1Tim Hayler.
1 Preparation for MQXF Short Model Tests G. Chlachidze Fermilab.
A. Bross Imperial College – 9/04 Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
Date Event Global Design Effort 1 Technical System Review John Noonan, ANL Yusuke Suetsugu,KEK Paolo Michelato, INFN Milano.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
LAr Week Feb 2000 M. Lefebvre Milestones and Schedule General Production Readiness Review  Passed in Jan 99 Leak Test Station and Electric Test.
Installation of the T600 at Fermilab CSN2, September 22,
DOE-QRT Review 12 Feb2004 Joseph Rasson LHC Project Update1 Joseph Rasson LBNL DOE LHC Quarterly Status Meeting at FNAL 12 February 2004 US LHC ACCELERATOR.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 11 December 2012 LAV construction & installation status.
Fabrication Update – The Frame Awakens Matt Hoff LBNL April 2,
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
Tracker cooling plant refurbishment Project status Revised plan Financial impact.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
TF Fabrication Progress is being made on TF bundle fabrication activities but the schedule remains tight. All 24 outer conductors have been machined but.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Installation of the T600 at Fermilab Fermilab, February 15,
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Warm Vessel Leveling Islands (Piers)
First Wall Panel - Overview
Teleconf ACS – FREIA 28th March 2017
Installation of the T600 at Fermilab
Completion of the MICE-US construction project
Roadmap for triplet cryostats
STATUS OF CIEMAT CONTRIBUTION TO CTF3 ( )
Service channels between Tracker and PP1
1.3-GHz Cavity Vacuum Furnace at IB4
LEP cryostat Procurement strategy and plans
Cryostat procurement, status and plan, QA/QC
Status of design and production of LEP connection cryostat
Complementary ISTC Projects #3888, 3889p
News about the WA104 Programme
Flexible lines production and planning
Cryostat design Mechanical design: Thermal screens: Specifications:
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
LARP Vertical Test Facility
Warm Vessel South Wall Installation, Sub-assembly Option
Teleconference ACS – FREIA 31st October 2017
Diffuser status October 2017
EHN1 Neutrino Installation Plans
Brainstorming on how to best proceed with LESS
MICE Coupling Coil Update
Status of the PANDA Solenoid Magnet Production in BINP
Teleconference ACS – FREIA 20th February 2018
Prototype cryomodule development
LARP Phase II Secondary Collimator RC-0 and RC-1
Valve stem “gag” mechanism
LCLS Vacuum System Plans (July 07)
Teleconference ACS – FREIA 19th June 2017
UPPSALA UNIVERSITY_GERSEMI PROJECT
SC1R Cold Box PDR Assembly Sequence
JLAB CHL 2K COLD BOX REPLACEMENT
Presentation transcript:

Far Detector Activities Late 2017 – Early 2018 C. Montanari CERN – FNAL – INFN

Materials procurement and delivery Materials production of the cold shield. Three suppliers are presently charged for the production of the cold shield components: large aluminum extruded panels in Turkey, small extruded aluminum panels (clamps) in Israel, piping in Spain. Large extrusions: prototypes produced and validated after agreement on a modification about the realization of the groove that hosts the pipes. Extrusion will take one day and is scheduled in about two weeks from now (early December) machining takes 3 weeks in total. Production is expected to be completed around the end of 2017. It will be delivered directly to Fermilab, arrival is expected between end of January and beginning of February 2018. Small extrusions: extrusion is complete and machining is in progress. Completion of production is expected around half of December 2017. It will be delivered directly to Fermilab, arrival is expected before the end of January 2018. Piping system: The first two panels will be ready for inspection at the beginning of December. The production is expected to be completed around mid January, 2018. The panels available before Christmas (first two batches, 10 panels) will be sent to Fermilab from the manufacturer and are expected to arrive around the end of January 2018. The rest of the panels (12 panels) will arrive before end of February 2018. Materials delivery from CERN Director's Progress Review of SBN - November 1, 2017

Materials procurement and delivery Materials delivery from CERN A container (large size, 12 m length) is being readied at CERN for the transport to Fermilab of: Part of the Top warm vessel; Chimneys and crosses; Vacuum pumps; Cold vessels feet and supports; Special nuts and resin for the sealing of the doors; Nuts and bolts for the assembly of the cold shields; Cryogenic piping to be installed inside the cold vessels; Nuts, bolts and O-rings for the installation of the chimneys and crosses. The container will be sent from CERN at the beginning of December and it will arrive at Fermilab around mid January 2018. Director's Progress Review of SBN - November 1, 2017

Activities Supports preparation on the warm vessel Activities on the cold vessels The cold vessels have to be covered (with a tent) for protection from bad weather and to allow heating for the various operations and for the curing of the resin used to seal the door bolts. Installation of a tent or similar should be done before Christmas. Doors welding. To be done starting from January; requires about 1 week / door (Fermilab) Bolts sealing. To be done starting from January; requires about 1 day / door to install the special nuts and 3 days for curing of the sealing resin (assuming a stable temperature around 5 °C to 10 °C) (INFN and Fermilab) Vacuum tightness test. To be done as soon as the doors of one vessel are sealed. Requires one day for installation of the pumps and 3 days for pumping down and leak check. It has to be preceded by the installation of strain gauges on the vessel walls to control the behavior of the vessels during the vacuum loading. The gauges will remain attached to the vessels and will also be used during the commissioning phases (INFN and Fermilab). Installation of the cold feet. Machining of the cold parts: 1 week at the end of January, after arrival of the pieces (Fermilab). Installation: 1 day/vessel at the beginning of February (INFN and CERN). Supports preparation on the warm vessel Drilling of the threaded holes to anchor the Copper-Beryllium sliding guides. To be done in December (Fermilab). Installation of the sliding and guiding supports (tag welding of the St. Steel stoppers). To be done during the second half of January, after the arrival of the container with the support components (Fermilab). Director's Progress Review of SBN - November 1, 2017

Activities Assembly and installation of the cold shield Pre-assembly of the cold shield panels: to be done in the Nova building starting at the beginning of February 2018; requires 2 mechanical technicians (1 CERN and 1 INFN), 1 welder (Fermilab) and a crane driver (Fermilab). Requires 2 days / 3 panels for pre-assembly and installation of the bottom and long vertical walls and 2 days for pre-assembly and installation of the front and back (short) vertical walls (3 working weeks in total, with some contingency). 3 days are required for the final pressure test. Director's Progress Review of SBN - November 1, 2017