Kerr Tar Project Update – June 2016

Slides:



Advertisements
Similar presentations
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
ESTABLISH A NORTH-SOUTH PARKWAY The LNTC and the towns should plan for a parallel north-south parkway that will expand the commuter rail impact area to.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
Titusville to Edgewater Bike Loop PD&E Study
State of Morrisville Mayor Mark Stohlman July 17, 2014.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
NC 73 Small Project Scoping Process Update June 24, 2014.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
From Island Estates Parkway to St. Johns County Line.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Current Construction Projects Major Projects Pinellas County.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
ENGINEERING & CONSTRUCTION DIVISION GERALD N. BRINTON, P.E. COUNTY ENGINEER / DIRECTOR OF ENGINEERING & CONSTRUCTION VOLUSIA COUNTY PUBLIC WORKS DEPARTMENT.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
N. Hancock Road Traffic Signals October 14 th, 2014 Presentation Prepared By Lake County Public Works Department.
Community Development Department Construction Phase BULLDOG DRIVE.
TENTATIVE BUDGET PRESENTATION CITY COUNCIL PUBLIC HEARING SEPTEMBER 8, 2010.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
Jeff Florin Deputy Executive Director, Operations Virginia Port Authority Capital Outlay Program & Facilities Maintenance Overview Board of Commissioners.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Metro Highway Program Presentation to CMAA Abdollah Ansari
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
MED SR 18 Corridor Project MED PID October 13, 2015.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
CPPJ Meeting January 27, 2014 Project Team. Lake Charles MPO - Calcasieu Parish Chapters: 1.Introduction and Transportation Planning Process 2.Regional.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
Essex County Transportation Services Department Essex County Highways 2016 Construction Program Peter Bziuk P. Eng. Manager Design and Construction Services.
Presentation to Transportation Focus Group and Comprehensive Plan Steering Committee Jackson County Countywide Roadways Plan ( ), I-85 Corridor.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
Caltrans District 4 All information presented here is an estimate; It is preliminary and subject to change. SMALL BUSINESS OUTREACH FOR CONTRACTORS March.
Arizona Forward Update
Bicycling in Minneapolis Bicycle Master Plan/Protected Bikeway Update
City of New Braunfels Regional Transportation Planning Garry Ford, P.E., PTOE City Engineer June 13, 2017.
Regional Roads Committee
Chapin Town Hall Meeting
Interstate 15 North Phase 4
Molly Kline, Project Manager
Highway 110 Project Update
DISTRICT 7 DESIGN-BUILD PUSH BUTTON (FEDERAL SAFETY AND STATE FUNDS)
District 3 Complete Streets Projects
STREETS & STORMWATER DEPARTMENT
River to Sea TPO Meeting US 92/International Speedway Boulevard
Transportation Projects
Lenoir County Comprehensive Transportation Plan DRAFT Maps and Recommendations John A. (Andy) Bailey April 16, 2018.
Highway 169 Bridge Replacement & Pavement Resurfacing
SANDY SPRINGS CITY COUNCIL MEETING
North Main Street Intersection Improvements at Route 460 Bypass
Tampa Bay Regional Strategic Freight Plan
Early Voting Starts Oct. 20 | Election Day Nov
CH 42 & TH 13 Construction Update
Volusia TPO Board Meeting January 22, 2013
1200 West Widening and Reconstruction Project
Construction Management & Engineering
Committee Update August 27, 2018.
Lenoir County Comprehensive Transportation Plan DRAFT Maps and Recommendations John A. (Andy) Bailey April 9, 2018.
US 1 Project “A” FM No.: Work Mix: Intersection Improvement At: Park Ave. Phase: Design Year Funded: 2020 Cost: $200,000.
Monterey County Project Report for Measure X Expenditures
Metropolitan District | mndot.gov
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
ARCHIE BRIGGS Traffic Calming
National Organization of Minority Engineers Leadership Summit
Presentation transcript:

Kerr Tar Project Update – June 2016 Joey Hopkins, Division Engineer

STIP Projects I-85 maintenance, north of NC 56 to US 158, $5M US 501 widening to 4-lane divided: R-2241 Section A, NC 49 to Halifax Road (SR 1521), $39M Sections B and C, Halifax Road to Virginia state line I-85 maintenance, north of NC 56 to US 158, $5M I-5787, pavement rehabilitation, under construction I-5843, structure and signing rehabilitation I-5819, drainage rehabilitation I-85 maintenance, US 158 to Virginia state line, $164M I-0914, pavement rehabilitation, sign upgrades, ITS Bridge replacement projects US 501 widening to 4-lane divided: R-2241 Section A, NC 49 to Halifax Road (SR 1521), $39M, under construction, completion late 2016 Sections B and C, Halifax Road to Virginia state line, unfunded ($50M) I-85 maintenance, north of NC 56 to US 158, $5M I-5787, pavement rehabilitation, under construction, late 2016 completion I-5843, structure and signing rehabilitation, completion 2017 (limited info, 2017 is last year with funding) I-5819, drainage rehabilitation, completion 2017 (limited info, 2017 is last year with funding) I-85 maintenance, US 158 to Virginia state line, $164M I-0914, pavement rehabilitation, sign upgrades, ITS Bridge replacement projects

STIP Projects Dabney Dr (SR 1162) from US 158 Business to Coble Blvd, Henderson Corridor upgrade U-5890, $9M Beckford Dr (SR 1165) from Harrison St to ~ Social Security Administration building, Henderson Widen to 3-lane U-4916, $1M In progress by city Dabney Dr (SR 1162) from US 158 Business to Coble Blvd, Henderson Corridor upgrade U-5890, $9M, ROW 2020, CON 2022 Beckford Dr (SR 1165) from Harrison St to ~ Social Security Administration building, Henderson Widen to 3-lane, C&G, sidewalks U-4916, $1M, CON 2017 ROW in progress by city, delay due to being detour route for I-85

STIP Projects 26th St in Butner, upgrade and extend over I-85 U-5829, $8M, subject to reprioritization Person County Airport taxiway extension AV-5794, $1.0M, subject to reprioritization Sidewalk and crosswalk enhancements in Oxford C-5569, $0.3M, ROW in progress by town Sidewalks at Stovall Town Center C-5570, $0.1M, in progress by town 26th St in Butner, upgrade and extend over I-85 U-5829, $8M, subject to reprioritization Person County Airport taxiway extension AV-5794, $1.0M, subject to reprioritization Sidewalk and crosswalk enhancements in Oxford C-5569, $0.3M, ROW in progress by town Sidewalks at Stovall Town Center C-5570, $0.1M, in progress by town

STIP Projects Butner greenway extension Cross county trail C-5567, $0.3M, in progress by town Cross county trail South Main St in Louisburg Extend sidewalk to NC 56 West C-5527, $0.6M, in progress by town Sidewalks at various locations in Louisburg C-5568, $0.3, in progress by town Butner greenway extension (in MPO area) C-5567, $0.3M, in progress by town Cross county trail (in MPO area, connects to Lyon Station Greenway) South Main St in Louisburg Extend sidewalk to NC 56 West C-5527, $0.6M, in progress by town Sidewalks at various locations in Louisburg C-5568, $0.3, in progress by town

Safety Projects US 501 at US 158 (Oxford Road) Signalize and realign, remove slip lane W-5601FD, $0.2M Stewart Farm Rd (SR 1518) from Henderson to S Cokesbury Rd Paved shoulders, 5 miles W-5515, $1.7M US 501 at US 158 (Oxford Road) Signalize and realign, remove slip lane Estimated construction late 2017 W-5601FD, $0.2M Stewart Farm Rd (SR 1518) from Henderson to S Cokesbury Rd Paved shoulders, 5 miles W-5515, $1.7M, need to re-bid

High Scoring Regional Tier Projects in P4.0 US 501 in Roxboro, convert 5-lane to 4-lane divided From Morehead St to NC 49 (N. Main St), score = 45.10 Includes intersection project at Carver Dr From NC 157 (S. Main St) to Morehead St, score = 44.68 Includes intersection projects at NC 49 and NC 157 From Weeks Dr to NC 157 (S. Main St), score = 41.55 Includes intersection projects at NC 157 and US 158 US 401 in Louisburg, widen to 4-lane divided From Nash St to Main St, score = 44.32 KARTS expansion vans Two separate projects with one van each, score = 52.05 US 501 in Roxboro, convert 5-lane to 4-lane divided with bicycle & pedestrian accommodations From Morehead St to NC 49 (N. Main St), score = 45.10 Includes intersection project at Carver Dr (score 48.52) From NC 157 (S. Main St) to Morehead St, score = 44.68 Includes intersection projects at NC 49 (Chub Lake, 44.99) and NC 157 (S. Main St, 49.19) From Weeks Dr to NC 157 (S. Main St), score = 41.55, below expected funding line Includes intersection projects at NC 157 and US 158 (Oxford Rd, 47.40, W project here) US 401 in Louisburg, widen to 4-lane divided From Nash St to Main St, score = 44.32 KARTS expansion vans Two separate projects with one van each, score = 52.05

QUESTIONS? QUESTIONS?