Not baseline: ASIC, DCFEB R&D if L1A latency > 10 ms

Slides:



Advertisements
Similar presentations
The Belle Silicon Vertex Detector T. Tsuboyama (KEK) 6 Dec Workshop New Hadrons with Various Flavors 6-7 Dec Nagoya Univ.
Advertisements

1 Run 9 PHENIX Goals and Performance John Haggerty Brookhaven National Laboratory June 4, 2009.
1 News and Miscellaneous UPO May Didier Contardo, Jeff Spalding -Phase 2 Scope and Cost exercise.
A Silicon Disk Tracker in forward direction for STAR News since November 2000 Physics Capabilities capabilities Requirements / Potential Technologies Possible.
1 EMCal design MICE collaboration meeting Fermilab Rikard Sandström.
LHeC : Muon Systems L. Pontecorvo.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
1 MUON UPGRADE: ME0 GMM All engineering drawings from Sasha Surkhov PRELIMINARY !!
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Add redundancy (power) to trigger where most needed  First and innermost.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
Study of the Optimum Momentum Resolution of CMS Experiment Presented by: Timothy McDonald Faculty Mentor: Darin Acosta.
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
Possibility for Double DVCS measurement in Hall A Alexandre Camsonne SBS Meeting June 4 th 2013.
CMS-GRPC status Imad Laktineh for the GRPC-CMS groups.
Performance of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger,
C. F. Bedoya. C. F. Bedoya May 13th, * The goal was to establish a baseline plan for DT in Phase 2, (although some aspects of phase 1 also needed.
PHASE-1B ACTIVITIES L. Demaria – INFN Torino. Introduction  The inner layer of the Phase 1 Pixel detector is exposed to very high level of irradiation.
25-Oct-2013 Upgrades Week “Muon plans for the Phase 2 TP” J. Hauser, UCLA  Phase 2 muon plans (presented at ECFA),  What’s new since Upgrade Week  New.
T. Kawamoto1 ATLAS muon small wheels for ATLAS phase-1 upgrade LHCC T. Kawamoto (New) small wheels ? Why new small wheels for high.
P. Dupieux (ALICE), A. Cardini (LHCb) M. Abbrescia, K. Hoepfner, A. Safonov (CMS) Ch. Amelung, O. Kortner, S. Veneziano (ATLAS) 4t meeting with the HL-LHC.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
CERN-Korea Committee 1 CMS report. CMS publications 2 Pub rate steady, ~2.5/week 391 papers submitted: +23 CRAFT based +25 ready for CWR or later +6 PubDraft.
General Muon Meeting, 03-March-2014 Jay Hauser “Update on Phase 2 muon Technical Proposal”  Recent developments:  ME0 inserted into HGCAL as for other.
News and Miscellaneous UPO Jan Didier Contardo, Jeff Spalding 1 UPO Jan Workshop on Upgrade simulations in 2013 (Jan. 17/18) -ESP in.
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
Dec 2002 Craig Ogilvie 1 Physics Goals of Si Vertex Detector  Physics priorities latter part of this decade –spin carried by gluons:  G vs x –modification.
TeV muons: from data handling to new physics phenomena Vladimir Palichik JINR, Dubna NEC’2009 Varna, September 07-14, 2009.
+ GE2/1 Case Considerations Alexei Safonov. + CMS Muon Upgrades CMS Technical Proposal in its part related to muon systems lists following: MEX/1 electronics.
Fabiola Gianotti, 14/10/20031  s = 28 TeV upgrade L = upgrade “SLHC = Super-LHC” vs Question : do we want to consider also the energy upgrade option.
Upgrade intro and report on DESY Upgrade Meeting 5 May 2010 Norman Gee.
27-Jan-2014 Upgrade Steering Group “Update on Phase 2 TP - muons” J. Hauser, UCLA  Update on progress for TP:  2 slides follow to be shown at USG02 (Upgrade.
P06 – Muons Alexei Safonov, L2 Manager, September 17, Director's Progress Review --Muon Overview A. Safonov, 2015 September 17.
GMM, 05-Jul-2015 Jay Hauser Another look at CSC ME3/1, ME4/1 descoping 1  Recall descoping scenarios for 235 and 200 MChF:  Tiziano:
Phase-2 Muon Performance Projections and Evaluation D. Abbaneo, M. Abbrescia, E. Barberis, C. Bedoya, M. Dallavalle, J. Hauser, K. Hoepfner, V. Khotilovich,
Quark Matter 2002, July 18-24, Nantes, France Dimuon Production from Au-Au Collisions at Ming Xiong Liu Los Alamos National Laboratory (for the PHENIX.
US CMS Phase 2 R&D Discussion 30-July-2013 “Phase 2 muon R&D” J. Hauser, UCLA  Expected wire accumulated charge at 3000 fb-1 for various chamber types.
14 Aug. 08DOE Review John Huth Future Harvard ATLAS Plans John Huth.
ME0 ME0 Baseline – Design, Project Planning & Execution – Marcus Hohlmann Florida Institute of Technology Comprehensive Review – Phase 2 Muon Upgrade,
The Status of the CBM Experiment
University of Wisconsin
Using IP Chi-Square Probability
Some input to the discussion for the design requirements of the GridPixel Tracker and L1thack trigger. Here are some thoughts about possible detector layout.
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Gas Detectors (GEM) The 6th Egyptian school for high energy physics
A proposal to equip the high eta muon stations with High Rate GRPC
Layout of Detectors for CLIC
CMS muon detectors and muon system performance
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Studies for Phase-II Muon Detector (|η| = ) – Plans
Update on DECAL and some questions
Workshop Goals for the Detector Groups
GEM Upgrade Projects: Schedule
for the transition region on behalf of the RPC upgrade group
ATLAS B-physics important periods
Anna Colaleo - INFN-Bari On behalf of the CMS Muon group
The digital read-out for the CSC system of the TOTEM experiment at LHC
LHCb Muon Detector MWPC & GEM
Preparation of the CLAS12 First Experiment Status and Time-Line
Performance of a Multigap RPC prototype for the LHCb Muon System
Project Presentations August 5th, 2004
Niels Tuning (Outer Tracker Group LHCb)
The digital read-out for the CSC system of the TOTEM experiment at LHC
SLHC Non-Inner Detector Upgrades
LHCb Particle Identification and Performance
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Contents First section: pion and proton misidentification probabilities as Loose or Tight Muons. Measurements using Jet-triggered data (from run).
Plans for the 2004 CSC Beam Test
Presentation transcript:

Not baseline: ASIC, DCFEB R&D if L1A latency > 10 ms At Phase 2 baseline 10 ms and 500 kHz lose ~1% of cathode data, beyond that need to replace DCFEBs 13.8 MChF, 8 months steady crane use See JH talk at 12-Mar-2013 Trigger TPSG meeting: https://indico.cern.ch/conferenceDisplay.py?confId=239752 4.5x as many parts as for ME1/1 refurbishment A good part of cost is for re-engineering ASICs: “Buckeye” low-noise preamps, comparators for trigger Power: re-engineer the DCFEB design Significant engineering needs to start ASAP if LS2 installation 3 x 5 or 5 x 3 FTE-years ~$x.x M? S. Durkin

Summary Longevity of CSC test beam studies at GIF, GIF++ Need some infrastructure & travel support during 2014 and 2015 Add a CSC gas monitor? Local triggering development with GE1/1 Need engineering (currently on M&O) and travel support during 2014-2017 Develop commercialized GEM chambers More discussion needed to define the scope and short-term needs Test beam studies of ME0 and possible construction role Scope could be modest in 2014, but much larger later if U.S. to lead this project: needs coordination with endcap calor R&D plan, overall CMS plan HV mods for GEMs ASIC, DCFEB development for CSCs Contingent on L1A latency to be extended beyond 10 ms Serious engineering required depending on install. schedule

List of muon R&D proponents Paul Karchin (WSU) Alexei Safonov (TAMU) Bob Clare (UCR) Jay Hauser (UCLA) Stan Durkin (tHE Ohio State U.) Ela Barberis (NEU) Armando Lanaro (UW) Gena Mitselmakher (UF) Marcus Hohlmann (FIT) Oleg Prokofiev (Fermilab)

Backup slides

References Discussion forums: General Muon Meetings (GMM) on Mondays at 5 p.m. in 40-R-B10 Forward detector working group (FDWG), Rusack and Mannelli Upgrade Project Office (UPO) meetings biweekly Friday afternoons Building on DESY Upgrades Week, June 3-7 https://indico.cern.ch/conferenceOtherViews.py?confId=236161&view=standard Upgrade ideas were summarized 19-June in the weekly CSC meeting: https://indico.cern.ch/conferenceDisplay.py?confId=258486 Muon upgrades: a first costing exercise for UPO on 28-June: See https://indico.cern.ch/conferenceDisplay.py?confId=259774 but costing slides removed due to “sensitivity” (have not been reviewed)

Text description of forward muon upgrade costing Baseline forward muon upgrades: GE1/1:  2 layers of GEMs in the eta range 1.55-2.2; most salient motivation is for the muon trigger: lower muon Pt threshold from ~25 to ~15 GeV.  Obviously well costed & reviewed already. GE2/1:  2 layers of GEMs in the eta range 1.65-2.4, adds redundancy to 2nd station, most salient motivation is to provide acceptable single muon trigger rate in rapidity region 2.1-2.4 with threshold of ~25 GeV. Base the cost estimate on having similar segmentation to GE1/1, extrapolate production (not R&D) costs from GE1/1. RE3/1 and/or RE4/1:  1 layer of multi-gap GRPCs covering eta 1.8-2.4, motivated primarily by fine timing to identify muon vertex and to provide a good handle on slow particles.  The proponents claim this technology is inexpensive, and these would be single chambers, so 1 or two stations could optimistically be 0.5x or 1.0x the cost of GE1/1, respectively (some R&D for TDCs and CMS compatible readout probably required). Imad Laktineh has cost estimates in his DESY Upgrades Week talk. ME0 small front tagger: covers rapidity 2.2-4.0, to be costed assuming 6 layers of GEMs, 2x finer segmentation than GE1/1.  Note that it is possible to reduce cost per area for chambers and cost per channel electronics up to a factor of 3 over GE1/1 if HE is rebuilt with this basic technology, since economies of scale that are thought to be possible will be needed for that.  We may need to add some cost item that represents additional shielding and iron to improve field strength within the space of the present eta=3 cone. Iron toroids option: motivation is triggering capability at high rapidity (assume coverage 2.4-4.0), overlap with rapidity range of LHCb, ability to capture a large rate of dimuons from e.g. B0s→mm.  Currently thought unlikely, since HF needs to be relocated and the current HF may withstand 3000 fb-1.  Also forward tracker needs to achieve decent (<4%) momentum resolution to resolve B0s and B0d peaks.  Very well costed already for the basic iron, magnet, support structure, and need to add cost of 3 or 4 stations of double- layer detectors, by scaling up from the GE1/1 cost estimate. Other options that have been discussed but not to be costed now: Large ME0: diminishes the case for GE1/1, only possible if calorimeter rebuilt, and requires negative arguments that CSC station ME1/1 is insufficient for rapidity 1.5-2.1. Back tagger: thought far inferior to front tagger: long lever arm for matching with forward pixel upgrade, much iron contributing multiple scattering, and larger so more costly.

Elements of the Phase 2 muon upgrade costing GE1/1 and GE2/1 for trigger, covering eta 1.55-2.4 Assume 2 layers of GEM detectors RE3/1 and RE4/1 for fine timing, covering eta 1.8-2.4 Assume 1 layer each of GRPC multigap detectors Small ME0 front tagger, part of new HE, cover eta 2.2-4.0 Assume 6 layers of GEM technology assumed Iron toroids option covering eta 2.3-4.0 Assume 3 iron disks, 4 station each of GEM detectors

ME0 muon tagger at back of a new HE Additional EE/HE coverage Coverage options: In red: small ME0 ring (top), large ME0 ring (bottom) {1.5, 2.4} < |h| < 3.5 or so Best region for muons (more bending and less multiple scattering) Inner radius shielding needed Will limit maximum h New technology allows >>1 MHz/cm2 “Integrated” option Build all of HE with GEM technology, for example