VSO Integration Testing

Slides:



Advertisements
Similar presentations
Client Acceptance TestChair for Applied Software Engineering1 VSO Client Acceptance Test.
Advertisements

Autonomous Tracking Unit (New Name -- Same Great Project) John Berglund Randy Cuaycong Wes Day Andrew Fikes Kamran Shah Spring 1999 CPSC 483 Midterm Evaluation.
Multi-Mode Survey Management An Approach to Addressing its Challenges
Elsevier |MC Strategies 2009 LMS Strategic Planning November 19, 2008.
Roadmap Agenda  iET Process Analyzer 3.0  iET CMDB Intelligence & Discovery 2.1  iET Enterprise 12  iET ITSM 6  iET Mobile ITSM for.
Name Matrix No CHIA EE LOON(LEADER) OW CHEE YEE LAURA TIONG UNG KAH CAT200 Integrated Software Development Workshop Storyboard.
Ellucian Mobile: Don’t text and drive, kids!
Team: Maya Zalcberg Diana Attar Levona Hershtik Academic advisor: Prof. Ehud Gudes ADD Presentation.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
29 April 2005 Part B Final Presentation Peripheral Devices For ML310 Board Project name : Spring Semester 2005 Final Presentation Presenting : Erez Cohen.
Server selection Multiple servers Add a server UDN selection Channel selection Time selection Duration selection Channel window Time window Current time.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
SP2 Mikael Nystrom. Agenda Översikt Installation.
Asynchronous Web Services Approach Enrique de Andrés Saiz.
In association with Technion and Qualcomm. Project supervisor: Tatyana Finkel. Technion Israel Institute of Technology.
Project 1 Online multi-user video monitoring system.
Take a leap towards the most promising technology
Project Overview and Requirements Katherine Mawhinney.
Example. Outline How to get live stream How to set audio on/off How to get schedule logs How to query events How to get metadata logs How to get DI status.
Local Alarm Station Data Acquisition, Storage and Visualization for Radiation Portal Monitor (RPM).
ScreenMonkey v3. 7 (Tested Windows 7 64bits) screenmonkey
MediaServer:1 Device Template Version 1.01 Date: June 25, 2002 For UPnP™ Version 1.0 Status: Standardized DCP File from: MediaServer1.0.pdf Author: John.
WP4 – Sound Object Identification WP5 – Enriched Access Tools.
Pre-OTS Testing in Penticton Sonja Vrcic Socorro, December 11, 2007.
70-291: MCSE Guide to Managing a Microsoft Windows Server 2003 Network, Enhanced Chapter 11: Internet Authentication Service.
ERCOT SCR745 Update ERCOT Outage Evaluation Phase 1 and Phase 2 TDTWG April 2, 2008.
March 20, 2006 © 2005 IBM Corporation Distributed Multimodal Synchronization Protocol (DMSP) Chris Cross IETF 65 March 20, 2006 With Contribution from.
JSF Framework Java Server Faces Presented by Songkran Totiya (6/10/2014)
Joe Cohen Presentation Overview  Project definition and requirements  Solution process and explanation  Methodology.
12.2C: Project (Design/Implementation). Lesson objectives O have experience of using prototyping to create solutions for project work O be aware of the.
A Technical Overview Bill Branan DuraCloud Technical Lead.
Example. Outline How to get live stream How to set audio on/off How to get schedule Logs How to query events How to get DI/DO status How to control DO.
Multi-track Concrete Music Digital Performer and Basic Signal Processing.
1 Microsoft Outlook Web Access Outlook Web Access Overview Outlook Web Access Environments.
Hands-On Microsoft Windows Server 2008 Chapter 5 Configuring Windows Server 2008 Printing.
VSO – Virtual Symphony Orchestra | System Design Review: Concurrency | Christian Klaus Kern Virtual Symphony Orchestra System Design Review:
Persistent Data Management Daniel Angermeier
Audio Subsystem: Analysis Model Review ordering party:Bayerischer Rundfunk Orchestra TU München, Department of Informatics Chair of Applied Software Engineering.
INTRODUCTION TO COMPUTER NETWORKS BY: SAIKUMAR III MSCS, Nalanda College.
LAN Bridge Spanning Tree Animation Simon Arlott. Broadcast Networks ● In a broadcast LAN, all packets are sent to all hosts – even if they are not the.
Local Alarm Station Data Acquisition, Storage and Visualization for Radiation Portal Monitor (RPM).
70-293: MCSE Guide to Planning a Microsoft Windows Server 2003 Network, Enhanced Chapter 12: Planning and Implementing Server Availability and Scalability.
August 2012 ABB STOTZ-KONTAKT GmbH ABB i-bus® KNX Energy Module EM/S Energy Actuator SE/S © ABB 20 May 2018 | Slide 1.
Using Integrity Change Packages for Development
Compact GuardLogix 5370 Controller
Introduction to Event-Driven Programming
WinCC OA Ultra Thin Client
MULE Final Presentation
Infusion Management and Auto Pump Programming
Example.
LCGAA nightlies infrastructure
Features and functionality of the Iterapi platform for internet-based psychological treatment  George Vlaescu, Alexander Alasjö, Alexander Miloff, Per.
Introduction to Networking
ECE 477 Design Review Team 8  Spring 2007
Algorithms, Data Structures and Interfaces of the UI
CMAST Update March 25, 2014.
ACTi New Features in NVR3.0.06
CCNA 3 v3 JEOPARDY Module 8 CCNA3 v3 Module 8 K. Martin.
Virtual Symphony Orchestra
VSOUi - VSOOrchestra Integration Test
MOBILE CONTROLLED LIGHTING Prototype
Video Playback Time-scale quick switch Advanced Camera Options Setup
ACTi New Features in August, 2013.
XProtect R New features
Solving Equations 3x+7 –7 13 –7 =.
Software Updation Start software, it will be displayed following main screen: Click on 'Activate (2017) or [ Go to 'More Services' →'Software Information→
Software Activation for Existing Client If you are already registered with us and using our product. Start software, it will be displayed following main.
Expense Tracking 1.) Enrichment tab > Miscellaneous > Expense Tracking 2.) On the Expense Tracking Listing page, click “Add Expense”
Video Playback Time-scale quick switch Advanced Camera Options Setup
Services and Procedures Current status
Presentation transcript:

VSO Integration Testing Catinca Golesteanu 19 January 2006

Agenda 1.VSOVideo - VSOOrchestra Test 2.VSOAudio - VSOOrchestra Test 3.VSOTracking - VSOOrchestra Test 4.VSOUI - VSOOrchestra Test

Overview of the VSO System VSOUI VSO- Tracking VSO- Orchestra VSOVideo VSOAudio VSO-Application

1. Double Test: VSOVideo -VSOOrchestra Tracking VSOUI VSO- Orchestra VSOAudio VSOVideo

Video Framework - Orchestra Framework Phases Video Framework Orchestra Framework Phase I protocol enhancement implementation of protocols Phase II Phase III ... Christian Kern

Status - Integration Orchestra Framework nearly complete integrated enhanced protocol will be implemented soon fully integrated in VSO client application Christian Kern

2. Double Test: VSOAudio -VSOOrchestra Tracking VSOUI VSO- Orchestra VSOVideo VSOAudio

Audio - VSO Application Phase I VSOAudioController: +InitWithSources() +Reset() VSOAppCtrl Dimitri Alexeev

Audio - Orchestra Audio Orchestra Phase I Ensemble Phase II Phase III Position Volume AudioFile Ensemble Phase II Conductor Phase III Tempo Piece Dimitri Alexeev

Status - Integration Status item I Status item II Integration in VSO Application status Dimitri Alexeev

3. Double Test: VSOTracking -VSOOrchestra VSOUI VSO- Orchestra VSOVideo VSOAudio VSOVideo

Tracking – VSO Application Phases Tracking VSO Application Phase I Controlling Actions Configuring Actions Phase II Device List Device handling Orchestra Information Phase III View drawing View Context Phase IV Conductor setter Conductor Information Periklis Tsirakidis

Tracking -Orchestra Phases Tracking Orchestra Phase I Phase II Tempo notification Volume notification Reading notifications Phase II Measure notification Object notification Phase III No conducting notification Phase IV Listener mode notifications Periklis Tsirakidis

Status - Integration Algorithms 100% integrated Framework internal event flow 100% tested Algorithms integration 80% tested Notifications defined Integration into VSO application in progress Periklis Tsirakidis

4. Double Test: VSOUI -VSOOrchestra Tracking VSOUI VSO- Orchestra VSOVideo VSOAudio

UI - VSO Application Phases UI VSOApplication Phase I Phase II Initialize method a complete loaded orchestra Phase II possibility to show different camera types a bundle of cameras Phase III possibility to display tracking Tracking view Phase IV UI interface for switching between modes (Screensaver-, Listener-, Conductormode) possibility to switch between modes Leon v. Tippelskirch

UI - Orchestra UI Orchestra Leon v. Tippelskirch Phases Phase I Add & remove musician Attach audio & video file Responding to the correlated actions Phase II Load & save orchestra configuration Phase III Show & move musicians & Conductor Provide conductor & musician positions (set, get) Phase IV Initialize & start server mode Phase V Stop server mode Leon v. Tippelskirch

Status - Integration UI - VSO Application Phase 1 completed Phase II-IV todo until the CAT UI - Orchestra Phase 1-II completed Phase III work in progress Phase IV todo until the CAT Leon v. Tippelskirch

Overview of VSO Integration Tests VSOUI – VSOOrchestra VSOUI - VSOOrchestra - VSOVideo VSOUI VSO Tracking VSOTracking – VSOOrchestra Test VSO System VSOTracking - VSOOrchestra - VSOAudio VSO Orchestra VSOAudio – VSOOrchestra VSOOrchestra- VSOVideo - VSOAudio VSOAudio VSOVideo – VSOOrchestra VSOVideo