December 6, 2007AIP /02 P Bellomo - QE Magnet Power System Upgrade1 AIP /02 Review LINAC SECTORS 22 AND 23 QE MAGNET POWER SYSTEM UPGRADE.
Ernest Williams FAC November 2008 Control Systems Software Section 1 Controls System Installation Status Ernest Williams for Controls Department.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
19-21 Dec 20075th ATF2 Project Meeting1 ATF2 High Availability DC Magnet Power Supplies By: Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam*
Hamid Shoaee Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory Controls Department LCLS Maintenance.
Status of mTCA Stripline BPM Development June 4-5, 2012 Dan Van Winkle for BPM team: Sonya Hoobler, Tom Himel, Jeff Olsen, Steve Smith, Till Straumann,
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
18. June 2003EPICS WS Control of Digital Power Supplies Andreas Lüdeke Swiss Light Source / PSI 20 May 2003 EPICS Collaboration Meeting.
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
SPEAR Insertion Device Controls Upgrade Status Arturo Alarcon January, 2014.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
Digital Interface for MCOR’s Stan Cohen Albuquerque, NM From the June 9, 2005 presentation by Dr. Stan Cohen - notes on slides 11 and 12 added.
21 March 2007ATF2 Power Supplies ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David MacNair and Briant Lam*
BDS Magnet-Power System-Facility Optimization1 ILC BDS Kickoff Meeting Basis for Magnet, Power System and Cooling Facility Optimization Discussion Paul.
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
Overview of Tracker Interlocks Designed to protect tracker equipment, in particular the VLPC cassettes, from damage due to failure in part of the tracker.
September 19-20, 2007 A.Zaltsman EBIS RF Systems RF System Overview Alex Zaltsman September 19-20, 2007 DOE Annual Review.
K. Luchini LCLS Controls, July 1, 2005 SLAC Aware IOC EPICS Magnet Functional Requirements Introduction Magnet Functions.
Magnet Controls GroupOctober 4, Scope, Cost Estimate and Schedule To Complete The LCLS Magnet PS Controls P Bellomo and Kristi Luchini.
K. Luchini LCLS Week, October 26, 2005 Magnet Controls K. Luchini Overview Hardware Software SLC Aware IOC Database Modeling.
Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 LLRF Outline System Concept Review Requirements.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
ILC BDS Kickoff Meeting Magnet Power Supplies RDR Concepts and Completeness Paul Bellomo SLAC Power Conversion Department October, 2007.
LCLS Control Group Power Supply Control Power Supply System Cost Possible solutions Embedded micro IOC MacNair’s solution PSI solution SNS solution.
LCLS Sector 21 - BC1 Power Supply Design September 15, LCLS Sector 21 and BC1 Power Supplies Paul Bellomo, Antonio de Lira, Dave Mac Nair.
PSI Power Supply Controls MedAustron Controls Workshop 1 PR a-FMO-PSI_Power_Supply_Controls.pptx F. Moser - PSI Power Supply Controls 1.
October, 2009 Controls System Kevin Brown/Brian Oerter October, 2009 Internal Review.
1 The Cost & Schedule to Accomplish the Transition Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.
Marjorie Widmeyer LCLS Injector Magnet Power March 30, LCLS Injector, Sector 21 and BC1 DC Magnet Power and Control.
The recent history and current state of the linac control system Tom Himel Dec 1,
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
K. Luchini LCLS Injector /BC1 Magnet PS Final Design Review, March 30, Injector and BC1 Magnet PS Controls K. Luchini.
Patrick’s Updates - 8/30/11 (one slide for each of the following) 1.XTCAV Project 2.ASTA Gun Test Facility Instrumentation & Controls 3.Fast wire scanner.
Debbie Rogind LCLS Magnet June 15, 2006 LCLS Magnet Control Challenging Design Issues “How to integrate the legacy system.
Control System Overview J. Frederick Bartlett Fermilab June 1,1999.
K. Luchini LCLS Lehman Review - Controls Breakout, May 11th 2005 Magnet Power Supplies K. Luchini Overview Hardware Software.
Magnet Low Current PS Upgrade Kristi Luchini,Sandeep Babel, Till Straumann, Mitch D’Ewart, Briant Lam, Dave MacNair May 19, 2016 VME to Emedded Industrial.
January 12, 2006 ATF2 DC Magnet Power Supplies1 Paul Bellomo and Briant Lam.
SNS Integrated Control System ORACLE –JERI DB Generation April 27, 2004 Coles Sibley Jeff Patton.
LCLS Commissioning & Operations High Level Software
SNS Status Report Karen S. White 10/15/08.
ILC RTML Meeting EDR Planning for Magnet Power Systems
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
ATF2 Magnet Power Supplies
LLRF Controls Outline Requirements External Interfaces Schedule Design
HAPS Controls Glen White ATF2 Software Review Workshop, LAL, June 2008
LCLS Commissioning & Operations High Level Software
Programmable Logic Controllers (PLCs) An Overview.
EPICS Controls Steve Lewis 13 December 2007
LLRF and Beam-based Longitudinal Feedback Readiness
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
LCLS Event System - Software
LLRF Control System Outline Scope Requirements Design Considerations
Timing and Event System for the LCLS Electron Accelerator
Magnet PS Controls Hardware Status
Injector, Sector 21 and BC1 Bulk Power Supplies
Magnet Controls K. Luchini
LLRF Control System Outline Scope Requirements Options considered
Low Level RF Design Outline Scope Requirements Options considered
EPICS at SLAC EPICS/SLC Controls Co-existence LCLS Injector Support
2007 Downtime Controls Installation
Control System Overview Hamid Shoaee LCLS Control System Manager
Low Level RF Status Outline Overview showing hardware instances
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
LCLS Control System Personnel Linac & BC2 Controls progress
Rack installation and local tests for the MEBT Chopper Rack
SLC-Aware IOC Magnet Functional Requirements
Presentation transcript:

AIP 67-2901/02 P Bellomo - QE Magnet Power System Upgrade AIP 67-2901/02 Review LINAC SECTORS 22 AND 23 QE MAGNET POWER SYSTEM UPGRADE Paul Bellomo / Serge Ratkovsky December 6, 2007 controls added by K. Luchini on April 28, 2008 controls cost updated April 21, 2009 December 6, 2007 AIP 67-2901/02 P Bellomo - QE Magnet Power System Upgrade

RESTATED SCOPE AND MOTIVATIONS Scope on October 31, 2007 Upgrade “QE” magnet power supplies and controllers in LINAC Sectors 22 and 23 Two new “bulk” power supplies and sixteen new “boost” supplies New Ethernet power supply controllers, new zero flux current transductors, new PPS chassis Motivations Equipment more than 20 years old and at end of useful life. Unreliable, lack of available parts will affect future LINAC operations Better short and long-term current stability Interface with new EPICS-based control system for better diagnostics Lower line harmonics, noise, power consumption December 6, 2007 AIP 67-2901/02 P Bellomo - QE Magnet Power System Upgrade

CHANGES SINCE 07/10/31 REVIEW Review Topics Downtime length Two to three bulk power supplies Possible purchase of new rack PPS elimination – use magnet covers Commitment of Controls Department to support this effort December 6, 2007 AIP 67-2901/02 P Bellomo - QE Magnet Power System Upgrade 3

AIP 67-2901/02 P Bellomo - QE Magnet Power System Upgrade 1. DOWNTIME LENGTH Original and Present Understandings and Plan Issue October 31, 2007 Plan December 6, 2007 Plan Downtime 10 weeks – 10/1 through 12/15/08 4 weeks – 10/1 through 10/31/08 Build plan Refurbish racks and assemble/test in field Purchase new racks and assemble / test in B15 December 6, 2007 AIP 67-2901/02 P Bellomo - QE Magnet Power System Upgrade 4

2. TWO TO THREE BULK POWER SUPPLIES Mode / PS Type SLC LCLS Bulk 200A 139V 25A 17V Boost 20A 3.7V Change in rating and use of 3 bulk PS: 1. Better match of rating to load (225A – 200A or 25A) in SLC and LCLS modes 2. Less expensive, smaller and COTS December 6, 2007 AIP 67-2901/02 P Bellomo - QE Magnet Power System Upgrade

AIP 67-2901/02 P Bellomo - QE Magnet Power System Upgrade THE EXISTING December 6, 2007 AIP 67-2901/02 P Bellomo - QE Magnet Power System Upgrade 6

THE REVISED BULK PS TOPOLOGY Bulk power supplies were identified as the critical path item if custom designed – COTS desired December 6, 2007 AIP 67-2901/02 P Bellomo - QE Magnet Power System Upgrade 7

AIP 67-2901/02 P Bellomo - QE Magnet Power System Upgrade CONTROL OF 3 PS DIAGRAM Black items are provided by power supply manufacturer\ Red items are provided by SLAC December 6, 2007 AIP 67-2901/02 P Bellomo - QE Magnet Power System Upgrade 8

3. POSSIBLE NEW RACK PURCHASE The issue is time! A 4 week downtime will not allow for field rack refurbishment, system assembly, and test Two new single bay racks – $4,000 * 2 = $8,000 Cost to refurbish existing racks = 2 racks * 2 techs * 9 days / rack * 1 month / 20 days *$8.5k / month = $15,300 + $500 materials = $15,800 Note: Costs are unburdened and are for comparison purposes only December 6, 2007 AIP 67-2901/02 P Bellomo - QE Magnet Power System Upgrade

4. PPS ELIMINATION - USE MAGNET COVERS PPS System Magnet Covers EDI: 1engr*0.5mon*$15.1k/mon + 1coord*0.5mon*$10.5k/mon + 1 tech * 0.5day/chassis * 4 chassis* 1mon/20days * $8.5k/mon = $13.7k EDI: Previously completed M & S: 4 chassis * $5k/chassis = $20k M & S: $300*16 = $4.8k Assembly/Install: 1tech*3 days/chassis *4 chassis *1mon/20days * $8.5k/mon = $4.8k Assembly/Install: 16manhours/cover *16 covers $77.50/hour = $19.8k Total cost: $38.5k Total cost: $24.6k Notes: Costs are unburdened and are shown for comparison purposes Consistency with Sector 20, 21 and 24 magnets December 6, 2007 AIP 67-2901/02 P Bellomo - QE Magnet Power System Upgrade 10

5. CONTROLS COMMITMENT – LAST SLIDE Network switch purchase needed Soft IOCs exist Programming support to recognize new systems (operating programs, displays, etc already written) December 6, 2007 AIP 67-2901/02 P Bellomo - QE Magnet Power System Upgrade

for QE Upgrade (per sector) Network Block Diagram for QE Upgrade (per sector) EPICS IOC MCOR Bulk Timing fbck ca crate Upgrade Ethernet Network Switch swh-li23-nw02 Terminal Server ts-li23-nw01 EPSC (lgps) EPSC (Q23201) EPSC (Q23301) EPSC (Q23401) EPSC (Q23501) EPSC (Q23601) EPSC (Q23701) EPSC (Q23801) EPSC( Q23901) 12

Controls Cost Estimate for QE Upgrade (per sector) Software 3-day @ $700/day $2,100.00 Database Displays ChannelWatcher, Archiver, SCORE, Alarm Handler ,LEM , Oracle Hardware Ethernet Switch: 10 ports total (9-epsc, 1-terminal server) $ 0.00 Terminal Server: 9 ports total for epsc $ 1200.00 Intra-rack cables (cat6) $ 1200.00 Total M&S: $ 2,400.00 ED&I $ 650.00 Labor $ 1000.00 Total Hardware: $ 4,450.00 Total Software: $ 2,100.00 without Burden and Contingency Total: $ 6,650.00 Contingency 10% of M&S: $ 445.00 Burden 30% of M&S: $ 1335.00 with Burden and Contingency:: $8,430.00 13

Controls Cost Estimate for MCOR Upgrade (per sector) Software Database & Displays 1.5 day $ 700.00 ChannelWatcher, Archiver,SCORE, Alarm Handler, LEM 0.5 day $ 350.00 Checkout (does not include cost of pcd engineer and pcd tech) 3-days $2,100.00 5-days @ $700/day Total : $3,500.00 Hardware (per sector) 3U Elma VME Crate (4-slot) $ 3200.00 EVR PMC Module $ 2000.00 MVME6100-0161 CPU (1 per sector, existing) $ 4000.00 Timing Cables $ 1000.00 Terminal Server: 1 port total for ioc $ 0.0 Ethernet: 3ports total (1-crate,1-ioc,1-fbck) $ 0.0 Intra-rack cables (cat6 and mcor to vme) $ 150.00 Acromag IP Carrier AVME9670 w/P0 $ 700.00 Hytec IP-ADC-8413 +/-10V, 16-bit, 16-chan adc $2500.00 Acromag ip231-16E +/-10V, 16-bit,16-chan dac $1375.00 Acromag Trans 200 Transition module $ 275.00 Total M&S: $15,200.00 ED&I Drawings $ 500.00 Labor $ 1000.00 Total Hardware: $16,700.00 Total Software: $ 4,450.00 without Burden and Contingency Total: $ 21,150.00 Contingency 10% of M&S: $ 1,520.00 Burden 30%of M&S: $ 4,560.00 with Burden and Contingency Total: $ 27,230.00 14

Total Cost QE’s and MCOR Upgrade Cost including burden and contingency QE Upgrade with Burden and Contingency $ 8,430.00 MCOR Upgrade with Burden and Contingency $ 27,230.00 Total cost per sector: $ 35,660.00 Total cost for 8 sectors: $285,280.00 Cost without burden and contingency QE Upgrade $ 6,650.00 MCOR Upgrade $ 21,150.00 Total cost per sector: $ 27,800.00 Total cost for 8 sectors: $222,400.00 Note: optional use of an mvme3100-1263 cpu and MVME721-101 with transition module will reduce the cost by $1,700.00. 15

VME Crate and I/O Front View Rear View Trans 200 Port D Port C Port B 4 3 2 1 Slot Trans 200 Port D Port C Port B Port A 4 3 2 AVME9670 1 Debug Lan 1 Lan 2 E V R P M C MVME 6100 Slot 16

VME I/O CPU with Event (Timing) 17

VME I/O For MCOR Control and Monitor 18