New Morehead State Bowling Facility

Slides:



Advertisements
Similar presentations
Framing.
Advertisements

Common Components of a Traditional Wood Framed Building
Module Reading Plans and Elevations
An Overview of the Production Process. -Stable Workforce -Controlled Environment -Less Waste -Repetitive Tasks -Lean Manufacturing Principles -Just-in-time.
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
 Nov 4 - regular class  Electrical text  Openings text  Nov 6 – no class  Nov 11 – no class – Veteran’s Day  Be sure to hug a Veteran (women only)
Johanna Mikitka AE-390 October 13, 2004
Civil Engineering & Architecture 2.3 Residential Design.
Wood Frame Construction Common Components of a Traditional Wood Framed Building Gateway – Unit 7 – Green Architecture © 2012 Project Lead The Way, Inc.Green.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
BCT 102 Residential Printreading
Constructing Homes and Other Buildings
King James Construction Cost Estimating Rob Himler, Ken Coutain, David Reger, Ruoyu Huang, Bei Xiong, Hanbing Ye.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
Cindy Miller – Cindy Frey – Ridge Road Rockwall, TX
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
Construction Framing Mr. Brock. Lumber 2x4s are not actually 2” by 4”
Chapter 35 Section Layout.
Insulation and Infiltration
Common Components of a Traditional Wood Framed Building
CONSTRUCTION Objective You will need to write all the information down but you need to highlight, mark, or note that the items in yellow are important.
Materials Lists Preparing to Build. Materials List  Complete list of all supplies needed to complete the project  Must be detailed  Dimensions of materials.
Construction Drawings
Wall Framing Grimsby Secondary School Technology Dept.
Wood Construction CTC-375.
HI Construction. Starting Out Building standards are set by: 1)State Agency 2)Federal Agency 3)Local Agency.
PowerPoint ® Presentation Unit 52 Thermal Insulation and Other Insulating Methods Thermal Insulation Exterior Insulation and Finish Systems (EIFS) Roof.
Space Planning Chapter 7 and 16.
THIS IS WITH CARLIN BRIGHT Miscellaneous Orthographic Views Which Drawing Is It? Which Drawing Is It? II Past Units
IET 120 Project #4 Matthew Porter Construction Project.
Chapter 14 Heating, Ventilation & Air conditioning (hvac)
Fire Blocking Requirements For All Buildings;
Common Components of a Traditional Wood Framed Building
Warm-up 9/20/16 What is the underlayment called below the shingles?
Common Components of a Traditional Wood Framed Building
Upon completion of this module, you will be able to:
Framing Vocabulary Stud: upright beams in the framework of a building
OBJ: SWBAT create a CAD Rendering of a Utility shed.
APPLICATIONS OF TECHNOLOGY
Maria’s Restaurant Appendix A Section 16 HVAC Building Loads
Major Steps In Building a SFR
Objective 6.02 part 2: Recognize components of construction
Do Now #7 What are the dimensions of the footing?
Construction Framing Mr. Brock.
Wood Frame Systems Civil Engineering and Architecture®
Fall 2017 Update: Physical properties and sinking fund
Construction Documents
Design of a Commercial Shopping Center
February 27, 2007 Drill – ELEVATIONS
Kiosk Discussion May 23, 2017.
Multistory Office Building
Sam Farmer, Matthew Martin, Austen Sekerak and TJ Huster
Roof System Parts Ceiling Joist: Collar tie
Warm-up 9/19/16 What template are we using?
How to Build a House.
Common Components of a Traditional Wood Framed Building
Wood Frame Construction
2018 Bond Review and Proposal
Wiring the Light and Relay
10 The Cost Approach—Part I: Reproduction/Replacement Cost
Name That Symbol!.
Common Components of a Traditional Wood Framed Building
Project: 250 West Street, Columbus, Ohio
Utility Shed Construction
Common Components of a Traditional Wood Framed Building
© OnCourse Learning.
Floor Plans and Symbols
Utility Shed Construction
Common Components of a Traditional Wood Framed Building
Community Practice Asset Management.
Presentation transcript:

New Morehead State Bowling Facility IET 499C, Fall 2012 Stephen Glossner

Why the need for a new bowling facility? The current bowling facility is Too small No restrooms Outdated Font desk area is cramped No space for maintenance/repairs

Site Work Site location Site survey Cut and fill analysis

Site location

Site Pictures Photo of site location 1 of 2

Design General floor plan Plumbing/ HVAC/ Electrical Finished floor plan 3D rendering

Current Floor Plan 36’ 4’ Total square feet = 3,640 sq./ft. 68’ Dimensions = 96’ X 36’ 96’ 15’ 13’ 28’ 23’ 8’

New Floor Plan 151’ 6” 10’ 7” Total square feet = 16,172 sq./ft. 106’ 9” 20’ 10’ 7” New Floor Plan Total square feet = 16,172 sq./ft. Dimensions = 151’ 6” X 106’ 9” 15’ 33’

Comparison Current Floor Plan New Floor Plan Total square feet = 3,640 sq./ft. Available standing room = 468 sq./ft. Area behind front desk = 184 sq./ft. Maintenance area = 144 sq./ft. Total square feet = 16,172 sq./ft. Available standing room = 5618 sq./ft. Area behind front desk = 380 sq./ft. Maintenance area = 1121 sq./ft.

Plumbing Plan Men’s restroom Woman’s restroom -handicapped stall -three urinals -double sink Woman’s restroom -handicapped stall -two additional stalls -double sink

HVAC Plan Forced centralized air system with outside unit mounted on the roof Fourteen, ceiling hung, air vents

Electrical Plan Electrical Key Electrical outlet Recessed can light Fluorescent tube light Single switch

Finished Floor Plan

Current Bowling Facility Pictures

Area behind front desk Area behind pin-setters

New Bowling Facility Design

Cost/ Schedule Material and Labor estimate Cost analysis Project schedule

Turn-Key Estimate Sample Exterior walls 2X4X10 390 boards $6 a board $2,340.00 Treated Bottom Plate 45 boards $7 a board $315.00 2x4x12 Top Plate $270.00 2x4x16 Second Top Plate 35 boards $8 a board $280.00 7/16 OSB Sheets 200 $13 a sheet $2,600.00 Tyvek Wrap 4 $150 a roll $600.00 Vinyl Siding 520 squares $150 a square $78,000.00 Dry Wall 84 $40 a sheet $3,360.00 Roof Steel Joist 152 $300 per joist $45,600.00 Plywood Sheeting Roof 16800 sq./ft. $2 sq./ft. $33,600.00 Insulation Board/Membrane $6 sq./ft. $100,800.00

Overview of Estimate Total project cost $2,705,289.60 Lot/Site Work $750,000.00 Foundation $102,875.00 Exterior $133,365.00 Material/Labor Cost $2,080,992 Roof $134,400.00 Slippage 5% Interior $347,682.00 Overhead 15% Plumbing $8,575.00 Profit 10% HVAC $51,830.00 Total project cost $2,705,289.60 Electrical $58,800.00 Bowling Equipment $464,600.00 Other Equipment $28,865.00

Cost Analysis Expected annual income for new bowling facility = $157,800 It would take just over 17 years to cover the initial cost of the project.

Section of Project Schedule

Project Schedule: 296 working days May/1/2012 December/7/2012 June/18/202 Start Date Half Way Date End Date

Conclusion A new bowling facility would benefit the university, the bowling team and the city of Morehead The university Increased revenue greater appeal for potential students The bowling team Bigger, better facility More members can join Updated machines/equipment The city of Morehead Something new and exciting New place to take family

Questions ?