9/10/2018 News on operation Second commissioning phase from 30th of March to 9th of April 2009. Aline Curtoni, Claire Simon, Franck Peauger, Wilfrid Farabolini.

Slides:



Advertisements
Similar presentations
RF-Gun cavity for high charge electron generation Takuya Natsui.
Advertisements

C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop February 2007, Daresbury Laboratory.
Probe beam distortion in TBTS due to high gradient RF acceleration (first part: observations) CTF3/TBTS Logbook 17 May 2013 Wilfrid Farabolini – Alexej.
Cecile Limborg-Deprey Injector Commissioning September Injector Commissioning Plans C.Limborg-Deprey Gun exit measurements.
David H. Dowell RF Gun Commissioning LCLS FAC April 16, RF Gun Commissioning Experience David H. Dowell for the LCLS Injector.
Cecile Limborg-Deprey Injector October Injector Physics C.Limborg-Deprey Diagnostics and Commissioning GTL measurements.
David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Injector Physics / Diagnostics / Gun & L0 Linac.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
1HG may 2013 TriesteTesting with beam in CTF3 - W. Farabolini Testing with beams in CTF3: breakdown kick and advanced diagnostics.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
AWAKE electron source New Electron Source WP at CERN
FEL Beam Dynami cs FEL Beam Dynamics T. Limberg FEL driver linac operation with very short electron bunches.
CTF3 photo injector laser status CERN 17 July 2009 CLIC meeting.
Providing Beams for Power Production What has been done Problems and Boundary Conditions Future improvements and possibilities.
Low Emittance RF Gun Developments for PAL-XFEL
IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1.
Overview of ERL MEIC Cooler Design Studies S.V. Benson, Y. Derbenev, D.R. Douglas, F. Hannon, F. Marhauser, R. A Rimmer, C.D. Tennant, H. Zhang, H. Wang,
1 Plan and Opportunities for Migration and Integration of the Photoinjector into New Muon Lab Mike Church AAC Review - 12/5/06.
F Photoinjector for the ILC test facility at Fermilab Sergei Nagaitsev Fermilab May 24, 2007.
Advancement in photo-injector laser: Second Amplifier & Harmonic Generation M. Petrarca CERN M. Martyanov, G. Luchinin, V. Lozhkarev Institute of Applied.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
Beam Loading experiment at KEK ATF ( Multi-train acceleration at KEK-ATF Injector ) KEK Masafumi Fukuda and Junji Urakawa LCWS /10/052 train acceleration.
Simulations of ILC electron gun and bunching system Diagram of bunching system (from TESLA paper by Curtoni and Jablonka) -Electron gun generates electrons.
RF break-down studies in the CTF3 TBTS Accurate measurements on TBTS RF Break-Down Studies in the CTF3 TBTS 29 Jan Wilfrid Farabolini 1.
17th July 2008#4-CTF3 Committee1 CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM 0220 CA.DHG/DVG 0225CA.SNG.
FLS2010 Workshop, Stanford, March 1-5, 2010 Florian Loehl (Cornell University) Commissioning of the High Current ERL Injector at Cornell Florian Loehl.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
F. Peauger19th June #3-CTF3 Committee1 CALIFES STATUS CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM.
Construction, Commissioning, and Operation of Injector Test Facility (ITF) for the PAL-XFEL November 12, 2013 S. J. Park, J. H. Hong, C. K. Min, I. Y.
European Advanced Accelerator Concepts Workshop, Elba, September 14 th -18 th, 2015Steffen Döbert, BE-RF Electron accelerator for the AWAKE experiment.
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
SL_THOMSON C. Vaccarezza on behalf of the SL_Thomson team.
F. Peauger - CEA DSM IRFU SACM 18 May 2008 CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM 0220 CA.DHG/DVG.
V Review SPARC Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.
12 GHz PETS conditioning with recirculation First Analysis
11th February th CTF3 Committee - Wilfrid Farabolini1 Status and progress of the CTF3 probe beam 1.
CTF3 PROBE BEAM LINAC COMMISSIONG AND OPERATIONS
S.M. Polozov & Ko., NRNU MEPhI
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Linac beam dynamics Linac dynamics : C. Bruni, S. Chancé, L. Garolfi,
First Year of Operation at the Two-beam Test Stand
Status and progress of the CTF3 probe beam
PHIL: A TEST BEAMLINE AT LAL Specifications of PHIL
Feng Zhou LCLS-II AP meeting 02/23/2017
CLIC RF Structure Development Mtg, Alexey Dubrovskiy and CTF team
An X-band system for phase space linearisation on CLARA
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
Operation of the High-Charge PHIN RF Photoinjector with Cs3Sb Cathodes
Have a chance to operate your own beam at CERN
Thermal emittance measurement Gun Spectrometer
Few Slides from RF Deflector Developments and Applications at SLAC
Electric Field Amplitude (MV/m)
LINAC4 commissioning plans etc.
LCLS Gun Commissioning Status & Plans David H
Electron Source Configuration
Advanced Research Electron Accelerator Laboratory
Injector Topics for Discussion
Linac/BC1 Commissioning P
VELA TDC: Bunch Length and Longitudinal Phasespace Measurements Update
Modified Beam Parameter Range
CLIC Feasibility Demonstration at CTF3
COMB beam: TSTEP simulations up to THz station
LCLS Injector Commissioning P
小型X線源の性能確認実験計画 高輝度・RF電子銃研究会 広島大学 高エネルギー加速器研究機構 浦川順治
SuperKEKB required (e+ / e-)
Experience with photoinjector at ATF
Presentation transcript:

9/10/2018 News on operation Second commissioning phase from 30th of March to 9th of April 2009. Aline Curtoni, Claire Simon, Franck Peauger, Wilfrid Farabolini Tatiana Pieloni, Massimo Petrarca, Valentine Fedosseev, Eric Chevallay,… 16th April 2009 #10-CTF3 Committee – Wilfrid Farabolini

What’s new from the 1st commissioning ? 9/10/2018 A laser system in a nearly perfect reliable working state (no longer use of the dark current) The RF attenuator installed in the gun power distribution (much less dark current) Phase of sections 2 and 3 re-adjusted (by 10o) to be at 88o from section 1 Powers of the earth field correctors made independent for the 3 sections More stable RF power (modulator, LLRF) Diagnostics made more friendly to use But not yet the availability of the power phase shifter of the section 1 (its construction progresses carefully) 16th April 2009 #10-CTF3 Committee – Wilfrid Farabolini 2

The power phase-shifter construction Mode convertors successfully brazed at Bodycote Sliding circular waveguides successfully brazed at Cern Still one more brazing to perform (input and output waveguides), then welding of the bellows, assembling, LLRF test and installation Installation tools and procedure from CERN drawing office 16th April 2009 #10-CTF3 Committee – Wilfrid Farabolini 3

#10-CTF3 Committee – Wilfrid Farabolini 9/10/2018 RF Gun Measures of beam current, size, position, energy as function of phase, focusing coils field, laser spot position on photocathode… MTV coils BCM Corr. Beam size on MTV215 rather constant (s: 1.5 to 3 mm) vs. phase. Beam position shifts down for phase < 150o Energy evaluated with the DHG/DVG130 corrector to 5.7 MeV down to 3.5 MeV for phases < 145o (but this first computation doesn’t take into account the fringe field of the gun coils) Looks very similar to the PHIN Laser pulses 7 ns (10 bunches) QE = 0.5%, 0.2 nC/bunch UV Laser energy/bunch: 0.29 mJ (nominal 1.93) Beam position on MTV215 as function of DHG/DVG130 intensity (effect of solenoids fringe field) 16th April 2009 #10-CTF3 Committee – Wilfrid Farabolini

#10-CTF3 Committee – Wilfrid Farabolini 9/10/2018 Phase scan 270 deg ? Not fully understood Was clearer with the dark current ! 90o 180o 90 deg 16th April 2009 #10-CTF3 Committee – Wilfrid Farabolini 5

RF signals and timing problems 9/10/2018 Problem: Beam energy was stuck bellow 90 MeV and very instable. Solution: The laser pulse occurred too close to the end of the RF pulse, bunches entered the section when the electric field has started to decay. RF pulse after compression by the BOC Standing wave gun filling RF pulse transmitted through the structure 16th April 2009 #10-CTF3 Committee – Wilfrid Farabolini 6

Bunch to bunch energy spread 9/10/2018 3 ns train Bunch train max energy : 140 MeV (nominal 170) Already some ideas to make use of such a time-energy discrete structure in the TBTS DE/E = 1.45 % 170 keV < DE < 370 keV 12 ns train Bunches are energy resolved – 7 ns train 16th April 2009 #10-CTF3 Committee – Wilfrid Farabolini 7

First measure of Twiss parameters with Quad scan 9/10/2018 First measure of Twiss parameters with Quad scan Triplet MTV390 Emittance still larger than the specified one (< 20 mm.mrad) 16th April 2009 #10-CTF3 Committee – Wilfrid Farabolini 8

#10-CTF3 Committee – Wilfrid Farabolini Alignment problems 9/10/2018 Survey to be resumed especially in the vertical plane 16th April 2009 #10-CTF3 Committee – Wilfrid Farabolini 9

BPMs operational on OASIS 9/10/2018 16th April 2009 #10-CTF3 Committee – Wilfrid Farabolini 10

Control/Command still to be completed 9/10/2018 Control/Command still to be completed Not yet for us The middle-ware The actual front-end The gun phase-shifter actuator (after the jamming of the stepping motor) Where the C/C should be 16th April 2009 #10-CTF3 Committee – Wilfrid Farabolini

CALIFES beam reached for the first time the end of the TBTS line 9/10/2018 Et ce n’est pas un poisson d’Avril ! 16th April 2009 #10-CTF3 Committee – Wilfrid Farabolini 12

#10-CTF3 Committee – Wilfrid Farabolini 9/10/2018 Conclusion Works in progress. Thanks a lot to all the support teams for their prompt reactivity Ready and enthusiastic to resume on the 2nd of June 16th April 2009 #10-CTF3 Committee – Wilfrid Farabolini 13