2016.

Slides:



Advertisements
Similar presentations
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
CERN IT Department CH-1211 Genève 23 Switzerland t Mobile services: Sunrise SWAP Rodrigo Sierra IT/CS.
CERN Safety Alarm Monitoring (CSAM) CERN Safety Alarm System Supervisory Board 6st meeting Luigi Scibile & CSAM project team.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Everything you always wanted to know about… …CERN’s new mobile operator Peter JURCSO BE-CO-IN.
1 EL Consolidation IEFC Workshop F. Duval on behalf of EN/EL
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
André Augustinus 16 September 2002 Safety issues.
LHCb SLIMOS training Responsibilities of the SLIMOS Safety Systems Reaction to alarm and emergencies Contacts, useful phone numbers Hands on session SLIMOS.
Active Safety Systems + EHN1: Draft EN/EL proposal for replacement of Nano PLC 1.Current situation 2.Requirements definition 3.Current solutions (Atlas/CMS)
TS, Length of YETS EYETS LIU & CONS Project
RAMSES PROGRAMME F. SZONCSO CERN – DGS/DI 31 st March 2014 CERN – GREECE INDUSTRY day1.
André Augustinus 26 October 2004 ALICE Technical Board DCS for ‘services’ costs On behalf of Lennart Jirdén.
Status Report from LHC Safety System Task Force Emmanuel Tsesmelis / TS-LEA on behalf of the Task Force LEAF 11 May 2007.
Eric Thomas - Safety systems for LHC experiments 1 Safety Systems for LHC experiments Baseline specifications – Additional needs – Actions taken.
Safety systems (AL3) and systems relevant to Safety Steve Hutchins with thanks to: Karl Gunnar Lindell, Rui Nunes, Silvia Grau, Henrik Nissen, Patrice.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
15 January 2008 S.Infante TS-EL CONTROLS ACTIVITES.
 Overview of the run 2009 for CV  Major improvements in Water treatment - Demineralised water production - Cooling control  Major concerns for.
Review of Safety Systems for the LHC Experiments & Experimental Areas Emmanuel Tsesmelis / TS-LEA LEMIC 20 March 2007.
ATC/ABOC Days, 22 January 2007 The safety electrical networks at CERN Anne Funken, TS-EL.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
Safety of premises P. K. Frandsen SM 18 LHC Magnet test review 21 JUN 2005.
TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen1 TCR Remote Monitoring.
SMB SMB-SE group L. Scibile 1. SMB Mandate The SMB-SE Group is responsible to provide, to operate, maintain and to renovate the civil engineering infrastructures.
CHEP 2010 – TAIPEI Robert Gomez-Reino on behalf of CMS DAQ group.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
Remote Measurement and Alignment Applications for Survey and Alignment P. Bestmann for BE/ABP/SU
Fire and Oxygen Deficiency Detection Systems Risk Analysis S. Grau GS-ASE-Alarm Systems R2E Workshop, Tuesday Session 2: Equipment inventory,
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
The Next Generation of a Gamma Irradiation Facility GIF++
YETS & LS2 Works EN-EL / Power distribution
ALICE 5 o’clock meeting Wk 51.
MEDICIS Safety Alarms Systems
ABT-EC EYETS Activities 2nd reports
Safety Systems for ALICE
EYETS Works EN-EL [ FC excluded ]
TC activities.
Performance monitoring framework for the technical infrastructure
BE-ICS Activities during the LS2 Period (15 min)
Activités SPS pour BE/ICS Systèmes d’Alarmes YETS
Background B513 built in early 1970’s for mainframe era.
BE-ICS activities for LIU Project
# 56- FIRE PREVENTION (Decision Needed)
J. Uythoven for the MPE-MI & MS Teams
Accelerator and Experiment Interface Session: LS2, LS3
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
the CERN Electrical network protection system
M.Tavlet, H.Taureg - ALICE
HL Consolidation Day Analysis of needs from BE-ICS
YETS & LS2 Works EN-EL / Power distribution
Overview & baseline of LS2 and roadmap for CRG
GIS Portal Racks Project
Business opportunities related to CERN electrical network
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
Experimental Areas – LS2 planning
WP 2 Update Fire Detection and Extinguishing FCC Collaboration
North Area Safety Review 2019
North Area Safety Review 2019
Access Control for CERN Experimental Areas
ILO Industrial Opportunities Days, 6-7 June 2019
ODH Monitoring System Yong Kian Sin Personnel Safety System
Presentation transcript:

2016

Fire Detection & Evac Continuous maintenance & operation Including evacuation drills Replacement of LHC Experiment’s smoke detectors for rack protection ~885 det. Installation of ~1500 new detectors and ~80 new sirens Continuous renewal of existing installations Completed - Meyrin: Z19, Z31 (B513) Started - Meyrin Z29 (PS), Z30 (AD, Isolde, Booster), Z22, Z26 Laser detectors replacement: SDX1, SX1, 513, SX5 Linear detectors replacement: 355, 358, 112 Projects SM18 Cluster D MEDICIS – Ongoing – several phases GIF ++ AWAKE EAR 1 modification RWTC – Ongoing – several phases SPS Fire Safety Project started Numerous “small” projects (~80 projects/year, 1.5 MCHF) 653, 54, 169, 4

Gas/ODH Detection & SNIFFER Continuous maintenance & operation Replacement of LHC central’s chargers Completed – Refurbishing of SD18-SM18 central Continuous renewal of existing installations Started – EHN1 Infr. (JURA side) – new SYNTEL technology Started – Meyrin: Z22 (Chaufferie) – new SYNTEL technology Started – BB5 - ODLHAM Projects - Ongoing EHN1 Extension – new SYNTEL technology GIF ++ – new SYNTEL technology Project - Under definition Crab cavities Building 107 - new SYNTEL technology Meyrin zone 26 External Review for ESS – ODH systems

Alarm transmission Continuous maintenance & operation Weekly updates Follow-up of the FB interventions Monthly meeting with FB Continuous renewal of existing infrastructure Completed - Replacement of CSAM Text Display to Magelis Completed - Replacement of CSAM Servers Completed - RoMMD project (301 terminal blocks SIEMENS installed) Completed - OPC Kepware for gas centrals Completed - Upgrade of CSAM Long Term History Projects - Ongoing Improvements of CSAM Configuration Manager Migration of Orgabat software Migration of CSAM PLC to UNITY Projects - Under preparation Working Group for the review of CSAM Requirements to define the direction for CSAM2 implementation Management of CCC Alarm Display by CSAM PLC Concentrator for reliability improvement CSAM= CERN Safety Alarm Monitoring System

SPS - Upgraded automatic fire detection & protections systems – WP2 SPS Fire Safety SPS - Fire Sprinkler Protection Systems – WP4 Launched MS for Feasibility study and a technical proposal of water based Automatic Fire Extinguishing system Feasibility study performed SPS - Upgraded automatic fire detection & protections systems – WP2 2 posts opened Project leader & technical responsible named Project launched MS under preparation Fonction X … moving towards: Voice Alarm Safety Systems

Global Infor EAM PPE Working Groups Completed - Classes & Categories (EDMS 1706394) Improved - Material obsolescence management Improved - Park reports Testing – Checklist PPE Reevaluation of PPE after Infor update Working Groups GIS Protal information for FB BE-AMF Forum

Global Trainings IPAC 2016 HL-LHC Automatic Fire Protection systems Automatic Fire Sprinklers systems ATEX - Electrical installations Batteries IPAC 2016 Concept of Fire & Gas safety system for Accelerators HL-LHC Cost estimates prepared Preliminary design

Technical student(s) for red phones maintenance (~ 10 days, end of december to end of January) EDMS 1350892