DCH Electronics Upgrade: Overview and Status

Slides:



Advertisements
Similar presentations
Future Dataflow Bottlenecks Christopher O’Grady with A. Perazzo and M. Weaver Babar Dataflow Group.
Advertisements

Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Some notes on ezTree and EMC data in MuDst Marco van Leeuwen, LBNL.
ATLAS SCT/Pixel TIM FDR/PRR 28 July 2004 Firmware - Matt Warren1 Physics & Astronomy HEP Electronics Matthew Warren John Lane, Martin Postranecky TIM Firmware.
U N C L A S S I F I E D FVTX Detector Readout Concept S. Butsyk For LANL P-25 group.
PicoTDC Features of the picoTDC (operating at 1280 MHz with 64 delay cells) Focus of the unit on very small time bins, 12ps basic, 3ps interpolation Interpolation.
1 Programming of FPGA in LiCAS ADC for Continuous Data Readout Week 3 Report Jack Hickish.
The BaBar Event Building and Level-3 Trigger Farm Upgrade S.Luitz, R. Bartoldus, S. Dasu, G. Dubois-Felsmann, B. Franek, J. Hamilton, R. Jacobsen, D. Kotturi,
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
NA62 straw tracker readout status Georgios Konstantinou
STaRBoard Jamal Rorie 5/09/06 Physics 476. Why do we need ToF info? Used to determine species of particle –Central Drift Chamber records path –ToF records.
Upgrade Radiation Issues Christopher O’Grady For the DCH Electronics Upgrade Group Based on work by Jerry Va’vra.
SCT Readiness for Heavy Ion Collisions Dave Robinson on behalf of SCT 15/9/101Dave Robinson Heavy Ion Review.
LHCb VELO Upgrade Strip Chip Option: Data Processing Algorithms Giulio Forcolin, Abdul Afandi, Chris Parkes, Tomasz Szumlak* * AGH-Krakow Part I: LCMS.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
1 Programming of FPGA in LiCAS ADC for Continuous Data Readout Week 7 Report Friday 15 th August 2008 Jack Hickish.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
B-KLM DAQ 2011/01/25 Trigger/DAQ workshop K. Sumisawa (KEK) Introduction Summary +7 pages.
SuperB-DCH LNF SuperB Workshop – Dec 09 S ervizio E lettronico L aboratori F rascati G. Felici DCH Readout and Control System A (very) preliminary study.
Off-Detector Processing for Phase II Track Trigger Ulrich Heintz (Brown University) for U.H., M. Narain (Brown U) M. Johnson, R. Lipton (Fermilab) E. Hazen,
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
SuperB-DCH S ervizio E lettronico L aboratori F rascati 1LNF-SuperB Workshop – September 2010G. Felici DCH FEE STATUS Some ideas for Level 1 Triggered.
Gianluca Lamanna TDAQ WG meeting. CHOD crossing point two slabs The CHOD offline time resolution can be obtained online exploiting hit position.
E. Hazen1 New DCC Status and Plans Jim Rohlf, Eric Hazen, Arno Heister, Phil Lawson, Jason St John, Shouxiang Wu Boston University.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
Straw readout status Run 2016 Cover FW SRB FW.
DAQ (i.e electronics) R&D status in Canada
ATLAS Pre-Production ROD Status SCT Version
DCH FEE STATUS Level 1 Triggered Data Flow FEE Implementation &
ETD meeting Architecture and costing On behalf of PID group
CLAS12 DAQ & Trigger Status
ETD meeting First estimation of the number of links
ETD summary D. Breton, S.Luitz, U.Marconi
Trigger, DAQ and Online Closeout
AFE II Status First board under test!!.
DCH FEE 28 chs DCH prototype FEE &
Electronics, Trigger and DAQ for SuperB
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
TDCB status Jacopo Pinzino, Stefano Venditti
Trigger, DAQ, & Online: Perspectives on Electronics
Status of Full Simulation for Muon Trigger at SLHC
Hall A Compton Electron detector overview
Run experience Cover FW SRB FW DAQ and monitoring
Special edition: Farewell for Valerie Halyo
Dominique Breton, Jihane Maalmi
Example of DAQ Trigger issues for the SoLID experiment
Special edition: Farewell for Stephen Bailey
University of California Los Angeles
CLAS12 Timing Calibration
BESIII EMC electronics
Special edition: Farewell for Eunil Won
Tracker Software Status
Trickle Background Investigation
Commissioning of the ALICE-PHOS trigger
DIRC Background Status
The CMS Tracking Readout and Front End Driver Testing
PID meeting Mechanical implementation Electronics architecture
August 19th 2013 Alexandre Camsonne
ETD parallel session March 18th 2010
TOF read-out for high resolution timing
SVT detector electronics
The LHCb Front-end Electronics System Status and Future Development
Links and more … D. Breton
XFT2B: Plans and Tasks XFT Workshop FNAL 19 December 2003; p.1.
Presentation transcript:

DCH Electronics Upgrade: Overview and Status Christopher O’Grady For the DCH Electronics Upgrade Group

The DCH Deadtime Problem DAQ system behaves like a set of parallel assembly lines; runs as fast as the slowest “worker”. Worker speed depends (to first order) only on event size. Trigger rate sets speed requirement. Using VMON software from Perazzo and Swain projected event sizes: in 2001 predicted a future DCH readout bottleneck. Bottleneck observed in 2003/2004.

Projected Readout Times Latest round done by Matt. NOW 2004 2005 Luminosity Component 2006 2007 Noise Component 140us LER Component HER Component Svt Ifr Trg Drc Dch Emc

Upgrade DCH Readout? Trigger requires 7kHz (x2 background) in 2007: 140us. Historically, some projections have been pessimistic, some optimistic, but not wildly off. If we don’t improve DCH bottleneck, no point in doing any other DAQ upgrades. Significant improvement possible (thanks to original system designers). Pressure to compete with KEK. Experience: Dataflow has track record of successfully modifying firmware and understanding/fixing subtle electronics problems (SVT,DCH,EMC,EMT,FCTS). Matt also designed/built his own board (FCGG) from scratch. Significant experience added with Herbst. Babar management made decision to attack the problem on many fronts (e.g. backgrounds, DAQ deadtime, trigger rates). But this is the most “serious” work so far: deep inside detector. Must work perfectly. Forever. I think we can do it.

Existing Readout System

Data Transfer Rates

Improving Throughput Two options to improve readout speed: Scale existing system to increase data transfer rates, and/or Reduce size of data (1) was original idea, but successfully argued against by Nelson/Haller Two ideas for (2) were conceived in Jan. 2004. Both are being implemented.

Phase I Change ROIB “slave” readout firmware to send up half the DCH waveform: for a pair keep TDC hit (if present) or second half of pair of ADCs. Factor of 2 improvement.

Phase I (part b) To first order, affects only dE/dx, not tracking. Re-ran physics analysis with/without this: no significant degradation observed. Needed to increase elefant readout rate to 15MHz from 7.5MHz to avoid FIFO underrun. Many subtle issues. Necessary for Phase II. Installed in August, tested with hundreds of millions of bit-pattern events (and many other tests) “Serious tracking” a couple of days from now

Phase II Move Feature Extraction algorithm (FEX) from ROM to larger FPGA at front-end Keep all I/Os the same. Need new ROIB and ROM software. All firmware the same except FEX firmware Much easier because of elegant FEX algorithm from J.J. Russell.

Requirements/Deliverables I New ROIBs: FEA1, FEA2, FEA3, 16 each, + 20% spares. (Ryan’s talk) FEX Firmware, able to transfer data to ROM in <140us, on average, in 2007. (Matt’s talk) Master/Slave/Trigger Xilinx firmware rewritten in VHDL (currently “structurally”). (Matt’s talk, work from Jinlong, Pradeep and Chris) Validation for all firmware (Matt’s talk) Good VHDL support for mixing/matching 2 compatibility modes, FEA1-3, FEX (Matt’s talk) New ROM Software (Matt’s talk)

Requirements/Deliverables II Two software and jumper selectable PROMs on front-end. One “fixed”, the other supports new “FEX” firmware download from ROM (Ryan’s talk, Pradeep’s work). Fixed PROM to contain “compatibility” mode firmware (32 byte samples). Allows board to look like old ROIBs for old teststands and for calibrations. (Ryan’s talk) No significant noise degradation (Ryan’s talk) T0 value same as old board to <2ns. No change in power/cooling loads (Ryan’s talk).

Requirements/Deliverables III Testing procedure to validate new production (Chris’ talk) Data quality not compromised by radiation (Chris’ talk) Documentation and archive Firmware maintainable over the years (difficult)

Status First FEA2 was received in first week of Nov. Two weeks after receiving it we were able to run hundreds of millions of bit pattern events and DCH calibrations (compatibility mode) both on the teststand and on the detector!!! This is impressive, in my biased opinion. Major missing piece is firmware download support: in simulation, highest priority after review.

Plan Over next week or so, hopefully get download to work. Pack I/O flops into IOBs. Test, measure, get more “faith” in the board. Wanted to install board in compatibility mode at “Christmas”, but have to wait because of safety issues. Be opportunistic. Work on ROM software, and FEX support (new opcodes: constants download, firmware download) Full installation in summer 2005. Neutron radiation is significant concern. We can’t mess this up. Healthy paranoia required.