Steering Meeting of EuCARD

Slides:



Advertisements
Similar presentations
SINBAD Ralph W. Aßmann Leading Scientist, DESY LAOLA Collaboration Meeting, Wismar
Advertisements

D.S. proposal 18/12/2003 R. Garoby 1 PROTON DRIVER ACTIVITY Present work program: IPHI-SPL collaboration HIPPI Joint Research Activity [CARE] Proton driver.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
Role of Management and Technical Coordination
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD 2 ColMat-HDED.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Eucard Annual Meeting, April 2010 Jens Stadlmann / Synchrotron EuCard WP 8; ColMat Collimators and Materials.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
PHIN JRA Status PHIN collaboration CARE SC meetingParis February 2004.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
WP: Parameters and design. Plans from IFIC, Valencia Javier Resta López on behalf of the IFIC accelerator group ( IFIC (CSIC-UV),
Ralph Assmann What Do We Want To Measure (in 2009) R. Assmann S. Redaelli, V. Previtali CERN/BE discussed with W. Scandale CERN/EN26/3/2009CC09  See also.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Recommendations on the scientific programme The PAC endorsed the main lines of the proposed long-term programme. The draft document is expected.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
ESGARD – OMIA 10 & 11/09/2007 JRA on Collimators and Materials for High Power Accelerators Motivation Work Packages Partners & resources R. Assmann.
Experimental and Theoretical Study of Energy Deposition and Residual Activation Induced by Uranium Ions to Model the Beam Loss Hazards in the GSI Future.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
GSI -Introduction Overview of WP8 work Planned contributions to WP11
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Collimator revue A. Bertarelli - S. Calatroni - M. Mayer - R. Perret TS/MME 1 OUTLINE of the presentation Technical Support Department Collimator.
General Information New members in ABP (RTL): –M. Samson Restructuring should be finalized by the end of the year to be effective for beginning of the.
A. Bertarelli, A. DallocchioEuCARD/ColMat Kick-off Meeting 17/06/2009 EuCARD/ColMat Kick-off Meeting EuCARD/ColMat Kick-off Meeting 17 th June, 2009 A.Bertarelli,
Education Thesis: Layout and design of a high accuracy magnetic field measurement system for superconducting undulators. Thesis: Phase error reduction.
HIGHLIGHTS OF LAST MONTHS OF HSS ACTIVITIES AN EXCITING AND HECTIC PERIOD WITH THE LHC BACK IN OPERATION… ABP General Group meeting - HSS1.
R. Assmann, June 2009 Operational Experience with the LHC Collimation System R. Assmann, CERN 8/6/2009 for the Collimation Project Team Visit TU Munich.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
FP7: EuCARD after a year of preparation… A.Jeremie.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) May 16, 2011.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Aim and goals Mini Workshop of Accelerators Radiation Mini Workshop of Accelerators Radiation.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
Engineering Department ENEN Introduction to EuCARD2 WP 11: Collimator Materials for fast High Density Energy Density Deposition (ColMat-HDED) Alessandro.
11/19/ Third Meeting of the EuCARD Steering Committee 1 EuCARD Management Report J.P. Koutchouk, S. Stavrev for the Coordination Office.
ColMat Welcome and Task 1 Ralph W. Aβmann Kick off Meeting of EuCARD/ColMat CERN – June 17 th, Jun 09 1R. Assmann.
WP9: Dissemination and Exploitation
on behalf of the Phase II Collimation Design team
Materials for extreme thermal management (PowerMat)
News and Introduction from CERN June 15th, 2005
New Materials for Extreme Thermal Management – PowerMat: Task 17.2
Scientific investigations performed at RRC KI for
National Research Center” Kurchatov Institute”
From EuCARD-2 to ARIES TIARA Meeting, Warsaw, 19 June 2017
Installation of an Instrument on a CERN machine
“hot spots” SIS100 internal beam dump Super-FRS production target
Report on Transnational Access in AIDA2020 WP 10, 11, 12
Complementary ISTC Projects #3888, 3889p
LARP Phase II Secondary Collimator RC1
WP 17 Materials for Extreme Thermal Management (PowerMat)
Materials for extreme thermal management (PowerMat)
PROPOSALS FOR HIGH INTENSITY – HIGH ENERGY PROTON BEAMS
M.Jonker CTC MPO-WG status
Joint Meeting SPS Upgrade Study Group and SPS Task Force
Ralph Aßmann (DESY) 2nd collaboration week November 24th, 2017, Lisbon
Steering Meeting of EuCARD
CLIC-ILC BDS & MDI work.
Report on EUCARD WP6: MICE Transnational Access (TA)
EuCARD 1st Annual Meeting
2th EuCard Col/Mat WP Meeting
2nd EuCARD2 ColMat HDED annual meeting wrap-up
HiRadMat Test Facility
Draft of Conceptual Phase 2 Collimation System Design
LHC External Collimation Review
Ch. Boccard, M. Krupa, G. Schneider, R. Veness, M. Wendt
A. Fabich EuCARD-2 annual meeting 2017, Glasgow
Presentation transcript:

Steering Meeting of EuCARD WP8: ColMat Ralph W. Aβmann Steering Meeting of EuCARD Frascati – November 4-5, 2009 05 Nov 09 R. Assmann

ColMat Participants (EuCARD WP8 – Joint Research Activity) 05 Nov 09 R. Assmann

ColMat Collaborators LHC Accelerator Research Program (US government funding): To be approved (German government funding, BMBF): 05 Nov 09 R. Assmann

Reminder ColMat Objectives Part I Coordination and scheduling of the WP tasks. Monitoring the work, informing the project management and participants within the JRA. WP budget follow-up. Design collimation systems for high-intensity proton and ion beams, adequate for achieving the performance goals of LHC and FAIR. Predict energy deposition from different sources for LHC and FAIR. 05 Nov 09 R. Assmann

Reminder ColMat Objectives Part II Identify and fully characterize in experiment and simulation materials that are adequate for usage in high power accelerators. Predict residual dose rates for irradiated materials and their life expectancy due to accumulated radiation damage. Design, construct and test a collimator prototype for upgraded LHC performance. Design, construct and test one cryogenic collimator prototype for use in FAIR and possibly LHC. Develop crystal engineering solutions for collimation. 05 Nov 09 R. Assmann

Kick-Off Meeting June 09 05 Nov 09 R. Assmann

Kick-Off Meeting June 09 05 Nov 09 R. Assmann

Kick-Off Meeting June 09 05 Nov 09 R. Assmann

Progress Summary (GSI see Jens Stadlmann) JAI: BDSIM for LHC energy deposition. UL/UM: Merlin to study wakefields, different materials and positions. First paper published at PAC09: http://epubs.cclrc.ac.uk/bitstream/3502/WE6RFP012.pdf IFIC Valencia: Work defined and post opened. Kurchatov: Measurement program for new collimator materials. Materials to be sent. Simulation program. EPFL: See slide on Al/C. ARC: See slide on machining. Malta: Work defined and post to be opened. CERN to GSI: Materials sent for beam testing. 05 Nov 09 R. Assmann

Interface study of Al-Diamond composites Comparison of GPI and Squeeze Casting EPFL

Task V: Shaping/Surface Finishing ARC Task V: Shaping/Surface Finishing Good surface quality can be realised by: preparation of sandwich structures or bi-layer structures “Machining/Cutting” of composites is possible by: Water Jet Cutting Laser Cutting Electro Discharge Machining 11

Jobs University of Malta (PhD): 05 Nov 09 R. Assmann

CERN Highlights Note: EuCARD complements the CERN effort. EuCARD results from partners channel directly into this prototyping work. Expect 2-3 iterations. 05 Nov 09 R. Assmann

Deliverable Phase II LHC Collimator Prototype Phase II collimator being finalized for installation into the SPS end of January 2010. Material: CFC Phase II: BPM buttons in jaw. Lab tests completed very satisfactory. 05 Nov 09 R. Assmann

Lab Measurements (beam represented by stretched wire) C. Boccard M. Gasior 05 Nov 09 R. Assmann

Lab Measurements (beam represented by stretched wire) C. Boccard M. Gasior 05 Nov 09 R. Assmann

Conclusion Apologize to all ColMat partners if I did not mention their activity in more detail. All work is very important for the overall success. Results are coming together very nicely. First “EuCARD/ColMat hardware” to be installed for beam tests end of January 2010. Additional important work is done by collaborators in the US. GSI related work to be reported on by Jens. 05 Nov 09 R. Assmann