The second River Basin Management Plans and implementation of fish barriers measures Jenny Davies RBMP coordinator November 2017.

Slides:



Advertisements
Similar presentations
Colville Confederated Tribes and the Okanagan Nation Fisheries Commission.
Advertisements

Out Year Operations and Maintenance Costs Required to Implement/Carry out MVID Rehabilitation Project.
Development of restoration policy framework Joyce Carr Scottish Government.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
This is the Yorkshire Derwent Every catchment has a story...
Mordecai Lincoln Dam & Hunters Pond, Scituate, MA
Community Planning in Scotland BACKGROUND  Around since c.1998  Statutory backing since 2003  Duty on certain public bodies to participate  No single.
Feedback from engagement and consultation for physical condition River Basin Management Planning Unit.
River Basin Management Plans & Strategic Environmental Assessment & Appropriate Assessment Ray Spain Local Authorities Workshop, 3 rd December 2008.
Update on the implementation of the first plans Pilot catchments & the restoration plan Priority catchments WEF Local measures River basin districtPercentage.
Advisory group update – September 2013 Development of the second river basin management plans Sustainable water management for the benefit of Scotland’s.
Current condition and Challenges for the Future Report s (Scotland and Solway Tweed)
IMPROVING FISH PASSAGE ON THE RIVER ALMOND WELCOME.
Hydropower and the Water Environment Peter Gammeltoft European Commission DG Environment, D.1 Water 2nd Workshop on Water Management, WFD & Hydropower.
The Irwell Pilot an integrated approach to delivering sustainable water management and additional benefits Katherine Causer National Pilot Steering Group.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
Irwell Catchment Pilot Katherine Causer January 2012.
IMPROVING FISH PASSAGE ON THE RIVER ALMOND WELCOME.
Current condition and Challenges for the Future Report s (Scotland and Solway Tweed)
Subtopic Theme 5 : Water Resources Management and Benefit Sharing Water Resources Management and Benefit Sharing Water Resources Department,MLIT.
THE MANAGEMENT PLAN IN PRACTICE Case study. RBMP Detailed publication process in the directive...  art. 13: general rules  annex VII: detailed contents.
River Basin Management Planning Cath Preston Senior Planning Officer (River Basin Planning) 2 nd March 2006.
Flood and Water Management In Scotland Dr Rebecca Wade, UWTC, University of Abertay
Flood Risk Assessment Group Stage 2 amendments. Mapping watercourses- new duty on LA’s Map features contributing to managing flood risk- New duty SEPA.
WFD Schemas Article 3 – RBDs and Competent Authorities Article 5 – Water Bodies, Protected Areas and Summary RBD information Article 8 – Monitoring Programmes.
Sub-basin Management Plans for the Freshwater Pearl Mussel Dr E. Sides, J Ryan, Dr A O’Connor, Dr Colin Byrne Department of Environment, Heritage and Local.
Defining Good Ecological Potential : Method used in the UK Niall Jones Hydro-morphology senior advisor Environment Agency.
TRAP 5 th interregional meeting & Site Visits Limerick & Lough Derg, Ireland 9 th October 2013 CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional.
WHY IS INTEGRATED RIVER BASIN PLANNING IMPORTANT? Module 1 pp 1.1.
Update on the implementation of the first plans Pilot catchments & the restoration plan Priority catchments WEF Local measures River basin districtPercentage.
Environmental watering – How is it the same or different from floods? Denis Flett Chairperson, Victorian Environmental Water Holder Friday 14 November.
Regional Conservation Partnership Program Partnership Information Sherre Copeland, Partnership Liaison.
The second River Basin Management Plans and implementation of fish barriers measures Jenny Davies RBMP coordinator June 2017.
Environmental Services Training Group
COBIT 5 Executive Summary
Options to address fish barriers
STATUS OF LAKE VICTORIA ENVIRONMENTAL MANAGEMENT PROJECT II
The second River Basin Management Plans delivery update - Highland
Freshwater fish Classification Tools
The second River Basin Management Plans delivery update - Argyll
Role of Fisheries Trusts/ Boards in River Basin Management Planning
River Basin Management Planning
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
Proposal for reporting on Programmes of Measures in 2016
FORESTRY AND DIFFUSE POLLUTION
Mary Andrews NOAA Restoration Center
RBMP Delivery Update Outer Hebrides 2017
Restoring Scottish Rivers – workshop 2
River Basin Management Plans delivery update – North East May 2018
Addressing fish barriers
WFD and Hydromorphology - 4/5 June 2007, Berlin, Germany -
CIS-Workshop on River Basin Management Plans
1. Implementation of the Water Framework Directive: notifications & infringements, RBMP assessments for the agricultural sector Expert Group on WFD & agriculture.
A pilot appraisal at catchment level for the second RBMP cycle: Experience from the UK Presented by: Simon Scanlan (Defra) Kathrynne Moore (Environment.
River Basin Planning & Flood Risk Management in Scotland
Developing the second plans
MODALITY OF COOPERATION
River Basin Management Plans
Preparing a River Basin Management Plan WFD Characterisation Manager
The Gippsland Lakes Program :
FRM directive – legislative initiatives in Flanders
Implementation EU White Paper Climate Change Adaptation Specific actions DG Environment Feedback from Expert Group Climate change and water Jacques Delsalle.
Scottish Government Responsible for environment & flooding issues
EP Pilot project Comparative study of pressures and measures
Lessons learned from WFD reporting and follow-up
E-flow guidance and groundwater
Potential Process and Decisions for Conn. River Watershed Pilot
NGOs expectations for next WFD cycle
Item 7. Paving the way for WFD in Cross Compliance
Tucannon River Programmatic Habitat Program (a 30 mile long project)
Presentation transcript:

The second River Basin Management Plans and implementation of fish barriers measures Jenny Davies RBMP coordinator November 2017

Key Pressures on the Water Environment (Scotland RBD) 4000km of river habitat inaccessible to fish and eels. No. of water bodies

Categories of Fish Barriers Active barrier Active Barrier – an impoundment, weir or dam that is a barrier to fish movement and is being operated or maintained (or is planned to be operated or maintained); or, it is a mothballed weir, impoundment or dam (i.e. it is not currently operated or maintained but the owners operate/maintain similar structures for the purposes of their business). Regulatory approach by sector – Hydropower is the priority for this cycle.   Historic Barrier  - an impoundment, weir or dam constructed prior to 1 April 2006 that is a barrier to fish movement and is not operated or maintained. Nor is it owned by a business who operates or maintains similar structures for the purposes of their business. Funded by Scottish Government via the Water Environment Fund, WEF.  Asset Barrier – a culvert or bridge apron built prior to 1 April 2006 that is a barrier to fish movement. Working with Responsible Authorities. Historic Barrier Asset Barrier

Action on fish migration Scope all barriers by 2021 – currently underway Remove/ ease 184 barriers by 2021 and a further 189 by 2027 Prioritised based on quantity of habitat and catchments Significant benefits to fish populations, opening up large amounts of new habitat

Scoping a barrier

Other assessment Other assessment Flooding Conservation area Ownership Costs & benefits External engagement Access Services

Following scoping Agree if impassable, feasible and proportionate Design and build Monitor and reclassify

Summary Fish barrier is the major pressure on the water environment Easement and removal of fish barriers is a priority for Scotland Partnership is key to achieve these objectives