NYU Cogeneration and Microgrid John Bradley ITP Spring2016

Slides:



Advertisements
Similar presentations
U.S. Russia Energy Efficiency Workshop November 17, 2010 Public Sector Energy Efficiency Financing Presenter – Amy Chiang, VP Global Energy Government.
Advertisements

Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
California Energy Commission 1 Energy Workshops for W&WW Agencies UTILITY STRATEGIES FOR SHIFTING PEAK DEMAND PERIOD WATER & ENERGY USE REGIONAL STRATEGIES:
Sustainability Advocates Program New Advocates Training April 7, 2009 ENERGY AT NYU.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
Branford Board of Education Conservation Report Efforts and Results 2001-Present Mark Deming Facilities Director Branford Board of Education November 19,
Santa Rita Jail Going off the Grid Alameda County/RESCO CCAEA Meeting February 5, 2010.
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Bruce Hedman, Institute for Industrial Productivity September 16, 2014.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
Campus da FEUP Rua Dr. Roberto Frias, Porto Portugal T F © 2009 Decentralised Energy Systems.
© ABB SG_Presentation_rev9b.ppt | 1 © ABB SG_Presentation_rev9b.ppt | 1 Smart Grid – The evolution of the future grid Karl Elfstadius,
Practical Ways For Towns to Save Money With Clean Energy Projects Paul Michaud Murtha Cullina LLP April 30, 2014.
NJ Clean Energy Program Noveda Technologies Liberty Science Center By: Joe Fiorella Information from the:
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Cogeneration at UC July 18, Welcome 3 Transformation of the Power Plant POWER PLANT CENTER OF CAMPUS CENTRAL UTILITY PLANT 2007.
Battling Load Growth in NYC Chris Smith NYSERDA NARUC 2007 Summer Meeting.
Enable Energy Efficiency Green I.T.: Reduce energy use of I.T. “IT for Green”: Use IT to improve energy use in buildings, transportation, grids, industry.
Developing and Integrated Energy Conservation and Renewable Strategy Renewable Energy Leadership Summit June 7, 2005 Lenox, MA.
Phoenix Convention Center Phoenix, Arizona Evolution of Energy Services Integrated Energy TrackIntegration of the Energy Industry Nicole Bulgarino Ameresco.
Jobs in a Green Economy Rebuilding for a Low Carbon Future Bracken Hendricks, Senior Fellow Baltimore MD (07/21/09) Governor’s Workforce Investment Board.
Community Resource Committee Report to City Council January 15, 2015.
Department of Public Works Public Buildings Division Joey Duncan, P.E., Director.
Net-Zero Rubenstein 5% Energy Reduction Goal Main campus electricity is supplied by the Burlington Electric Department (BED). Nuclear energy, which comprised.
Creating A Cleaner Energy Future For the Commonwealth Massachusetts Clean Energy Programs, Polices and Goals Meg Lusardi, Director Green Communities Division.
New York State System Benefits Charge (SBC) – NGA Center for Best Practices April 29, 2004 Bob Callender Vice President for Programs NYSERDA.
Utah State University Logan Utah. Founded 1888 as a Land Grant Institution Host City – Logan, Utah (48,ooo+ population) ~ 15,000 Students (~ 28,700 students.
How IT Transition can feed green growth and energy transition through innovation 25th MAY, 2016 Masaaki Yamamoto New Energy and Industrial Technology Development.
Cogeneration at UC March 09, Welcome Central Utility Plant.
Creating A Greener Energy Future For the Commonwealth Clean Heat & Power in Massachusetts John Ballam, P.E. Manager of Engineering & the CHP Program MA.
DRAFT Status Report: Five-Year Energy Plan Town of Athol January 2013.
Back to the Basics: Climate and Energy Workshop Energy Efficiency Best Practices Karalee Browne.
Harness the Power of your Operating Budget to Enhance your Learning Environment MASBO Winer Conference – Jackson, MS.
New Jersey Energy Efficiency, Generation & Resilience Funding Update
Integration.
Energy and Sustainability Update
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
Luthin Associates Overview
Session: Enabling Technologies for Energy Resiliency
APTA Sustainability Workshop 2016
Self-Generation Incentive Program (SGIP)
Wind Energy in Iowa Lori McDaniel
Guaranteed Energy Savings Performance Contracting
Sustainability at The University of Montana
Distributed Generation
UMCP Learning Objectives
Saving Money and The Environment
Building Climate Action Plans from Existing Plans, Targets and Laws
Bob McGreevy, PE CEM President EES
The University of Montana Climate Action Plan
Microgrids and Energy Storage for Smart City Planning
Arun Vedhathiri, Director, Project Delivery, National Grid
APTA Sustainability Workshop 2016
Energy Leadership at the Local Level
BACKGROUND Green Building Act Energy Benchmarking and DC SEU Energy Efficiency Financing Act Distributed Generation Amendment Act Community Renewables.
Reforming the Energy Vision in New York State
Current Campus Emissions Reduction Targets
EVP, Chief Administrative Officer
City Council April 30, 2018 Item 13
September 2017 Christine Risch
Metropolitan Mayors Caucus Illinois Energy Bills
Solar Microgrids for Local Resilience
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
YMCA Sustainability Council
What it means to be green…
NYS Department of Public Service
Anna Garcia Air Innovations Conference August 2004
Meeting the challenge: Electrification and Climate Change
State of Vermont Energy Stimulus Plan
How to tackle air pollution
TCU and the Presidents Climate Commitment:
Presentation transcript:

NYU Cogeneration and Microgrid John Bradley ITP Spring2016

Superstorm Sandy – A Picture is worth $125 Million

BACKGROUND COMMUNITY SPACE Clock started in 2006 Green Grants 53,000 students 16,000 faculty and staff SPACE 14 million square feet in over 135 buildings Clock started in 2006 Decision to replace Co-generation Plant Purchase of Renewable Energy Credits (wind power) Environmental Studies Major launched Sustainability Task Force created Green Grants $275,000 distributed over the first two years to 39 projects Noteworthy projects: bike salvage; bike share; green roof safety study Wide Range of Programs and Events Sustainability Advocates Residence Hall Competitions and Donation Drives Food/Dining Hall Changes

Strategy To Reach 50% by 2017 BUILDING BASED CAMPUS WIDE Reduce Demand Reduce consumption Increase Efficiency Behavior Change Solar PV Installation LL 87 Audits & Retrofits CAMPUS WIDE Improved Lighting & BMS Strategies Update NYU Design Guidelines Data Center Efficiency Laboratory Best Practices 2MW Solar Power Purchase Agreement ENERGY FUND REVENUE SOURCES GRT Refunds Demand Response Funds NYSERDA Incentive Funds Cogen Electric Export Recharge New York (NYPA) Reinvestment of Energy Savings

Participation in the NYISO Capacity Market

Energy Compared to NYC Peers

Managing Greenhouse Gas Emissions Budget number reflects both FCM Managed and FCM Involved budgets ($49.2 FCM, $3.7 FCM Involved); MTCe = Metric Tons of Carbon Equivalent

Fixed price energy contracts shield NYU from market volatility

Benefits of New CoGeneration Plant Budget number reflects both FCM Managed and FCM Involved budgets ($49.2 FCM, $3.7 FCM Involved); MTCe = Metric Tons of Carbon Equivalent

CoGen Operations: State of the Art Technology Budget number reflects both FCM Managed and FCM Involved budgets ($49.2 FCM, $3.7 FCM Involved);

Cogen Plant Vault Under Construction

Gas Turbine Being Lifted into Place

Microgrid Benefits Community was given access to daily shelter, use of restrooms and heated spaces in Bobst Library Community was given access to charging stations daily Students and Faculty in NYU housing were fed at two dining facilities keep open during the entire week long crisis Cogen power was extended to temporary shower facilities in the Coles Gym building for use by faculty and students NYU Crisis Command Center in Cogen - Powered Building maintained communication with police, fire and OEM agencies as well as students and parents City Agencies utilized Cogen – Powered building as Command Centers Center of Refuge for Students from other areas outside Micro Grid was established in Kimmel Hall and in other powered dorms

Sequence of the ConEd Grid Fail and Microgrid Ops ConEdison starting losing Voltage in several of the six(6) high Tension feeders that serve the Plant The Micro Grid monitoring system looking back at the utility detected voltage differential between NYU’s Micro Grid and ConEdison The Systems relays on feeders automatically opened all six connection between ConEdison and NYU NYU’s Micro Grid signaled generators and operators that the system had switched to Island control These controls typical in interconnections between Micro Grids and the Utility performed and designed The Plant Operators now had a greater challenge - Make sure all the Equipment stayed on line. This involved a more delicate balance of thermal and electrical loads now the Utility was not there to back up these Micro Grid Generators. The operators and equipment performed flawlessly through the entire Black Out. After ConEdison was reestablished NYU seamlessly reconnected without destruction to any of the buildings in the Micro Grid.

Lessons Learned Resiliency Done in a Sustainable Way Resiliency Outlook to new construction, renovations and retrofits 48 hour LED emergency lighting Add critical buildings to cogen microgrid enabled by conservation measures Enhanced building curtailment plans and load shedding Microturbines Commitment to distributed generation - Cogen Phase 2 – providing utilities to an additional 1 million sf in the south campus “Shelter in Place” strategy to provide emergency power to student and faculty housing Emergency Fuel Strategy