Methodology march, 2017.

Slides:



Advertisements
Similar presentations
Report Communicating environmental performance along the food chain Setting the context Life cycle approach Why is communicating env performance important?
Advertisements

Survey design. What is a survey?? Asking questions – questionnaires Finding out things about people Simple things – lots of people What things? What people?
Energy Conservation Energy Management.
© 2008 REGEN Energy Inc How to approach DR Implementation DR-Expo 2008 Toronto © 2008 REGEN Energy Inc.
Cosa è ?. Mandatory labelling EU Energy Labelling Voluntary labelling EU Ecolabel EU Energy Star programme.
Campaign Planning – Direct Wines Using historic data to improve planning and forecasting TFM&A 2014 David Lockwood: Direct Wines Terry Hogan: Golden Orb.
Focusing on Life Cycle Cost (LCC) and Life Cycle Assessment (LCA) in GPP Green Public Procurement (GPP) - Lead the change National Conference George Jadoun,
Page 1 July 2014 Capacity Building of Banks/FIs For EE Project Financing Capacity Building of Banks and Financial Institutions for Energy Efficiency Project.
Franco Barnard M&V Project Engineer Baseline Service Level Adjustments of ECM on Compressed Air Systems 16 August 2012.
Mary Matteson Bryan, P.E Bi-Level Office Lighting with Occupancy Sensors E3T Field Assessment Mary Matteson Bryan, P.E. January 14, 2011.
Output Costing 11 th November 2010 Toby Spanier
ISO 50006: The new ISO standard for energy baselines and performance indicators Ian Byrne, Deputy Chief Executive National Energy Foundation
ISO can improve energy performance, reduce costs and help meet ESOS requirements
Manufactured Homes Calibration: Existing and New Homes Mohit Singh-Chhabra & Josh Rushton RTF Update May 12, 2015.
Il Programma ENPI CBC Bacino del Mediterraneo Projects promoted by the Province of Turin Turin, 29 January 2013.
Chapter 8 Budgets and Financial Records
The importance of Gross margin Example 1: Sales price ok, sales volume ok compared to the size of the company: Sales income100 units x
Chapter 8 Budgets and Financial Records
Challenges for district heating methodologies Worldbank Workshop on CDM Methodologies 5 December 2005 Lambert Schneider.
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
Lisa F. | May 20, 2014 Introduction to Lighting Incentives & Process for Medium/Large Customers.
Copyrights I Global Manager Group | Revision 0.1 Feb 2009 | 1 GMG DEMO OF ISO: ENERGY MANAGEMENT SYSTEM AUDITOR TRAINING PRESENTATION KIT.
 In a circuit, power is the rate that electricity is used  P= E/t  The unit for power is a watt (joules per sec)
Estimation of efficiency to foreign economic activity of enterprise How to get into the concrete market in the best way? In modern conditions it is possible.
Lucie Huang | May 20, 2014 Custom Projects. 2 2 Any Energy Savings Capital Measure that is not covered by Standard Spreadsheets, AND is a proven technology.
M&V Plan Template Lia Webster, Nexant New Orleans M&V Summit May 2003.
UNIDO - Energy Efficiency Creating a Standard Framework for Sustainable Industrial Energy Efficiency Lorence Ansermet UNIDO Regional Office in South Africa.
ISO Energy Management Systems Standard
Risk Management – Dynamic hedging 21st Mar Schneider Electric 2 ●Risk management ●The optimal duration of cost planning ●Procurement objectives.
ECONOMICAL VIABILITY OF THE NUCLEAR OPTION IN MEXICO Instituto Nacional de Investigaciones Nucleares.
Managing Our Energy: Staying Energy Smart! [Your Facility Logo Goes Here]
Scientific Irrigation Scheduling Subcommittee Thursday, August pm – 3pm, PDT.
Section 3.3.  Step 1: Set Your Financial Goals  Step 2: Estimate Your Income.
Wood Smoke: Monetizing Health Benefits Regional Technical Forum August 23, 2013.
Energy Energy comes in many forms including electricity, gas, oil and steam and is a resource used by organisations worldwide Energy is becoming increasingly.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
© South-Western Educational Publishing Chapter 8 Budgets and Financial Records  Budgeting and Record Keeping  Legal Documents and Filing Systems.
Chapter 8 Budgets and Financial Records
Chapter McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Short-Run Alternative Choice Decisions 26.
Energy (Energy Management) Regulations, 2012 World Accreditation Day
Key features of an effective Compliance Strategy
Presentation to the UUCF Coordinating Team October 5, 2016
Fixed vs. Variable Rates
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead.
UNIDO-GEF Industrial Energy Efficiency Project in Macedonia
ACC602: Strategic Management Accounting Topic 3: Standard costs for control measures: flexible budgets and manufacturing overhead analysis Slides adapted.
Seminar On Energy Audit Submitted To: Submitted By:
ISO/IEC
ESI Implementation Strategy in Mexico
EnMS Management Review
Energy Savings Insurance
Chapter 11 Standard costs for control: flexible budgets and manufacturing overhead Copyright  2009 McGraw-Hill Australia Pty Ltd PowerPoint Slides t/a.
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
“FIRA Energy Efficiency Program” Cases of Energy Saving Projects
Chapter 15 Strategic Pricing Methods
LATEST UPDATE IN LATVIA
Mid Semester UEB Energy Analysis of a Wastewater Treatment Plant by using Artificial Neural Network Presented by: Dr. Nor Azuana Ramli Electrical Engineering.
Electricity Procurement Options
Internal/External Sales Activity related to:
Quarterly National Accounts - Orientation
Chapter 2 – Scope of energy statistics
SOLAR PANELS SAVING IN YOUR HOME!
J. Cofala Z. Klimont CIAM/IIASA
Семинар на тема: Примери од имплементација на систем за управување со енергија според ИСО50001 Presentation of an existing example of Energy Management.
Implementing Physician Efficiency Measures
Chapter 8 Standard FIN-FL-4
METHODS FOR ANALYZING AND SUPPORTING A SUSTAINABLE PRODUCTION SYSTEM
Workshop on GRP, Quito, Ecuador, 7-9 Nov. 2018
PG&E EV Fleet Program.
PG&E EV Fleet Program.
Presentation transcript:

Methodology march, 2017

Designing a balanced MR&V… We must assume a trade-off … Too simple versus too complex Too imprecise versus totally accurate Cheap versus expensive

Energy Eficiency Projects Scope Equipment modernization Small Equipment Sustitution EE in complex systems ESI Massive No MRV (estimated) Small equipments Cheap Very small SME Don´t need to take an insurance Semi-Massive MRV standarized Medium and standarized projects Relative Cheap SME Insurable No massive Adhoc MRV Big projects Expensive SME Not insurable

The basis: ISO50006 The new ISO standard oriented to energy baselines and performance indicators Define energy consumption and use, and the various meanings of energy efficiency Introduces Energy Performance Indicators (EnPIs) and Energy Baselines Give context of quantifying energy performance

The objective : Quantify energy using indicators CONSUME EnPI Método PERIMETER USE

Using standard EE Methodology …

How? Measuring and comparing base line versus new operation Fuente : Manuales ISO50006

The methodology manuals and tools To support the project structuring and contract clauses, there are different instruments : Manual that describes this methodology and how structure a project to be validated Formats that allow structure a project Guide to how calculate energy efficiency for each technology

Calculate Energy Savings and Non-compliance is easy … Base line EnPI: 0.80 kWh per delivered HP Proposed EnPI : 0.40 kWh per delivered HP Measured EnPI : 0.50 kWh per delivered HP Commit to use : 14,000 delivered HP Cost of energy : $1.8 per kWh used The estimated energy saving in the period (6 months) is 5,600 kWh -> $10,080 MXP. Non-compliance: (0.40 – 0.50) X (14,000 HP delivered) X $1.8 The provider must pay $2,520 to the consumer

Considerations The Methodology sets a fixed price to energy consumed The consumer agrees to use the equipment in a defined minimun level The measurement during the base line assesment and verificartion periods is performed using controlled variables and parameters The contract does not reward a performance beyond savings commitment Fuente : Manuales ISO50006

Ing. Adalberto Padilla Limón THANK YOU ! Ing. Adalberto Padilla Limón apadilla.energia@gmail.com