TTC System Status May 2007 System overview Production Status

Slides:



Advertisements
Similar presentations
CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Advertisements

Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
CSC upgrade for LS1 USA-15 rack: layout, construction and installation 11 th February 2013.
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
JPV, TB of Nov.15 th, ‘Rack Status‘ Jean-Pierre Vanuxem, PH-AIS.
Electronic Systems Support LHC Crates 2005 Paul Harwood PH Electronic Systems Support Group (PH-ESS) Meeting Sept 1, 2004.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Electronic Systems Support CAN Branch PSU Designed: Bjorn Halgren PH-ESS Responsible:Paul Harwood.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
Sophie BaronTTC1 TTC status February 2005 ATLAS electronics.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Conversion Presentation. Overview T. Rowe Price Conversion Team Flowserve Team Flowserve Participant May 2010 June 2010July 2010August 2010September 2010October.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
Sophie BARON, PH-ESSLEADE - 07 Nov  TTC system status reminder  Upgrade principle  [Some] details about the infrastructure  Practical implementation.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
Status of NA62 straw electronics Webs Covers Services Readout.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
28 June 2004ATLAS Pixel/SCT TIM FDR/PRR1 TIM tests with ROD Crate John Hill.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
26 March 2007LEADE/ D. Swoboda1 LDX implementation  Progress on action items  Progress on installation  New topics.
Work Review Angel Monera Martinez. Index Objectives Time Frame Analog Link  Analog Requirements  Miteq Characterization and tests Digital Link  Requirements.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup SPS RF FARADAY CAGE Purpose, Scope and deliverables Javier Serrano.
Sophie BARON, PH-ESSLEADE, 15/06/06 1 TTC upgrade Status May 2006  Overview  AB/RF optical links  Receiver crate  Status and schedules  Documentation.
HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
NA62 GigaTracKer Working Group meeting December 13, 2011 Matthew Noy & Michel Morel Status of test for GTK carrier and components.
MobiDick4 progress report Carlos Solans. Introduction MobiDICK is a complete test bench for super-drawers Will be used during the maintenance in the long.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.
Online clock software status
CC LLRF SM18 test plan and BA6 infrastructure
Software Overview Sonja Vrcic
Cabling for LHCb Upgrade
LKr status R. Fantechi.
FTK infrastructure in USA15 Status and plans for 2015 A
Production Firmware - status Components TOTFED - status
S. Baron - BE/BI-PH-ESE GBT/VL meeting
AM system Status & Racks/crates issues
Injectors BLM system: PS Ring installation at EYETS
RF-TTC Joint News LEADE, June 2008
TTC UPGRADE FOLLOW-UP Sophie Baron, Angel Monera Martinez LECC 2006
The ELENA BPM System. Status and Plans.
WP02 PRR: Master Oscillator and RF Reference Distribution
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
TTC system for FP420 reference timing?
Strategy for long-term support of the TTC system
TB8100 Technical Training July 2005
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
TTC Information Meeting
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
LHC Fast Timing Commissioning
Krzysztof Czuba ESS LLRF Quarterly Meeting
TTC news December 04 Sophie Baron TTC.
Presentation transcript:

TTC System Status May 2007 System overview Production Status Software and Firmware Support Sophie BARON, PH-ESS LEADE, 07-05-2007

Upgrade history 2004-2005: Agreement between PH and AB/RF on the upgrade of the system, including maintenance and support issues Specifications of the new system 2006: Design of new modules for the system (and for AB/RF transmission links in general) RF_Tx and RX_Rx Analog modules RF_Tx and RX_Rx Digital modules RF2TTC TTC fanout Prototypes validation Fibres installation request 2007: Final versions validation Production Readiness Review in February http://indico.cern.ch/conferenceDisplay.py?confId=12273 Production Fibres installation Sophie BARON, PH-ESS LEADE, 07-05-2007

TTC UPGRADE [overview] CMS CCR – TTC support ALICE LHCb ATLAS Sophie BARON, PH-ESS LEADE, 07-05-2007

Global results of the full system All the complete tests results are available on the TTC-upgrade web site or on the PRR site (indico server): http://indico.cern.ch/categoryDisplay.py?categId=1099 Sophie BARON, PH-ESS LEADE, 07-05-2007

System overview Production Status Software and Firmware Support Sophie BARON, PH-ESS LEADE, 07-05-2007

VME_CRATES Used Distributed Status Support Paid by Crate (ALICE) 1 Power supply being prepared by Wiener ESS Crate (ATLAS) Pool item Crate (CMS) Crate (LHCb) Crate (CCR-ESS) Crate (ESS support) TOTAL 6 5 Status: Ordered and received. All have been distributed except ALICE. Sophie BARON, PH-ESS LEADE, 07-05-2007

VME CRATE CONTROLERS Status: Delivered (except for ALICE) Used Distributed Status Support Paid by VP315 (ALICE) 1 Available ESS VP110 (ATLAS) Pool item A2818 + V2718 (CMS) V1718 (LHCb) VP110 (CCR-ESS) VP110 (ESS support) TOTAL 6 5 Status: Delivered (except for ALICE) Sophie BARON, PH-ESS LEADE, 07-05-2007

RF_Tx Production Status: Used Hot Spares Cold Extra TOTAL Status Delivery Paid By Support Tx (SR4) 2 1 5 PreProd Sept Exp AB/RF Tx (CCR) 4 10 Production Status: Final version (V2) being produced now (as a preproduction) (see P. Baudrenghien’s slides) Production launched in July Equipment available in Septembre Used boards installed in AB/RF area All the spare boards will be kept and managed by AB/RF Sophie BARON, PH-ESS LEADE, 07-05-2007

RF_Rx Production Status: Used Hot Spares Cold Extra TOTAL Status Delivery Paid By Support Rx (ALICE) 2 1 5 PreProd Sept Exp AB/RF Rx(ATLAS) Rx(CMS) Rx(LHCb) Rx(CCR- ESS) 10 25 Production Status: Final version (V2) being produced now (as a preproduction) (see P. Baudrenghien’s slides) Production launched in July Equipment available in Septembre Used boards and hot spares installed in experimental areas All the other spare boards will be kept and managed by AB/RF Sophie BARON, PH-ESS LEADE, 07-05-2007

RF2TTC Production Status: Used Hot Spares Cold Extra TOTAL Status Delivery Paid By Support Rx (ALICE) 1 4 Prod June Exp PH/ESS Rx(ATLAS) Rx(CMS) Rx(LHCb) Rx(CCR- ESS) 5 20 Production Status: Final version (V3) has been validated and is now being produced Equipment available in June RF2TTC kit is available (RF2TTC, RF_Rx, RF_Tx, Fanout cables) and still being used by experiments A second RF2TTC can be lent if required Used boards and hot spares installed in experimental areas All the other spare boards will be kept and managed by PH/ESS Sophie BARON, PH-ESS LEADE, 07-05-2007

TTC Fanout Production Status: Used Hot Spares Cold Extra TOTAL Status Delivery Paid By Support Rx (ALICE) 2 4 Prod July Exp PH/ESS Rx(ATLAS) 1 Rx(CMS) 6 Rx(LHCb) Rx(CCR- ESS) 9 7 16+2 Production Status: Final version (V2) has been validated and is now being produced. Production launched now. Equipment available in July Used boards and hot spares installed in experimental areas Cold spares will be kept and managed by PH/ESS Sophie BARON, PH-ESS LEADE, 07-05-2007

Other Equipment SMA to LEMO cables: Optical Patches Attenuators Made by C. Sigaud, PH/MIC 7 per experiment (6 + spare) will be delivered with the RF2TTC Optical Patches Being ordered now to Fibernet Please answer to my e-mail about the fibre lengths Attenuators 6, 10 and 20dB will be ordered now to Fibernet Sophie BARON, PH-ESS LEADE, 07-05-2007

PH/ESS already paid in advance for Money Matters PH/ESS already paid in advance for Part of the fibre installation Components for production of the RF2TTC Part of the components for the RF_Tx and RF_Rx modules A cost estimation of the modules production and of the fibres installation will be sent to the TTC coordinators of all the experiments this week After approval, a TID will be sent to each of them, to finance the work being done now Sophie BARON, PH-ESS LEADE, 07-05-2007

System overview Production Status Software and Firmware Support Sophie BARON, PH-ESS LEADE, 07-05-2007

Software Software Firmware Complete API will provide RF_Rx control and monitoring RF2TTC control with calibration routines RF2TTC test procedure Portability to CCT controllers and CAEN PCI/USB interfaces The frequency received by each Rx will be published on the DIP for the RF Firmware RF2TTC firmware is done Will be used by the experiments during the summer Can be re-discussed end of September if some new functionnalities are required. Sophie BARON, PH-ESS LEADE, 07-05-2007

System overview Production Status Software and Firmware Support Sophie BARON, PH-ESS LEADE, 07-05-2007

SYSTEM SUPPORT In case of troubles….. First tests (module exchange with a spare if available) Piquet Support (working hours technical help) Maintenance Crate (bin, fantray, power supply) Exp X PH/ESS POOL Crate controller Transmission quality (RF_Tx) AB/RF RF_Rx RF2TTC Fanout Special components (6dB attenuators, SMA to Lemo adaptors) Sophie BARON, PH-ESS LEADE, 07-05-2007

TTC GENERAL SUPPORT I will be away from mid-May until end of September Stephane DETRAZ (stephane.detraz@cern.ch, PH/ESS) will take care of the support, maintenance and help to installation during this time TTC upgrade modules Production tests Distribution to users Technical help for the setup of the TTC upgrade system Follow-up of the fibres installation (with Nicolas Zaganidis, TS/EL) Technical questions about TTC system… Be kind, Stephane is just beginning and he is not at 100% on the TTC project! We will send an e-mail to the TTC coordinators with all the required information All the necessary documentation will be stored on the TTC-upgrade web page and could be sent on request by Stephane I will read my e-mails on a (un)regular weekly basis Sophie BARON, PH-ESS LEADE, 07-05-2007

DOCUMENTATION Project web page: System test report: http://ttc-upgrade.web.cern.ch/ttc-upgrade/Default.htm System test report: http://ttc-upgrade.web.cern.ch/ttc-upgrade/New_system/TTCupgrade_System_Test_report.pdf RF_Rx (&Tx): The following information is available from the web site: http://ttc-upgrade.web.cern.ch/ttc-upgrade/New_system/RF_Rx_D.htm OCP-STX and SRX modules datasheet TRR-1B43-000 datasheet First evaluation of the SDH/SONET and TRR transmitters and receivers Final test of the Version1 modules EDMS Schematics and Layout of the RF_Tx_D: EDA-01380 EDMS Schematics and Layout of the RF_Rx_D: EDA-01382 RF_Tx_D User Manual RF_Rx_D User  Manual CVS repository for RF_Tx_D and RF_Rx_D graphical control panels (tcl&tk panels) Money spent for the RF_Tx_D and for the RF_Rx_D: RF2TTC: The following information is available from the web site: http://ttc-upgrade.web.cern.ch/ttc-upgrade/New_system/RF2TTC.htm Design Review: TTC project page on the Indico Server RF2TTC User Manual - last submission: 30/01/2007 RF2TTC test results Schematics and Layout of the RF2TTC: EDA-01357 CVS repository for RF2TTC control software Analysis of the board layout with SpecctraQuest, made by Alexandra Dana Oltean Karlsson, to understand the differences between the BCref and the other Clock paths (40ps rms jitter instead of 26): board analysis, vias extraction VHDL code of the FPGA. Money spent of the RF2TTC Sophie BARON, PH-ESS LEADE, 07-05-2007