17/09/2012LHC 8:30 meeting LHC Summary Week 37 Coordination: Jorg Wenninger & Jan Uythoven.
Advertisements

CONTENT: Beam characteristics and parameters Filling schemes Operational settings OP procedure and COLL setting Planning Shift breakdown To define the.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
07:30 – 10:30 Asynchronous dump test with Beam 2. No issue found. FIDEL update. Now chromaticity decay corrected. 12:13 Beam dump due to problem in the.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
28/01/2013LHC 8:30 meeting Summary of Week 4 pPb physics Machine Coordination: Mike Lamont & Jan Uythoven Ion coordination: John Jowett.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Saturday :12 Stable beams fill 3351 Initial luminosity
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Monday fill with 1092 bunches (6 h stable beams)
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Tuesday 22nd January - morning
Summary of Week 11: 14 – 21 March
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Thursday 24th January - morning
Friday 31st August & night
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
LHC Operations overview Week 28 – Getting back
Monday Morning – recovery from cryo.
Wire almost entirely through beam before BLM triggers dump
Friday Morning 7:30 injection for fill 2908
Sunday
Wednesday 03/11 – The Plan Finish electron-cloud program:
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Tuesday morning 09:30 Beam dump, SIS dump due to lost connections with FCG FECs. Coincides with starting a development SIS server to test new interlocks.
Wednesday 10/5 Cryo recovery until 18:30
Sunday/Monday & :30 Stable beams. Fill #1851.
Monday – Morning Fill 3265 stable beams since 1:31
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 24 October hours of 25ns MD
LHC Morning Meeting - G. Arduini
Monday 14:00 beam dump Access:
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Tuesday 17/5 10: TeV - colliding. Start roman pot alignment ...
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Thursday – Morning Energy matching at injection with H CODs
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Thursday 22 September 2011.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
LHC Morning Meeting - G. Arduini
Tuesday In the morning test cycle with probe for Q’ measurement.
LHC Status Fro Morning 9-Sep
Saturday 24 September 2011.
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Monday 27th August & night
Wednesday morning Waiting for PS – problem on RF cavity.
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
31/3/2010 Difficult day… but at the end stable beams.
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
HI2011 Commissioning Status
Saturday Morning used to complete the loss maps and asynch dumps (with RPs). All loss maps OK (B. Salvachua), but the off-p cleaning for B1 (Lead) was.
Monday 5 July Morning: Continued with the Physics fill, 7b x 7b, 1e11/bunch Stable beams from 2:30 am to 13:30 : 11 hours.
Presentation transcript:

Monday 21st January & night 05:20 Injecting 338 bunches/beam fill 3479 08:13 Dump on BLM losses 9L7.B2, during change of RF frequency at flat top to common RF frequency. 09:00 Access for LHCb who can't take data. 11:20 Cycling. 14:00 Filling for physics 200ns_270p_248Pb_15inj24bpi. 15:21 Second dump due to losses on BLM 9L7.B2 during RF frequency change. Increase BLM thresholds. 18:15 Injecting physics beam 20:47 Stable beams fill #3481 06:58 Beam dumped by operator Filling for the same again, proton intensity bit larger (2e10) 22/01/2013 LHC 8:30 meeting

Finally … Vistar time stamp 1 h out 22/01/2013 LHC 8:30 meeting

Fill #3479 Beams dumped on BLM losses 9L7.B2 at moment of frequency change to bring proton and ions beams on the same RF frequency. 22/01/2013 LHC 8:30 meeting

Fill #3480 Changes: Dumped again on same BLM on third frequency step RF frequency changes in 3 steps with pause of 10 s in between Rate of change slowed down by factor 4 Changed filling scheme to 200ns_270p_248Pb_15inj24bpi extrapolating from fill o-night should not reach dump threshold Dumped again on same BLM on third frequency step 1 unit = 20 ms 22/01/2013 LHC 8:30 meeting

Fill #3481 Increased BLM threshold (monitor factor) factor 3 - BLMQI.09L7.B2I10_MQ (0.1 -> 0.3) - BLMQI.11L7.B2I10_MQ (0.1 -> 0.3) Some scraping of beam in the SPS It passed… just: Before dumped on RS 10 ms 22/01/2013 LHC 8:30 meeting

The Plan – needed to increase #bunches Increase the limits of the other BLMs in the same way Q15, Q17, … Further slow down frequency trim – split third step ? Move orbit and/or collimators slightly at the primary ? 338 Pb 248 Pb 248 Pb 120 Pb BLM limit BLM loss 22/01/2013 LHC 8:30 meeting

Stable beams Alice came in too high – adjusted for next fill incorporated +10 um in the separation for ALICE ALICE luminosity signal for leveling is quite noisy …. 22/01/2013 LHC 8:30 meeting

Various Wire scanners not to be used until checked in tunnel Preparing for moving in Roman Pot during physics V/d Meer scans next week Mon/Tue Access requests: Wire scanner, J.Emery, point 4, 2 hours. Collimators UJ33, test position sensors, M. di Castro, A.Masi, 20 minutes. “Train”, B.Feral, D. Paulic, PM56/UL55, 1 h during working hours BGI, M.Sapinski, R4, ½ h 22/01/2013 LHC 8:30 meeting