Baby-MIND for T2K collaboration

Slides:



Advertisements
Similar presentations
20 January 2011R&D staf meeting - Jan T.1 Activities in 2010 at DESY test beam 4-chip/Ingrid tests in March; 3 days OK Single Ingrid tests in May combined.
Advertisements

Accelerator based Neutrino program around the world 1. Europe: Neutrino platform at CERN ESS second maximum? 2. Japan: T2K and HyperK status 3. USA: LBNF.
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
J-PARC PAC ‘07 Imperial College/RAL Dave Wark Status of the T2K Experiment Dave Wark Imperial/RAL J-PARC PAC KEK July 6, 2007.
Harold G. Kirk Brookhaven National Laboratory Targetry Program 5 Year Plan H.G. Kirk Muon Collaboration Meeting LBNL February 16, 2005.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
JLOTS Web Based Training Update
1 T2K Beam Operation Summary (earthquake recovery and beamline survey) NBI 2012 T. Ishii (KEK) for the T2K beam group.
Baby MIND Magnet 10 th June Meeting E.N.. Meeting goals 10 th June meeting goals: – Magnet design endorsement – Choice of coil option – Steel procurement.
Caren Hagner CSTS Saclay Present And Near Future of θ 13 & CPV in Neutrino Experiments Caren Hagner Universität Hamburg Neutrino Mixing and.
Status and outlook of the Micromegas modules D. Attié, D.S. Bhattacharya, P. Colas, S. Ganjour, et al. LCTPC Collaboration meeting DESY, 30/05/2014.
27 April ’12 MINER A meeting Alessandro Bravar Université de Genève UniGE Miner a Application Motivation UniGE neutrino group MINER UniGE NA61 / SHI.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
Q&A on T2K construction of beam line near detectors budget collaboration (contribution from each) T2KK.
MoEDAL MoU EDMS No Issues from LHCb & CERN  MoEDAL at IP8  Infrastructure  TimePix Deployment  Access & Safety  General Conditions MoEDAL.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
Fermilab Neutrino Program Jim Strait Neutrino Discussion at CERN 26 November 2013.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
1 ND280m Overview of the activities T. Nakaya (Kyoto) Nov 7,
Status and plans for role of Japan in HL-LHC Katsuo Tokushuku Institute of Particle Nuclear Studies (IPNS) High Energy Accelerator Research Organization.
MICE CMPB Alain Blondel 1 Highlights on MICE.
COMET. μ-e conversion search from muonic aluminium J-PARC pulsed proton beam to produce pulsed muon beam Forbidden in the Standard Model  clue to the.
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
Plan to go forward Peter Wilson SBN Program Coordinator 27 September 2014.
10 th of April 2003 ATLAS “MSS Specification” Magnet Safety Systems – Magnet Common Project E. Sbrissa, G. Olesen – CERN/EP 5 Tests 5.1 Pre-production.
TPC Collaboration Meeting Peter Glassel 1 Reminder on Installation Schedule (ALICE Forum June 2002)  Install Muon magnet directly into experimental.
1 Status of the T2K long baseline neutrino oscillation experiment Atsuko K. Ichikawa (Kyoto univeristy) For the T2K Collaboration.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
SECOND PHASE DATA TAKEN 43 PRESSURE SETTINGS HAVE BEEN TAKEN!!! Jaime Ruz Armendáriz Patras, May 22 nd, 2006.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
1 TPC Large Prototype (LP) Beam Tests Jan Timmermans NIKHEF/DESY (for LCTPC Collaboration) ALCPG 2011, Eugene.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
T2K IFOP 11/7 Imperial College/RAL Dave Wark Status of the 280m Detectors and Current Issues Dave Wark Imperial/RAL J-PARC IFOP Videocon Nov. 16, 2007.
Review of MGs involvement in SRA process MG meeting 24 th January 2007 Brussels.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
DUNE-UK Mark Thomson University of Cambridge DUNE-UK Meeting, UCL May 15, 2015.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
CERN Steve Kettell DUNE Collaboration Meeting January 12, 2016.
T2K Oscillation Strategies Kevin McFarland (University of Rochester) on behalf of the T2K Collaboration Neutrino Factories 2010 October 24 th 2010.
SPSC recommendations [Installation at PS-T9] Baby MIND weekly meeting 28 th October 2015.
eTOF - status and plan CBM-STAR joint Workshop Outline Introduction
Baby MIND Transport to Japan
E. Noah, A. Blondel, P. Benoit, F. Cadoux, A. Dudarev, L. Nicola, H
SCHEDULE Nov 1st - Assembly Table Complete
News and brief overview of Beamline plans for the next few months
Baby MIND Transport to Japan
Preparing Baby MIND for Japan
Alain Blondel 11 October 2010 GDR NEU2012 summary
Proposed Bay TMDL Schedule
MICE Project in the US: Completion of Efforts
Baby MIND Status on T9 E. Noah 6th July 2017.
Notes on Ramp-Up and Production
Renovation of the 45-year old PS magnets
NA61 news and plans News from other labs/experiments
Baby MIND Logistics for Japan
Toward the final design of a TPC for the ILD detector
Technical Support Activities in PH-ADO-PO
Student Assignment Review Advisory Committee
ND280 upgrades Alain Blondel T2K meeting 3June15
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
Nguyen Thi Hong Van VN Neutrino Meeting January 19, 2018
<month year> doc.: IEEE ptc November 2012
Alain Blondel Neutrino Experiments
Review plan of the nature reporting – update 6
Presentation transcript:

Baby-MIND for T2K collaboration Baby-MIND NEXT STEPS Baby-MIND group organized transport: transporter is responsible from CERN to JPARC, Detector will be donated to KEK (letter written, agreement drafted) 18 October ~12 December (+- few days) E. Noah will arrive in japan around 12 December 14-15 Dec  or 18-19 Dec: reception of four detector blocks at J-PARC Proposal for installation and operation was submitted to JPARC PAC will be submitted to T2K Storage in NA building (December) installation in B2 pit (in early 2018)      + first phase 1/8-1/22  (with 80% C.L. for readiness. to be confirmed at the end of Nov.)      + second phase 2/12-2/26 will be supervised by Ichikawa, Tsukamoto, and neutrino facility group. Engineers from UNIGE and CERN can be present as necessary. (while T2K is not running and UA1/Nomad magnet is off). 400 V powerline needed for Baby-MIND magnet; under discussion: There are two possibilities 1. line prepared for ND magnet operation, but not used because of noise problem 2. line for magnet opening. need to make a new branch if we adopt this. Both require approval from J-PARC and T2K. 15/11/2017 Baby-MIND for T2K collaboration

Baby-MIND for T2K collaboration Commissioning, DAQ integration with Wagasci and documentation will be provided by Baby-MIND team in ~Jan->March 2018 Then we will train our colleagues in Wagasci and operate as WAGASCI subdetector. Proposal to run WAGASCI+Baby-MIND experiment will be submitted to JPARC and T2K Eventually detector should be in condition to be operated by T2K from ND280 control room (similar to INGRID etc..) conditions and review process need to be defined. On a longer time scale the Baby-MIND detector could remain in B2 and be available as muon fiilter facility for possible other fine grain detectors such as -- High pressure TPC -- specific e cross-section measurement Off axis angle of 1.5 degrees as well as internal geometry of modules can still be discussed – detector geometry has some flexibility and in principle movable (as well as any 75 ton object, of course) 15/11/2017 Baby-MIND for T2K collaboration

Baby-MIND for T2K collaboration A similar (simpler) letter will be written for the shipping of the Baby-MIND frames to support the detrector in the pit. 15/11/2017 Baby-MIND for T2K collaboration