Integrated Program Management Case Study Briefing

Slides:



Advertisements
Similar presentations
Program Assessment Briefing (PAB) Instructions Chart 1: Overview Provide a narrative mission description – Self explanatory Provide executive level program.
Advertisements

1 Earned Value Management a tool for project Portfolio management Jim Strong DLMP PMO Director.
Module 8: Government Required Reports
N O T E “CLICK” TO CONTINUE… If the slide show is not launched, click on View  Slide Show in the menu bar at the top of the Power Point window. When the.
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Chapter 10: Monitoring and Controlling Change
Project Evaluation and Control
Project Evaluation and Control Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall.
CPM-400: xxx Lesson B: EV Data Analysis I Instructor Ellen Udell
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Project Monitoring and Control. Monitoring – collecting, recording, and reporting information concerning project performance that project manger and others.
Dave Bachman DAU / CDSC September 9, 2004
Project Cost Management
Copyright © 2008 Industrial Committee on Program Management. All rights reserved. Predictive Measures of Program Performance March 19, 2009 Industrial.
Presenter Date Page Project manager The PROGRAM The Company Name 03/21/01 STOPLIGHT METRICS Stoplight Charts provide a means of communicating the status.
Mohawk Vehicle - MEGA HERZ ELEC & VEN - MOH-2 F C-0050 J:\CS40\Data Analysis\- Standard Analysis Package/Sample Standard Analysis Package.
Mohawk Vehicle - MOH-2 - F C EVM Quick-Look Report.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall13-1 Project Evaluation and Control Chapter 13.
1 Cost Health Checks Aug 2013 NAVY CEVM 2 Outline BCWP with no ACWP ACWP with no BAC Credibility of the Most Likely EAC Timely detail planning MR health.
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
1 Earned value analysis Planned value (PV) or Budgeted cost of work scheduled (BCWS) – original estimate of the effort/cost to complete a task (compare.
EARNED VALUE MANAGEMENT & ORACLE PRIMAVERA P6 TREY MILLER, MBA, PMP ORACLE PRIMAVERA P6 EPPM CERTIFIED IMPLEMENTATION SPECIALIST GLOBAL PROJECT MANAGEMENT,
EVM – Do You Really Know What the Numbers Mean? Booz | Allen |Hamilton Seth Huckabee EVP, PMP, PMI-SP.
Earned Value Management Reading the Roadmap to Project Success (or, Are We There Yet?) Steve Margolis, PMP Perpetual Technologies, Inc. March 19, 2008.
EVM Home Page = Address: DAU POC: (703) (DSN 655) Revised December 2006 TERMINOLOGY.
Using MS-Project INFS MS-Project: 3 Major Parts 1. Project Planning 2. Project Execution & Tracking 3. Project Reporting.
Earned Value Management Reading the Roadmap to Project Success (or, Are We There Yet?) Steve Margolis, PMP Perpetual Technologies, Inc. April 13, 2010.
Project Management 1 Project Control. Project Management 2 Topics Project Control Status Reporting Earned Value Analysis.
Measuring Progress HNC Project Management. Measuring Schedule Performance Break project tasks up into small work units. Work units that are too large.
MISUSE OF EARNED VALUE MANAGEMENT RESULTS IN ERRONEOUS CONCLUSIONS
Project Management Earned Value Management Demonstration
Performance Measurement Baseline Contract Price (Project Price)
“PMP® Exam Prep” Earned Value Management
TOPIC-8B- PROJECT COST CONTROL
PROJECT MANAGEMENT AND CONTROL
Chapter 7: Project Cost Management
IEVMC Lesson 8 FY14 Analysis Case Study Performance Management Analysis Tools Student guide page 8-5.
ENGR 281 Engineering Scholars Program Project Management Life Cycle Overview K. F. Reinschmidt J. L. Frank / Marathon Ashland Petroleum LLC Chair in.
Project Communication, Tracking, and Reporting
Performance Measurement Baseline Contract Price (Project Price)
Project evaluation and control
5. Cost resources & PLAN DURATION
Earned Value Management
EVM 202—Lesson 7 Tools Analysis Case Study
September 2016 EVM 202—Lesson 4 Integrated Baseline Review Process (Part 3: IBR Process)
September 2016 EVM 202—Lesson 4 Integrated Baseline Review Process (Part 4: Baseline Maintenance)
September 2016 EVM 202—Lesson 8 Integrated Product Team (IPT) Analysis and Performance Case.
Earned Value Management
Dave Bachman DAU / CDSC September 9, 2004
Understanding Earned Value Analysis
EVM 202—Lesson 7 Tools Analysis Case Study
September 2016 EVM 202—Lesson 4 Integrated Baseline Review (IBR) Process (Part 1: IBR Process and Baseline Development)
Understanding Earned Value Analysis
September 2016 EVM 202—Lesson 6 Integrated Program Management Analysis Tools and Techniques (Part 1)
IBR Documentation Review
So your schedule says your project will finish on time
LSST Project EVMS Performance Overview Kevin E
Implementing EV in IT A Three Step Approach John Chapman Touchstone Ltd
Earned Value Measures Planned Value (PV) Earned Value (EV)
فرآيند كنترل پروژه.
Project Evaluation and Control
5. Cost resources & PLAN DURATION
STOPLIGHT METRICS.
5. Project PLAN & cost estimation
Missile Defense Agency EVM Update
Probability of Success
Understanding Earned Value Analysis
Managing Project Work, Scope, Schedules, and Cost
Project Evaluation and Control
Presentation transcript:

Integrated Program Management Case Study Briefing LAR Vehicle Program Contract Status as of [Month/Year] Observations and Action Plan Team [A/B/C/D]

Overview Selected Earned Value Management (EVM) metrics Integrated Master Schedule (IMS) analysis—two or three charts Schedule drivers and cost drivers Management charts—three to five charts Cost trends Issues and risks Summary of program issues and recommended solutions Focus on qualitative causal analysis in your briefing and consider the story being told (i.e., the why).

Discuss what these metrics mean. Selected EVM Metrics Cost Performance Index (CPI) = Schedule Performance Index (SPI) = Baseline Execution Index (BEI) = Contract Modifications ($) = Contract Modifications (%) = PMB Revisions (%) = (Performance Measurement Baseline) Discuss what these metrics mean.

IMS Analysis Use two or three charts to show: Schedule health issues Critical path to the next two milestones (insert critical path schedule) Slipping tasks with float analysis

Technical Performance Status Current status of Key Performance Parameters (KPPs) Insert Technical Performance Measurement (TPM) charts, as applicable, that support your “story”.

Discuss how you identified these drivers. Schedule Drivers [Driver 1] [Driver 2] [Driver 3] Discuss how you identified these drivers.

Discuss how you identified these drivers. Cost Drivers [Driver 1] [Driver 2] [Driver 3] Discuss how you identified these drivers.

Key Management Charts—Chart 1 Select three to five Empower charts that support your “story”. (Use Empower line charts, not bar or column charts.) [Chart 1]

Key Management Charts—Chart 2

Key Management Charts—Chart 3

Cost Trends Budget at Completion (BAC) = [Enter BAC] CPICUM = [Enter CPICUM] EAC TCPI Contractor Government Low Government High Government Most Likely Estimate at completion (EAC) calculation method = [Enter the performance factor(s) used to calculate most likely EAC] (HINT: Not EAC based on CPICUM) Price at completion (PAC) based on most likely EAC = Is there sufficient funding?

Issues and Risks APB Performance Schedule Budget Contract Performance Refer to your Program Control Book for the latest APB requirements. Performance Schedule Budget Contract Refer to the last page of your Program Control Book for the latest contract requirements. Performance Schedule Budget

Recommended Solutions Identify specifically what actions are required by whom and by when for effective program management. (HINT: Pay attention to the briefings for previous time periods. You may wish to update your brief accordingly.)