GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) https://gis.cern.ch/gisportal/Racks.htm Olivier Barrière.

Slides:



Advertisements
Similar presentations
Fibres & copper Cabling activities LIU meeting 27/09/2013 F Duval 27/09/2013 F Duval Cabling acxtivities LIU 1.
Advertisements

Automatically Capturing Data from SCADA to the Maintenance System
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Barriere O, Le Roux P
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Injector De-cabling Project Project Team Meeting #
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
HL-LHC Configuration Management Keywords : HW Baseline, Naming, Parameters, Layout DB, Change Control The HiLumi LHC Design Study (a sub-system of HL-LHC)
TS, Length of YETS EYETS LIU & CONS Project
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
Injector De-cabling Project Enlarged meeting # E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project Team.
1 1. Some recent views ( ) 2 Linac tunnel
Wojciech Sliwinski BE/CO for the RBAC team 25/04/2013.
Status of LS1 collimator maintenance O. Aberle – 03/03/14 With input from P. Bestmann, S. De Man and J. Lendaro.
Injector De-cabling Project Enlarged project meeting # S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
E. Calvo (BE/BI-QP) 12/10/2015 LHC BI fibre infrastructure.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
LS1 Review P.Charrue. Audio/Video infrastructure LS1 saw the replacement of BI and RF analog to digital video transport Was organised in close collaboration.
Quality assurance - documentation and diagnostics during interventions Corrective maintenance seen from the Technical Infrastructure operation Peter Sollander,
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
– Machine Controls Coordinators (MCC): team and role – Overview of renovations during LS1 – Proposal for after-LS1 Commissioning organization ACCOR PROJECT.
Proposal: Use of ECRs for “Controls” Changes and Renovations Rende Steerenberg, Samy Chemli, Marine Gourber-Pace, Klaus Hanke, Verena Kain, Bettina Mikulec,
TCR Remote Monitoring for the LHC Technical Infrastructure 6th ST Workshop, Thoiry 2003U. Epting, M.C. Morodo Testa, S. Poulsen1 TCR Remote Monitoring.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
LIU–PLI report LIU Project Team meeting. Follow-up on the Engineering Change Requests Engineering Change Requests for the YETS PSB PS.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
CERN/BE/CO – Claude Dehavay - Sept.2016 (with input from Z.Zaharieva and M.Vanden Eynden) 1.
Electrial Safety LS2 days November 2016 AP
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
LHC intervention scheduling with the Work Acceptance Tool
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
V4.
YETS & LS2 Works EN-EL / Power distribution
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
EYETS Works EN-EL [ FC excluded ]
TC activities.
Performance monitoring framework for the technical infrastructure
Status and Plans for InCA
YETS & LS2 Works EN-El on LHC / Power distribution
MEMORANDUM Cabling and Electrical activities requests YETS 2017/2018
Identification of the unused cables
Space Management and Logistics during LS2
Injector De-cabling Project
EC Activities Status for the LIU
Unifying for all accelerators and projects
YETS & LS2 Reminder G. Girardot 20 juin 2017.
De-cabling strategy during YETS
Georgia Gkioka TE-VSC-ICM National Technical University of Athens
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
News from QAC and Central Services
Survey on “Chargés de Consignation” Follow-up
SPS activities during LS2 TE-EPC (Power Converter Group)
YETS & LS2 Works EN-EL / Power distribution
Overview & baseline of LS2 and roadmap for CRG
GIS Portal Racks Project
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
TEST PLANS for HL LHC IT STRING
Change Assurance Dashboard
Benoît DAUDIN (GS-AIS-PM – CERN) 22-March-2012
Experimental Areas – LS2 planning
LS3 Study & Readiness Meetings
Presentation transcript:

GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) https://gis.cern.ch/gisportal/Racks.htm Olivier Barrière – BE/CO 4 February 2016

Olivier Barrière - BE/CO Outline Context Phase 1 - Data Integration Phase 2 - Validate & Maintain data Summary 4 Fev 2016 Olivier Barrière - BE/CO

Olivier Barrière - BE/CO Context GIS PORTAL Racks was started following an ACCOR study in 2011 To improve cabling, cabling documentation & data sharing Focus on BE/CO best effort service team To reduce piquet intervention time to accelerators Prototype in 2012 We lacked a global infrastructure to document our huge installations Each equipment group was providing its own solution Locating the equipment Finding the corresponding documentation Accelerator Sector management agreement to start the project (BE,EN,TE) in June 2013 The GIS project was officially launched in September 2013 SITUATION AVANT les differentes db et manieres pas coordonnees, naviguation logitique de toute l’info depuis depuis GIS Situation apres Contexte motivation etc… 4 Fev 2016 Olivier Barrière - BE/CO

Olivier Barrière - BE/CO Outline Context Phase 1 - Data Integration Phase 2 - Validate & Maintain data Summary 4 Fev 2016 Olivier Barrière - BE/CO

Combine with already existing layout data Sync to Layout on demand GIS Data Process "Demande d’installation de cables" Equipment groups DB Layout DB EN/EL Cablothèque Gesmar TO BE DONE TO BE DONE CCDB Diamon TO BE DONE BE-CO BE-CO InforEAM GS/ASE Layout core tables NETWORK DB IT-CS Update LAYOUT_ID or create new rack Not yet automatic Combine with already existing layout data IT sockets in racks Sync to Layout on demand TE/CRG EN/CV GS/ASE … GIS DB GS/SE/DOP RACK IMPORTS Staging table Match GIS Shapes with Layout data using Labels & LAYOUT_ID Automatic since April 2014 Provide rack data to GIS GIS info Panel View Import API running daily or on demand 4 Fev 2016 Olivier Barrière - BE/CO

Results in Layout web interface Rack in the building hierarchy Link to MTF Rack list for each DB GIS integration Link to GIS 4 Fev 2016 Olivier Barrière - BE/CO

Results in CCDB & DIAMON Gain time Direct Rack link 4 Fev 2016 Olivier Barrière - BE/CO

Results in MTF / INFOR.EAM Common way to store equipment document Slot available for documentation 4 Fev 2016 Olivier Barrière - BE/CO

Results in GIS Portal Racks Links: MTF LAYOUT CCDB IT Network… Info Information available in one area Search By rack 4 Fev 2016 Olivier Barrière - BE/CO

Olivier Barrière - BE/CO CCDB Link CCDB Cable list by rack FEC’s list by rack Direct filtering 4 Fev 2016 Olivier Barrière - BE/CO

Results in GIS Portal Racks IT Socket Status: Free Assigned Portable …. Data sharing IT Socket list by rack done by IT First Line agrandir Zoom 1:10 4 Fev 2016 Olivier Barrière - BE/CO

Rack Inventory Situation PS Complex done Rack Inventory Situation 4 Fev 2016 Olivier Barrière - BE/CO

Olivier Barrière - BE/CO LHC tunnel done Racks Electrical panels FIP Boxes 4 Fev 2016 Olivier Barrière - BE/CO

LHC Surface nearly done 4 Fev 2016 Olivier Barrière - BE/CO

Olivier Barrière - BE/CO SPS started 4 Fev 2016 Olivier Barrière - BE/CO

Olivier Barrière - BE/CO Work completed In PS-SPS-LHC U&S: Around 250 building done => 50% Around 10000 racks done => 40% Around 3200 Electrical panels synchronised => 45% In LHC Tunnel: Around 4300 racks integrated => 100% Around 4000 Electrical panels integrated => 100% Around 4100 WORLDFIP Tap-Boxes integrated => 70% + % of completion + IT and why 4 Fev 2016 Olivier Barrière - BE/CO

Olivier Barrière - BE/CO Remaining work LHC Surface => 1 months SPS & SM18 => 2 months Meyrin, Prevessin site (EN & TE) => 5 months IT Star Points => 6 months (not planned initially, 900 Racks without name) PH experiments (Atlas & LHCb request) => 6 months 4 Fev 2016 Olivier Barrière - BE/CO

Olivier Barrière - BE/CO Outline Context Phase 1 - Data Integration Phase 2 - Validate & Maintain data Summary 4 Fev 2016 Olivier Barrière - BE/CO

Olivier Barrière - BE/CO Phase 2 Objectives Validate data imported Put in place process & tools => long term data maintenance 4 Fev 2016 Olivier Barrière - BE/CO

Validate data: LIU PSB Pilot (LHC Injector Upgrade) Check of equipment responsible done by LIU PSB Machine Coordinator (From BE-OP: K.Hanke & F.Chapuis) Names of racks to be changed In Infor EAM, Gesmar, MTF… 4 Fev 2016 Olivier Barrière - BE/CO

Validation of Imported Data Start with PS complex & SPS LHC is already up to date Follow LIU planning Proposal BE-OP & EN-MEF Machines coordinators validate the rack responsible with equipment groups EN-EL to validate rack names, if change of responsibility Under discussion BE-CO propagates changes in Arc-Map & Layout DB 4 Fev 2016 Olivier Barrière - BE/CO

Olivier Barrière - BE/CO Process to Maintain Data up to date At present there is no formal process to communicate changes concerning the racks Changes can go unnoticed and GIS data risks to become stale EN-EL is introducing new procedures DIR (Demande d’Installation d’un Rack) draft form DDR (Demande de Désaffectation d’un Rack) draft form https://edms.cern.ch/document/1391684/1 These procedures are still circulating in the EN/EL group (The acceptance and use of these procedures by equipment groups will come at a later stage) Proposal Include GIS Portal Racks in the ECR workflow Request BE-CO to provide specific tools to update racks data based on these ECR 4 Fev 2016 Olivier Barrière - BE/CO

to Correct Erroneous Data Proposal to Correct Erroneous Data GIS Portal link to report errors, to GIS Portal Rack support (done) EG have to decide if they want to maintain there self data 4 Fev 2016 Olivier Barrière - BE/CO

Olivier Barrière - BE/CO Outline Context Phase 1 - Data Integration Phase 2 - Validate & Maintain data Summary 4 Fev 2016 Olivier Barrière - BE/CO

Olivier Barrière - BE/CO Summary Phase 1 Data Integration Started September 2013 (20 months of actual work) PS Complex & LHC Underground, LHC Tunnel completed Green light from IEFC to continue 20mm of work remains to complete Phase 2 a) Data Validation Data in GIS needs to be validated Start now to benefit for LS2 with PS complex & SPS BE-OP & EN-MEF Machines Coordinators to validate data with equipment groups EN-EL to validate rack names BE-CO to update Arc-Map & Layout DB b) Formal process and tools to maintain data up to date New procedures are in progress with EN-EL for DIR, DDR Include GIS Portal racks in the ECR procedure workflow Request BE-CO to provide specific tools to update racks data 4 Fev 2016 Olivier Barrière - BE/CO

Olivier Barrière - BE/CO Demonstration https://gis.cern.ch/gisportal/Racks.htm 4 Fev 2016 Olivier Barrière - BE/CO