FIMCAR Project Description Proposal for Cooperation with GRSP IG FI

Slides:



Advertisements
Similar presentations
GEAR project Process Evaluation. Overview of GEAR Evaluation Components Outcomes Multi-component internal evaluation External evaluator: Prof. Carol Hagemann-White,
Advertisements

CIRAS PROJECT OVERVIEW
Injuries Reported in Frontal Impacts in Swedish Accident Data Presentation to GRSP Informal Group on Frontal Impact March 10, 2009 FI-4-3.
50th GRSP Session Status report of Informal Group on FI Pierre CASTAING Chairman Informal document GRSP (50th GRSP, December 2011, agenda item.
47th GRSP Session Status report of Informal Group on FI Pierre CASTAING Chairman FI
Capitalising the full potential of online-collaboration for SME innovation support Horizon 2020 call Innosup (Participant Portal code: H2020-INNOSUP )
Aims Develop a methodology to study the impacts of low consequences/high probability events Apply this methodology to the implications of a 5-6 metre.
FE06 New Guardrail Program. Definition FE06 is a program to fund new guardrail locations statewide. Sections for this program are maintained in a guardrail.
Head Restraint GTR Status to AC th Session of WP.29 March 2007 Informal document No. WP , March 2007, agenda item II
RTD/E.2/JL1 CARERA THE IMPACT OF CAP REFORM ON THE EMPLOYMENT LEVELS IN RURAL AREAS Kick off meeting CRETE; 16 – 17 March 2006 Martin Greimel Project Officer.
Forty-second session of GRSP December REGULATION No. 94 (Frontal collision) Proposal for draft amendments Proposal submitted by France Informal.
Reporting during the lifetime of the project Moldova – Research Horizon 30 January 2013 Kristin Kraav.
Technology Strategy Board Driving Innovation Participation in Framework Programme 7 Octavio Pernas, UK NCP for Health (Industry) 11 th April 2012.
UN/CS/RAI/USAA/DB01/ Development of a Strategic Plan for a Digital Archives Programme Common Services Working Group on Archives and Records.
Market Design of SE Europe: Reflections from the 3rd Forum on the Way Forward 6 th Permanent High Level Group Meeting Athens, 07 December 2003.
Regulatory requirements in the current programming period Funchal, 18 November 2010.
“Thematic Priority 3” Draft Evaluation of IP + NoE.
44th GRSP Session Status report of Informal Group on CRS Pierre CASTAING Chairman Informal Document No. GRSP (44th session, December 2008,
European Commission DG Enterprise VIRTUAL ENVIRONMENT FOR INNOVATION MANAGEMENT TECHNIQUES VERITE Kick-off meeting Thessaloniki November 2001.
State of implementation of the decision III/6f regarding Ukraine (MOP 2, June, , 2008, Riga, Latvia)
PROJECT LIFECYCLE.
44th GRSP Session Status report of Informal Group on FI Pierre CASTAING Chairman Informal Document No. GRSP (44th session, December 2008, agenda.
Analysis of Bilateral Relations between Czech institutions and the institutions from donor states Martina Bečvářová BF Working Group – 9th September 2015,
IHRA Side Impact Working Group Status Report GRSP, December 2002
Application procedure From theory to practice Dieter H. Henzler, Steinbeis-Transfercenter Cultural Resources Management, Berlin.
Netherlands’ presentation for Informal Group on Frontal Impact of GRSP 6 Oct UNECE Reg.94 - Past, Present & Future Presentation by the expert from.
EO Dataset Preservation Workflow Data Stewardship Interest Group WGISS-37 Meeting Cocoa Beach (Florida-US) - April 14-18, 2014.
This research has received funding from the European Community’s Seventh Framework Programme (FP7/ ) under grant agreement No WP3 update.
51 st GRSP Session Status report of Informal Group on FI Pierre CASTAING Chairman Informal document GRSP (51 st GRSP, May 2012, agenda item.
September 2005 DEA: First National Workshop 1 Development and Energy in Africa First National Workshop: Tanzania 12 September 2005 Introduction Gordon.
1 © NKS MST 2012 FP7 Info-Day 2012, September 18, Stuttgart Project Title Coordinator or Presenting Organisation Contact Details.
EECV WG20, Progress, December 2003 EEVC WG20 Rear Impact test procedure(s) and the mitigation of neck injury Progress, December 2003 Informal document.
Water Bodies in Europe: Integrated Systems to assess Ecological Status and Recovery Funded under FP7, Theme 6: Environment (including Climate Change) Contract.
Special Meeting on Procedures for Information Exchange November 7, 2007 Geneva Session 1 Anne Meininger United States USA WTO TBT Enquiry Point.
WORKING GROUP 18 Jean-Yves LE COZ Chairman CHILD OCCUPANT SAFETY Informal document No. GRSP
An Egg-citing Crash. Objectives of Lesson Automotive safety features that help to save lives. What Crumple Zones are and how they help us. The physics.
Task 9:Fusion Power Plant Studies Status & Planned Activities
CRITICAL INFRASTRUCTURE RISK ASSESSMENT SUPPORT CIRAS PROJECT OVERVIEW 2nd Stakeholders’ Workshop Aschaffenburg, November, 26th, 2015 Jaime Martín, Project.
A project funded by the European UnionImplemented by a consortium led by Get ready for the call! Next steps for building partnerships and developing a.
Quality Assurance MENTEP Yves Beernaert, Educonsult
2016 Mill and Overlay Project
EC project periodic and continuous reporting
Development and Energy in Africa
FIMCAR Global Strategy
CHILD OCCUPANT SAFETY WORKING GROUP 18 Jean-Yves LE COZ Chairman
Helene Skikos DG Education and Culture
Insert Project Title.
Eurostat D2 – Regional Indicators and Geographical Information
AUTOMOBILE PARTS.
Insert Project Title.
Micro data linking – call for proposal item 12 of the agenda
Status report GRSP IWG FI
Advices to project developers
P-REACT Project Overview
52nd GRSP, 11 – 14 Decemer 2012, agenda item 14
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
Harmonization of Crash Regulations in Korea
SOCIAL DIALOGUE WITHIN EUPAN
Association of European Border Regions
Helene Skikos DG Education and Culture
Definition of Project and Project Cycle
HERITAGE PLUS – Management Group Meeting
Work progress regarding Self-Protection
Structural Funds: Investing in Roma
(Task 43 of the IWG Task List)
Submitted by the expert
52nd GRSP Session Status report of Informal Group on FI
eContentplus 2007 Work Programme
Insert TITLE Insert SUBTITLE.
The communication system for England & Wales
Presentation transcript:

FIMCAR Project Description Proposal for Cooperation with GRSP IG FI

FIMCAR Project general 2nd Call FP7 (grant agreement no.: 234216) Coordinator: TU Berlin (Heiko Johannsen) 18 Beneficiaries Budget: 6 Mio Euro / Funding: 3.8 Mio Euro Main aim: Proposal for frontal impact compatibility assessment approach Frontal Impact Compatibility Assessment is expected to consist of an off-set and a full frontal test (of which one could be an MDB test) April 27th 2010 Heiko Johannsen

FIMCAR Project consortium April 27th 2010 Heiko Johannsen

FIMCAR Project What is compatibility? Compatibility consists of self and partner protection. Improved compatibility will decrease the injury risks for occupants in single and multiple vehicle accidents. Compatible vehicles will deform in a stable manner allowing the deformation zones to be exploited even when different vehicle sizes and masses are involved April 27th 2010 Heiko Johannsen

FIMCAR Project What compatibility needs to address Structural interaction (self and partner protection) Compartment strength (self protection) Front end force / deformation characteristics force level (partner protection) deceleration pulse and restraint system (self protection) April 27th 2010 Heiko Johannsen

FIMCAR Project Structure April 27th 2010 Heiko Johannsen

FIMCAR Project Schedule April 27th 2010 Heiko Johannsen

FIMCAR Project Most important Deliverables Report detailing the analysis of national accident databases (scheduled March 2011 but likely available earlier) Test and assessment protocols for off-set, full frontal and MDB (draft scheduled for September 2010, final March 2012) April 27th 2010 Heiko Johannsen

Common Work Areas as defined by IG FI Test severity off-set test procedure Define and motivate test metric (implicit definition of test severity (delta-v, EES, test speed, …) (FIMCAR (September 2010)) Level of test severity in off-set tests (FIMCAR (September 2010)) April 27th 2010 Heiko Johannsen

Common Work Areas as defined by IG FI Introduction of Full Width test in frontal impact Frontal structure architecture assessment (FIMCAR (September 2010)) Define and motivate test metric (implicit definition of test severity (delta-v, EES, test speed, …) (FIMCAR (September 2010)) Level of test severity in full width tests (FIMCAR (September 2010)) April 27th 2010 Heiko Johannsen

Common Work Areas as defined by IG FI Geometric requirements Define interaction area (FIMCAR information to make decisions but no final proposal (September 2010)) April 27th 2010 Heiko Johannsen

FIMCAR expectations from cooperation with GRSP IG FI Early input from external parties Regulatory bodies Other regions of the world Etc. April 27th 2010 Heiko Johannsen

Dissemination work shop plans Spring/Summer 2011 Autumn 2012 April 27th 2010 Heiko Johannsen

Contact Heiko Johannsen TU Berlin +49 30 31 47 29 88 Heiko.Johannsen@TU-Berlin.de www.fimcar.eu (not yet online) April 27th 2010 Heiko Johannsen