PCAL Cosmic Ray Tests Progress Report C. Smith μ U V W MODULE 2

Slides:



Advertisements
Similar presentations
Double Chooz: Outer Veto
Advertisements

1 TOF Aging Issues Pre-history Operating history Observations related to gain loss Impact on timing resolution Possible courses of action April 6, 2006.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
1 Scintillating Fibre Cosmic Ray Test Results Malcolm Ellis Imperial College London Monday 29 th March 2004.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 3, 2007.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting July 18, 2007.
The Design of MINER  A Howard Budd University of Rochester August, 2004.
Andrea Giammanco CMS Tracker Week April DS ROD Prototype: “final” optohybrids “final” CCUM integrated in the rod with new FEC_to_CCUM adapter (Guido.
Cosmic Ray Test Stand with Scintillating Cells for Digital Hadron Calorimeter As of 9am 05/28/2003.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Apr, 16, 2008.
Status of CLAS12 PCAL project
CLAS12 Pre-shower S. Stepanyan (JLAB) Collaborating institutions: YerPhI, JMU, OU, NSU, W&M, Orsay-IPN, JLAB Project overview CLAS12 TWG meeting, February.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
Coincidence analysis in ANTARES: Potassium-40 and muons  Brief overview of ANTARES experiment  Potassium-40 calibration technique  Adjacent floor coincidences.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
Electromagnetic Calorimeter for the CLAS12 Forward Detector S. Stepanyan (JLAB) Collaborating institutions: Yerevan Physics Institute (Armenia) James Madison.
1 Energy loss correction for a crystal calorimeter He Miao Institute of High Energy Physics Beijing, P.R.China.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
All DØ Meeting, 12/01/00 Central Fiber Tracker Light Guide Performance Thomas Nunnemann Fermilab 90 days before RunII … (a.k.a. 12/01/00)
MPPC status M.Taguchi(kyoto) T2K ND /7/7.
CLAS12 forward detector: Pre-shower S. Stepanyan (JLAB) Collaborating institutions: YerPhI, JMU, OU, NSU, Orsay-IPN Concept, R&D, PED … CLAS12 Detector.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
DESY BT analysis - MPPC Saturation Correction - S. Uozumi Feb Sci-ECAL meeting 1.MPPC Gain Measurement (with LED data) 2.Inter-calibration of readout.
Forward Carriage Commissioning CLAS Collaboration Meeting 6/19/2015CLAS12 CalCom Status Update1 ECAL PCAL FTOF Panel 1A FTOF Panel 1B Detector Status PMT.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
D. Bertrand, J. De Bruyne, P. De Harenne, L. Etienne, S. Hannaert, G. Van Beek The Arch.
Muons at CalDet Introduction Track Finder Package ADC Corrections Drift Points Path Length Attenuation Strip-to-Strip Calibration Scintillator Response.
CLAS12 Pre-shower H. Voskanyan (YerPhI)  R&D: Test measurements  Prototype CLAS Collaboration, CLAS12 TWG Meeting February 28, 2007, JLAB.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
A Brand new neutrino detector 「 SciBar 」 (2) Y. Takubo (Osaka) - Readout Electronics - Introduction Readout electronics Cosmic ray trigger modules Conclusion.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
A. Tsirigotis Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Reconstruction, Background Rejection Tools.
E. Picatoste, D. Gascon PMT afterpulsing and SPD trigger 1 Looking to the problem from the instrumentation point of view LHCb Calorimeter Meeting – CERN.
Scintillator and Fiber Test Measurements with Gluing Clas12 upgrade pcal user group May 13, 2009 Clas12 upgrade pcal user group May 13, 2009 Dustin Keller.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
EC Software Suite 1 EcMon: Monitors raw, calibrated and reconstructed data in real-time with detector map navigation, strip- charts, histograms. Single-event,
Simulation and reconstruction of CLAS12 Electromagnetic Calorimeter in GSIM12 S. Stepanyan (JLAB), N. Dashyan (YerPhI) CLAS12 Detector workshop, February.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
 13 Readout Electronics A First Look 28-Jan-2004.
Forward Tagger Calorimeter Prototype tests at Jlab: report CLAS12 Workshop February 22, 2012 A. Celentano.
Feb C.Smith UVA EC energy calibration – g13 pass0 For pass0 data were cooked with CALDB calibration constants reset to nominal 10 channels / MeV.
OD Tuning: SK-IV Roger Wendell TMC Meeting
The dynamic range extension system for the LHAASO-WCDA experiment
Results with the RPC system of OPERA and perspectives
Fabio, Francesco, Francesco and Nicola INFN and University Bari
Commissioning of the Crystal evaluation setup
GLAST LAT tracker signal simulation and trigger timing study
CLAS12 software workshop
Panagiotis Kokkas Univ. of Ioannina
LHAASO-WCDA: Design & Performance
CMS Preshower: Startup procedures: Reconstruction & calibration
FORWARD CARRIAGE UPDATE – March-July 2015
A First Look J. Pilcher 12-Mar-2004
CLAS12 Forward Detector Element PCAL
Slice Test: Preliminary Data Analysis The Ohio State University
Status of the TOF Detector
Chris Smith California Institute of Technology EPS Conference 2003
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
Commissioning of the ALICE-PHOS trigger
SOS Cerenkov Purpose: provide PID for NA Cerenkov efficiency studies
Timing Counter analysis
Resistive Plate Chambers performance with Cosmic Rays
BESIII TOF Digitization
Trigger operation during 2007 run
Presentation transcript:

PCAL Cosmic Ray Tests Progress Report C. Smith μ U V W MODULE 2 Gegham Asyran (YerPhI) Sergey Boyarinov (JLAB) Shloka Chandavar (Ohio U) Nerses Gevorgyan (YerPhI) Yeranuhi Ghandilyan (YerPhI) Ken Hicks (Ohio U) Sergey Pozdnyakov (JLAB) Ani Simonyan (YerPhI) Stepan Stepanyan (JLAB) Hakob Voskanyan (YerPhI) μ U V W MODULE 2 http://clasweb.jlab.org/wiki/index.php/PCAL_Cosmic_Ray_Tests

Review of Module 1 Feb 12 – Mar 16: 141 runs , ~4 GB ntuples. Shakedown of electronics and trigger. Replaced all three 1881 ADCs (dead chans.). Replaced four V895 discriminators (dead chans., DC offsets). All signal and HV cables (576 total) work. Replaced 1 patch cable out of 384. Replaced 3 PMTs due to 60 Hz noise/instability. 80% of data taken with improperly timed ADC gate. Evaluated gain matching methods. Measured light attenuation in scintillating fibers. Preliminary estimate of light yield.

Gain Matching Vertical MIP muon deposits ~10 MeV in 5 scintillator stack. Measured light depends on x due to fiber attenuation. μ x For each PMT, measure light as function of x, then extrapolate to x=0 to get PMT gain.

Gain Matching μ x For each PMT, measure light as function of x, then extrapolate to x=0 to get PMT gain. To determine x, use strips in other views to localize hit.

Gain Matching μ U66 x W PMTS Non-vertical tracks dominate trigger For each PMT, measure light as function of x, then extrapolate to x=0 to get PMT gain. To determine x, use strips in other views to localize hit.

Gain Matching μ U66 x W PMTS Only 1 U strip fired For each PMT, measure light as function of x, then extrapolate to x=0 to get PMT gain. To determine x, use strips in other views to localize hit. To reject non-vertical hits, use adjacent strips to veto.

Gain Matching μ U66 x W PMTS Only 1 W strip fired For each PMT, measure light as function of x, then extrapolate to x=0 to get PMT gain. To determine x, use strips in other views to localize hit. To reject non-vertical hits, use adjacent strips to veto.

Gain Matching μ W59 U66 W35 x W15 Only 1 W strip fired Only 1 U strip fired Efficiency ~5% For each PMT, measure light as function of x, then extrapolate to x=0 to get PMT gain. To determine x, use strips in other views to localize hit. To reject non-vertical hits, use adjacent strips to veto. In practice use Level 3 filter to limit multiplicity to 1 for each U,V,W view. Fit gaussian to each x slice to determine MIP peak.

Typical MIP distributions for U PMTs (W59 slice) Vertical red line is ADC channel 200. Calibration 20 ch./MeV

Initial result – non-exponential attenuation Does not agree with bench measurements.

Solution ADC gate width too narrow Increased to from 100 to 150 ns to accommodate long tails. ADC gate timing late. Gate timing determined by earliest PMT - complicated function of geometry in PCAL. Simplified trigger to remove 30 ns of delay. Trigger is now OR of W PMTs only. Still use Level 3 filter to select events with only 1 hit per U,V,W side.

After ADC gate adjustment

Mean ADC response vs position Some periodic behavior in spatial response noted

Periodic behavior in ADC repsonse 1 2 1 3 For example, differences in light collection for muons passing between fiber bundles (2) or on the outside (1) may be detected. Or between scintillators (2) vs (3) for double readout strips. Due to different number of U,V,W strips (68,62,62) there is a 68-62=5 channel modulation in the overlap of pixels and strips (beat frequency). This creates small sampling regions which may detect different efficiencies of light collection.

Periodic behavior in ADC repsonse 1 2 1 3 For example, differences in light collection for muons passing between fiber bundles (2) or on the outside (1) may be detected. Or between scintillators (2) vs (3) for double readout strips. Due to different number of U,V,W strips (68,62,62) there is a 68-62=5 channel modulation in the overlap of pixels and strips (beat frequency). This creates small sampling regions which may detect different efficiencies of light collection.

Summary of HVs used to gain match PMTs If intrinsic gain of PMTs were known, this might tell us something about light yield.

Estimate of absolute light yield Preliminary estimate of light yield from Run 4057. HV on PMT U66 was increased from 832V to 1000V to allow single photoelectron region to appear in ADC. Sparcification threshold on this channel was lowered from 15 to 2 channels. What appears to be the s.p.e. peak is seen channels 7-8, while the MIP from muons shifted from channel 200 to ~ channel 850. The MIP peak represents a deposited energy of 10 MeV (5 strips/stack, dE/dx ~ 2 MeV/cm)

Modules 1 vs. 2 – Mean ADC vs position

Module 2 – Gain stability over 5 days

Module 2 – Gain stability over 5 days

Goals for Module 2 Multi-hit TDC data. Adjacent strip x-talk, timing resolution. Light coupling stability (wiggle phototube housings, re-measure gain). How to measure light yield for all channels? Next major challenge is setting up CLAS12 DAQ, testing flash ADC energy sum firmware, cluster finding, lookup table for attenuation corrections, etc. (Module 4?).