Canton Crossing Tower Baltimore, Maryland

Slides:



Advertisements
Similar presentations
Austin, Texas 2013 CEFPI Southern Region Conference.
Advertisements

ODOT Structure Project Manager Training
Backgroun d Redesign Analysis Office Airside CUP Analysis CHP Analysis Power Distributio n Outline Constructio n Impact Conclusion Backgr ound Jim Gawthrop.
Url: www. shahbuilwell.com Phone: ,
SAVE OUR CITY: COMMUNITY DEVELOPMENT Commercial Revitalization.
Presentation to Johannesburg Business Forum 08 August 2008 Presentation.
The following visuals were only a small part of the entire presentation and are not for distribution.
Why We Need It?  Lack of Space  Need to Meet Code Requirements  Inadequate Communications & Technology  Facility Maintenance Issues.
Building Strong! IHNC SURGE BARRIER GIWW MRGO. Building Strong! Trestle Construction About 2000’ of trestle allows precision installation of piles and.
Lehigh Valley Hospital – Cedar Crest Campus Presented by: Derek Snover Sponsored by: Allentown, PennsylvaniaJune December , 000 sq ft ExpansionTotal.
Vineland Commercial Site Address: 7626 N. Vineland Ave. (A.P.N ) 7634 N. Vineland Ave. (A.P.N ) 7630 N. Vineland Ave. (A.P.N )
 Project Delivery  Design Considerations  Lessons Learned.
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
West Virginia University Alumni Center Gregory Smithmyer | Mechanical Option | Penn State University | April 15, 2009 | Advisor: Dr. Srebric.
Unit 1 Types of Construction
Coppin State University Physical Education Complex Kaylee Damico – Mechanical Option April 12 th, 2011 Presentation Outline Project Team Project Overview.
Austin Neighborhood Council Civil & Family Courthouse April 22,
Green Building Design - Gold LEED Award TOYOTA Corporate Real Estate & Facilities Torrance, CA Project Team Owner: Toyota Motor Sales Construction Manager.
A Business Case for Multi-Tenanted Office Buildings Creating a Win for Owners, Managers and Tenants BOMA: Achieving High Performance Through Innovation.
Credential Presentation Fenesta Building Systems.
Managing Your Grant Roberta Teliska Vice President for Sponsored Programs Operations The Research Foundation of SUNY October 6, 2008.
Building space for the Knowledge and Creative Economy: how different is it? Mark Kleinman Director - Economic and Business Policy Greater London Authority.
Crawford W. Long Middle School Atlanta New Construction/Additions Award Type Perkins+Will 2008 Exhibition of School Planning and Architecture.
East Ridge Middle School Clermont, Florida New Construction Project Project of Distinction SchenkelShultz Architecture 2008 Exhibition of School Planning.
City Land Based Customized Incentive Proposal City Centrum Economic Development Office City of Cape Coral, Florida March 21, 2011.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
TYPICAL member spot checks & alternate systems design study
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Charles Miller Construction Option Spring Dr. Riley WestEnd25.
Mobile Health Provider Program Veterans Health Administration VA Office of Information and Technology 2015.
Duquesne University Forbes Expansion
BCM 210 Foundation Issues- Fall 2000 refer to Allen Text
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
New Middle School Geneva, Il Greg Kemerer AE Senior Thesis 2006 – CM Option.
Brad Oliver – Structural Option Advisor – Professor Memari.
Paula M. Carmody People’s Counsel Maryland Office of People’s Counsel.
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Initial – Westside Community Conference Center Initial – Westside Community Conference Center 108 th & Grover, south of Center St.
About Morgan Sindall Morgan Sindall is a leading UK construction and regeneration group operating through five divisions of construction and infrastructure,
CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option.
The Construction Process TimeCost Linked Schedules Linked Estimating Recipes The Building Model: 5D Concept.
Andrew Diehl, EIT The Pennsylvania State University Architectural Engineering Department Structural Option 5 th Year Senior Thesis Project.
World Trade Centre Collapse Group 2. Introduction History Design Failure What was learnt/future prevention.
2014 Industry Snapshot. Thank You! To the 35 organizations who completed the survey.
Creating or Enhancing Skills-Based Training Programs:
Introduction to Mechanical Engineering
Pearl Condominiums Philadelphia, PA
MiAPPA Winter 2005.
Creating or Enhancing Skills-Based Training Programs:
David Anderson Mechanical Option
Converse Play Reference Converse Play Reference
FRESNO COUNTY WEST ANNEX JAIL
Building Name. Health Sciences Facility III Building Location
Paca House Veterans Supportive Housing 116 N. Paca House Baltimore, MD
Microsoft Go-To-Market Services SUCCESS STORY
ArcelorMittal: Transforming Sales and Operations Planning with SAP® Integrated Business Planning ArcelorMittal is a global leader in integrated steel.
محمد امین طلایی – پویا نوذری
The Bond Street Wharf Baltimore, Maryland
the Franklin Square Hospital Center
Community Update Project Overview Maximizing Benefits
Justin Pennycoff AE Senior Thesis 2008 Construction Management
Lehigh Valley Heritage Center
Architectural Engineering, The Pennsylvania State University
Cornwall Warehousing Ltd
Mitre III Building McLean VA Debra Schroeder Structural Option.
Maryland Offshore Windfarm Project
The Calvert Hall High School College Project
Michigan Energy Summit | April 25, 2019
5.07_Edaphic Mechanics & Substructure - Types of foundation
Presentation transcript:

Canton Crossing Tower Baltimore, Maryland 17-story (520,000 sq ft) Tenant fit out office building Located directly South of Baltimore City, in Canton

Existing Site Conditions

Site Plan with Site Logistics

Foundation Proposal Designed Foundation Proposed Foundation Precast concrete piles with cast-in-place pile caps Proposed Foundation Cast-in-place caissons

Reasons for Foundation Proposal Central Plant success Pile Driving Issues Delivery Issues and Barge Accident Cost comparison, taking into consideration all of constructability issues

Independent System Proposal Currently the tower’s equipment is housed in a $8.7 million Central Plant located across the street Boilers, Chillers, Transformers, etc. Would it be possible for the tower to be independent? What are the cost comparisons? Does it fit in with the teams Planned Unit Development?

LEED Guide for Developers Developer of the Canton Crossing Campus did not consider the campus for LEED rating I feel it was due to inadequate knowledge of the LEED system An online guide will be created to help developers understand the benefits of the LEED system with respect to their interests