Beam Wire Scanner for PSB

Slides:



Advertisements
Similar presentations
J.P. Langston Brake Retrofit
Advertisements

K. Long, 14 June, 2015  Target K. Long, Friday, 24 th April 2009.
SPS New Wire Scanner Mechanics Review
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
Liquid-cooled Heavy-duty Coreless Motors
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes twist, under vacuum, as jaws turn, with R~1 m.
Beam Wire Scanner for PS/SPS/PSB Update on Motor Supplier Investigations Dmitry Gudkov BE-BI-ML.
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Installation and vacuum conditioning, 12 th and 13 th September 2005 L. Schulz.
Beam Wire Scanner for PS/SPS/PSB Update on Beam Wire Scanner Test Results Dmitry Gudkov BE-BI-ML 21-August-2015.
Dmitry Gudkov BE/RF/PM CLIC Module Working Group PROTOTYPE TWO-BEAM MODULES (CLEX) Supporting and positioning system for CLEX modules main conclusions.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Three-phase Cage Rotor Induction Motors Resource 2 Three-Phase AC machines.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
BWSRE, B.Dehning 1 Bernd Dehning CERN BE-BI
Compressor status AWAKE Technical Board meeting 19 August 2015.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
TM0 components inventory and procurement schedule In LAB testing facility A. Bartalesi.
NEW FAST WIRE SCANNER Manufacturing review Emilien Rigutto
1 Lower Brg Detail Inner cap Bearing Lock Washer 8 = Insulating Tube/ sleeve (slide 6_ * Outer Cap Steel Spacer (slide 4,5) Insulating Spacer (Slide 4,5)
Beam Wire Scanner for PS/SPS/PSB Update on Motor Supplier Investigations - 2 Dmitry Gudkov BE-BI-ML 24-July-2015.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
1 Assembly and installation of TM0 in the Lab Assembly and installation of TM0 in the Lab F. Rossi September.
Beam Wire Scanner for PSB -Update Dmitry Gudkov BE-BI-ML 06-November-2015.
Beam Wire Scanner for PSB -Update Dmitry Gudkov BE-BI-ML 26-November-2015.
Vacuum chamber fabrication Dates refer to end of fabrication, then 8 weeks are to be added for NEG coating, bake-out, acceptance tests, etc. EN-MME LNR.
Beam Wire Scanner for PS/SPS/PSB Mechanical 3D Model Review (for BE/RF-ABP Impedance meeting 02.Nov.2015) Dmitry Gudkov Mechanical Engineer BE/BI-ML.
Field Period Assembly Wayne Reiersen SC Project Review PPPL May 2006.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Beam Wire Scanner for PS/SPS/PSB Current status and Schedule Dmitry Gudkov BE-BI-ML.
New Fast Wire Scanner for Booster Mechanical Design review 2016_01_ /01/19 1 On behalf of: - EN/MME: Alain Demougeot, Nicolas Chritin - BE/BI: Dmitry.
THE NEW FAST WIRE SCANNER DESIGN FOR THE PSB
Beam Wire Scanner for PS/SPS/PSB Motor Selection Dmitry Gudkov BE-BI-ML.
TCDI Project Budget Update François-Xavier Nuiry May 10 th 2015 EN-STI-TCD.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
CERN – ENGINEERING DEPARTMENT: A. Dallocchio on behalf of EN-MME
BWS Design meeting Jose Luis Sirvent PhD. Student XX/03/2014
LIU Wire Scanner Project
Power and control electronics for the new fast wire scanners
Brief Status SPS Prototype PSB Prototype Installed in LS1
Wire Scanner / A.Demougeot
LIU Wire Scanner Milestones June 2017
LEP cryostat Procurement strategy and plans
Complementary ISTC Projects #3888, 3889p
Working plan for 2017 Acquisition and Control Electronics
Fast Wire Scanner Prototype Mechanical Design
ERMC/RMM activities May 2017
Teleconference ACS – FREIA 10th May 2017
Wire Scanner Mechanics
Status of the BI Work Package in the LIU-PSB frame
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
Diffuser status October 2017
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
Far Detector Activities Late 2017 – Early 2018
Update on development of consolidated insulation system and procedures C. Scheuerlein, 4th DISMAC meeting,
LIU Wire Scanner Series Costs
TM0s and TM1 components inventory and procurement schedule
Beam Wire Scanners (PS prototype and LIU series)
PROTOTYPE CENTRIFUGAL FUEL CELL
EXCELSIOR INDUSTRIES (An ISO 9001:2008 Certified Company)
LARP Rotatable Collimators for LHC Phase II Collimation
Ch. Boccard, M. Krupa, G. Schneider, R. Veness, M. Wendt
Ferrites in BE-BI Preliminary Data
LIU-SPS review for BI (no BWS)
East Hall under construction
Status of the BI Work Package in the LIU-PSB frame
Presentation transcript:

Beam Wire Scanner for PSB Update Dmitry Gudkov BE-BI-ML 21-April-2016

Contents Motors (Status by 21-Apr-2015) Production Status (BI-ML, EN-MME) Conclusions and questions

Status of motors Optical Disk First prototype tests are under way (standard rotor, stator 600V). Do we have any test results? Vacuum compatible rotor validation: High outgassing of the rotor received from Alxion; Cleaning done – no change; Bake-out 48h, 235 °C – outgassing is ok, report preparation is under way; PM sample received from Alxion for validation; Cleaning is planned, if high outgassing – bake-out. Three motors (vacuum compatible rotor, stator 300V) order: DAI 6363752, under approval in purchasing. Optical Disk 2 samples have been produced: 1 by LASERTEC (NL), arrived at CERN, 1 by Dundee University (on it’s way) MME-MA (Pierre Naisson) is in charge of production of 3 full-size optical disks for beam wire scanners: raw material will be received by end of April; diamond tool has been purchased (machining of optical track); production of three disks by end of May.

Responsible Group/Section STEPPED VACUUM CHAMBER ASSEMBLY Production Status Parts or subassemblies being produced in main workshop or subcontracted (EN-MME) Definition Nomenclature Quantity Responsible Group/Section Supplier Status INNER SHOULDERED HUB PSBBWSRA0013 3 MME-FS MIKROMEKANIKK  In production STEPPED VACUUM CHAMBER ASSEMBLY PSBBWSRA0025 CERN WORKSHOP Preparation done SHAFT PSBBWSRA0010 NUT FOR OPTICAL DISC PSBBWSRA0023 SPECIAL NUT PSBBWSRA0019 BEARINGS SPECIAL NUT PSBBWSRA0020 BACK SUPPORT PSBBWSRA0012 SHAFT END PSBBWSRA0011 PSBBWSRA0003 THIN NUT 0.5d M16X1 PSBBWSRA0040 RING Ø20.2/Ø28/4.8mm PSBBWSRA0015 BLOCKING WASHER PSBBWSRA0024 WASHER PSBBWSRA0021 FEEDTROUGH COVER PSBBWSRA0018 WASHER SHIM FOR BEARINGS PSBBWSRA0022 SPECIAL TAB WASHER PSBBWSRA0032 OPTICAL DISC PROTECTION PSBBWSRA0014 DN16 HALF-RING WITH THREADED HOLE PSBBWSRA0031 MODIFIED ROTATABLE RING DN16 PSBBWSRA0002 BEARING EXTERNAL RING PSBBWSRA0004 resolver stopper PSBBWSRA0016 Break rotor PSBBWSRA0017 BRAKE STATOR RING PSBBWSRA0037 MAIN VACUUM TANK PSBBWSRA0006 2 TARGETS SUPPORT PSBBWSRA0030 1 According to Emilien the cost (3 kinematic units + 2 vacuum tanks) ~ 75 kCHF

Responsible Group/Section Responsible Group/Section Production Status Parts or subassemblies being produced or subcontracted (BI-ML) Definition Nomenclature Quantity Responsible Group/Section Supplier Status FORK D L150 MM PSBBWSRA0044 10 BI-ML Price inquiry To be ordered FORK BACK HALF CLAMP PSBBWSRA0047 6 Insulator Sleeve PSBBWSRA0045 Sleeve PSBBWSRA0046 BRAKE MAGNET MR28.5xr25.2xh18xA81.5 HKCM ENGINEERING E.K BEARING Ø37/Ø25-7 6805 BEARING Ø65-Ø50-7 61810 Commercial parts (not including fasteners) Definition Nomenclature Quantity Responsible Group/Section Supplier Status FIBER ADAPTER SM05FCA 12 BI-BL THORLABS To be ordered ADJUSTABLE FOCUS TUBE PSBBWSRA0034 15 BI-ML NUT SM05RR-UNADONIZED-SP 50 LENSES 24 ASPHERICON MOTOR STATOR 145STK2M022 3 ALXION MOTOR ROTOR DN16 VIEWPORT VPCF16DUVQ-L VACOM VENTED WASHER 125AVTAQ0040000 100 JEVEKA VIEWPORT DN100 VPCF100B-L + fasteners

Beam Wire Scanner Prototype for PSB. Schedule

Conclusions and questions + AOB MME (Nicolas) was asked to start working on the design of vacuum tanks for PS and SPS version of BWS. We need BC. Supporting structure for installation in PSB has been ordered. Supporting plate design and installation tooling design is nearly finished, production will be planned soon. It is planned to build a mock-up to train before the installation in the PSB.