Wed 23.05.12 08:55 Fill 2653 stable beams 1.40e11 ppb, 5.6 1033 cm-2s-1peak lumi, 11.6 pb-1 total lumi delivered. 09:31 Dumped by collimator interlock:

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Wednesday September 14th
LHC Morning Meeting - G. Arduini
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Summary of Week 11: 14 – 21 March
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Wed :40 Lost S78 - QPS controller.
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Mike Lamont, Jorg Wenninger
Wednesday 8th August & night
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Sunday morning Recovering from 400 kV disturbance.
Chromaticity can make a difference…
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Friday Morning 7:30 injection for fill 2908
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
(on behalf of the LHC team)
Thursday morning 7:20 – 12:30 faults of BLM sanity check, RQX.L8 QPS trip and iris scanner in UJ47. Access: Pt 8 for ELQA on RQX.L8 (The voltage.
Tuesday Access for RF & QPS (others in the shadow) until ~18:00.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
LHC Morning Meeting - G. Arduini
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Thursday 22 September 2011.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Friday morning 08:00 Stable beams with 840b.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Summary Tuesday h23: Machine closed. Precycle started.
Tuesday In the morning test cycle with probe for Q’ measurement.
Fri :52 Stable beams fill #2536
Coordination: Eva Barbara Holzer, Mike Lamont
Wednesday h18: 228b fill lost just before start of ramp.
LHC Morning Meeting - G. Arduini
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Another Immortal Fill….
Monday 27th August & night
Wednesday 26 October 2011.
Wednesday morning / afternoon
Saturday 15th May One bunch 1 e11 per beam 09:57: start ramp
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Wednesday Following the struggle with the vacuum in IR2 over the night, drop intensity to 1.2E11/bunch. Fill first B1 – pretty quiet – then B2 – quite.
Tuesday
Presentation transcript:

Wed 23.05.12 08:55 Fill 2653 stable beams 1.40e11 ppb, 5.6 1033 cm-2s-1peak lumi, 11.6 pb-1 total lumi delivered. 09:31 Dumped by collimator interlock: TCDD (injection movable mask/collimator) for beam 1. 10:55 Access for replacement of power supply for PXI rack. 11:41 Access finished. Recovering TCDD and TDI positions for beam 1. In shadow: QPS board swap on RQTL11.L5B1 and RCD.A45B1. 13:02 Injection. Steering TI2 and TI8, 14:05 problems with BPM interlocks from LSS4 and LSS6. PS and SPS need to readjust the beam. 14:15 TOTEM interlock for injection: intermittent fault. Experts checked but not understood. Seems to be on BIC side: CIBF (CIBU fiber). Take out TOTEM interlock? To be discussed with MPP. 24-05-2012 LHC morning report

B2 Intensity Loss at Start of Stable Beams Tune feedback locked on wrong peak  Q2h too low  slow emittance blow-up of all bunches  losses and reduced lifetime. Stopped by manual tune change. 24-05-2012 LHC morning report

Adjusting Tune B2 H Lifetime B1 Lifetime B2 DQh = + 0.001 24-05-2012 LHC morning report

Bunch by Bunch Beam Loss Q2h adjustment 24-05-2012 LHC morning report

Effect on Vacuum (LSS7R) Q2h adjustment 24-05-2012 LHC morning report

Wed/Thu 23/24.05.12 17:36 Injecting slightly higher bunch intensities: 1.47e11 average. Emittance from SPS: ~1.8 micron (on 12 b). 18:41 Stable beams. At start of collisions: Some bunches with losses. Some instability observed: B2H. Lower beam 2 lifetime. B2H not trimmed up this time. Stable after being in collision. Peak lumi: 5.6e33. Higher bunch intensities did not result in higher luminosity  emittance blow-up!? 00:41 Dumped by interlocked BPM in IR6 The 3 bunches in ring 2 that collide only in 8 lost intensity at about 23:20, 23:50 and 00:25. Note that the losses go in steps and seem to synchronize at time. Bunches were at around 6e10 ppb at the time of the dump. 24-05-2012 LHC morning report

2/3 Design Intensity (130 MJ) 24-05-2012 LHC morning report

Bunch by bunch losses Collision Start collision process 24-05-2012 LHC morning report

Very Modest (No?) Increase in Peak Luminosity 24-05-2012 LHC morning report

Excitation Seen on B2H G. Arduini 24-05-2012 LHC morning report

Bunch by Bunch Intensity @ Dump Time 24-05-2012 LHC morning report

Thu 24.05.12 01:22 Problems with TCL.5R1.B1 (recurrent issue). A. Masi disabled the resolver check on lost steps. To be followed… 02:11 Injection. 03:53 Stable beams. Peak lumi: 6e33. 05:14 RB.A45 QPS trip. Recovery… Now preparing for injection… 24-05-2012 LHC morning report

Fill 2658: Back to Best Performance 24-05-2012 LHC morning report

Emittances Before/After Collisions B1 H V H V 24-05-2012 LHC morning report

Emittances After Collisions B2 24-05-2012 LHC morning report

Octupoles (E. Metral, S. Fartoukh) Initially we decided to choose the sign of current in the ocupoles to generate a negative amplitude detuning in both planes in order to be far away from the the order resonnances. As a result the octupole detuning fight against the beam-beam induced detuning.  Now putting some numbers a) 500 A in MO at 4 TeV gives an amplitude detuning of -3.4 10^{-3} at 6 sigma peak amplitude b) Nb=1.3E11, epsilon=2.5 micron, gives a beam tune spread of about + 5 10^{-3} for the bunches collding in IR8 only. Therefore after some hours of coast, proton burning or emittance growth, the sum of the two can be equal to zero, something which also did not occur last year runing at only 100-200A in the octupole (the beam-beam tune spread was always bigger) We could then suggest to try changing back the sign for the octupoles. 24-05-2012 LHC morning report

Planning Ahead Delivering luminosity… Inverting octupole sign? Switching to new filling scheme (no IR8 “private” collisions). Others: TCL follow-up. Strategy for intermittent TOTEM interlock for long weekend. Non-urgent work: End of fill tune scan to optimize beam lifetime through tune WP. RF: end of fill time to fine-adjust the tuners (with beam). 1-2 hours needed. RF: Install the operational batch-per-batch blow-up… when possible. 1-2 hours at injection. Vacuum: Access to repair a pumping group in S45. BI: Access to reconnect and repair head-tail monitor in IR4. 1-2 hours. 24-05-2012 LHC morning report