Status Report of GISC Tokyo

Slides:



Advertisements
Similar presentations
Status of Implementation at RTH Tokyo By Hiroyuki Ichijo Contents Contents 1. GTS facilities 2. GTS circuits 3. Use of the Internet 4. Collection of SHIP.
Advertisements

Current Status of Implementation of MTN at RTH Beijing Li Xiang National Meteorological Information Center, CMA.
Overview of the Improved MTN project Geoff Molloy Communications and Computing Branch Bureau of Meteorology Australia.
CMA’s new GTS system Submitted by YANG Genlu, China
© Crown copyright Met Office APSDEU / NAEDEX 2012 Chris Little, Met Office October 2012 Exeter, UK.
Status of the Global Telecommunication System connected with RTH Tokyo Japan Meteorological Agency Presented by Masahiro Kazumori Eighth Meeting on Asia-Pacific.
Features of the new TCP/IP link between HK and Beijing (Guangzhou) Features of the new TCP/IP link between HK and Beijing (Guangzhou) Justin Waiman MA.
Status on RTH Tokyo (Item 2.1) By Hiroyuki Ichijo By Hiroyuki Ichijo Expert Meeting on the Exchange of Early Warning and Related Information Including.
STATUS OF IMPLEMENTATION AT RTH BEIJING SHI Peiliang, China
Status of the Global Telecommunication System connected with RTH Tokyo Sixth Meeting on Asia-Pacific Satellite Data Exchange and Utilization (APSDEU-6)
Status of RTH Tokyo Japan Meteorological Agency Presented by Tatsuya Noyori Expert Team on WIS-GTS Communication Techniques and Structure (TOULOUSE, France,
Status of RTH Tokyo Japan Meteorological Agency Presented by Kenji Tsunoda Joint implementation-coordination meeting on the GTS-WIS MTN and meeting of.
Status of Implementation TCP/IP at RTH Beijing NMIC, CMA.
Status of the GTS connection to RTH Tokyo Eleventh Meeting on Asia-Pacific Satellite Data Exchange and Utilization (APSDEU-11) (Boulder, USA, 02 to 06.
GISC Brasilia status report Doc25 (AI 2)
GISC Washington Status Doc 21r1
Status of GISC Tokyo GISC Tokyo / JMA.
Status and Plans of RMTN in RA V (For report to ICT-ISS Sep 2010)
GISC Exeter Status Report
GISC Seoul Status TT-GISC, Melbourne April 2016
RMDCN Status Report Submitted by: Oliver GORWITS (ECMWF) (Doc 20)
Status report of GISC Beijing
GISC Tehran Status Feb, 2016 TT-GISC 2016-Doc18.
GISC Status WIS Portal based on a commercial solution
Requirement for Full Global Operation on WIS Survey on the WIS Doc
Automation of NMCs for GTS operation
WIS Implementation Status in RA II
Status Report of GISC Beijing
Progress Report on WIS Implementation, Hong Kong Observatory, Hong Kong, China Submitted by: S.T. CHAN (Hong Kong, China) (Doc 12) Expert team on WIS centres.
GISC PRETORIA STATUS REPORT.
Regional Meteorological Telecommunication Network for Region II (Asia)
Outcome of the ET-CTS Meeting (Toulouse, May 2008)
RTH Exeter Status Report
GISC Beijing Status Report Doc25
Review of the current status of implementation of TCP/IP procedures and applications at GISC Beijing ET-CTS, Dakar, 5-8 April 2016.
RTH Prague Czech Hydrometeorological Institute Ladislav Keller
Regional Training Seminar on GTS Techniques and Procedures
ET-CTS 2016 ASECNA, Dakar. Senegal Date: April 2016
Expert Team on WIS Centres Task Team on GISCs
ET-CTS 2016 ASECNA, Dakar. Senegal Date: April 2016
WIS overview Submitted by: Secretariat (Doc 02b)
TT-GISC-2016 Doc 15 Agenda Item 2
Status of Implementation at RTH Tokyo
GISC Washington Status Submitted by: Robert BUNGE (USA) (Doc 20)
GISC Moscow status report Submitted by: Sergey BELOV (Russia) (Doc 17)
Outcome of the ET-CTS Meeting (Toulouse, May 2008)
Toulouse GISC Status Doc 29
MeteoFranceMPLS via Toulouse
Status Report of RTH Tokyo
GISC MOSCOW STATUS REPORT 2018
GISC Tokyo Status (Short update) Doc 23
Status of RA II WIS Implementation Plan
GISC Tokyo Cloud Pilot Project
Status Reprot GISC SEOUL
Status Report GISC Tehran
Report from Task Team on GISC (TT-GISC)
Status report of GISC CASABLANCA
GISC Offenbach – Status Report 02/2014 (Doc 19)
- Measurement of traffic volume -
GISC Offenbach Kai Wirt Task Team GISC TT-GISC2018
GISC Brasilia Status Doc 30
Status report of GISC Beijing
GISC Exeter Status Report
Status report of GISC Beijing
GISC – GISC mutual backup Backup Status Remarks
GISC New Delhi Status Dr. S. L. Singh
GISC Exeter Status Report
RTH Exeter Status Report – 2014 (Doc 22)
GISC Beijing Status Report
GISC Exeter Status Report
Presentation transcript:

Status Report of GISC Tokyo Yoritsugi OHNO Japan Meteorological Agency (JMA) (Doc 13r2) ET-CTS 2016, ASECNA, Dakar. Senegal Date: 05-08 April 2016

GTS Connections (1) Topics: Establishment of a new link with Toulouse; July 2014 Establishment of new link (on RMDCN and NTT-Com) with Disaster Recovery Site in Osaka; January 2015 GISC Tokyo has started exchanging data by using HTTPS with Brasilia via internet as pre-operational in October 2015 Migration of the link with Seoul from dedicated circuit to the RMDCN link; December 2015 Establishment of a new link with Doha; February 2016 Please see the following URL: http://www.jma.go.jp/jma/jma-eng/jma-center/rth/GTS_upgrades.html

Regional Meteorological Data Communication Network (RMDCN) GTS Connections (2) 50Mbps WMC Washington 128Kbps Regional Meteorological Data Communication Network (RMDCN) MPLS Network (Interoute) MPLS Network (NTT_COM) RTH Bangkok Internet 4Mbps WMC Melbourne NMC Hanoi 16Mbps RTH Beijing NMC Phnom Penh 50Mbps RTH Offenbach NMC Nay Pyi Taw RTH Toulouse 50Mbps NMC Vientiane RTH Exeter 20Mbps 1Mbps 4Mbps NMC Hong Kong RTH New Delhi 64Kbps 4Mbps NMC Manila NMC Seoul RTH Brasilia 64Kbps RTH Khabarovsk 64Kbps GISC/RTH Tokyo (RJTD) 10Mbps 10Mbps 2Mbps 100Mbps NMC Doha 2Mbps 2Mbps Firewall

GTS Connections (3) Implementation status of GTS circuits connected to RTH Tokyo 21th February 2016 http://www.jma.go.jp/jma/jma-eng/jma-center/rth/GTS_upgrades.html

Daily Volume (1) Text, Binary, FAX message and File

Daily Volume (2) Occupancy rate (each channel)

GISC Backup (1) GISC Beijing GISC Melbourne GISC Backup between Beijing and Tokyo is in operational by using GTS and Internet DAR service. GISC Melbourne Signed letters on GISC backup agreement were officially exchanged in March 2012. Tokyo has two options for AoR of Melbourne; option 1: Existing GTS based backup option 2: Internet based backup Both options are already running in backup with Beijing and Offenbach.

GISC Backup (2) GISC Offenbach GISC Backup between Offenbach and Tokyo is in operational by using Internet. To Offenbach: using FTP put To Tokyo : using HTTPS file upload DCPC NC GISC Offenbach AMDCN GISC Tokyo AMDCN GISC Offenbach GISC Tokyo Internet HTTPS file upload FTP put cache

Establishment of the DRS JMA’s Disaster Recovery Site (DRS) on west side of Japan (Osaka city, 500km far from Tokyo) has been in operation since March 2015. The DRS has the same architecture of current MSS and access lines of MPLS networks. As of now, some centres finished a connectivity test and started backup operation. 500Km Tokyo RMDCN-NG Osaka AMDCN

Thank you! GISC Tokyo Web portal: http://www.wis-jma.go.jp/ JMA HP: http://www.jma.go.jp/jma/indexe.html

Traffic status of Washington (50Mbps) – Tokyo (10Mbps) 1.7GB/Day 156MB/Day

Traffic status of Melbourne (4Mbps) – Tokyo (10Mbps) 111MB/Day 986MB/Day

Traffic status of Beijing (16Mbps) – Tokyo (10Mbps) 3.0GB/Day 1.3GB/Day

Is this reached to peak throughput? Traffic status of Exeter (20Mbps) – Tokyo (10Mbps) Is this reached to peak throughput? Round Trip Time=250ms 4.3GB/Day 397MB/Day

Traffic status of Offenbach (50Mbps) – Tokyo (10Mbps) 12MB/Day 170MB/Day

Traffic status of New Delhi (4Mbps) – Tokyo (10Mbps) 16MB/Day 395MB/Day

Traffic status of Toulouse (50Mbps) – Tokyo (10Mbps) 33MB/Day 170MB/Day

Traffic status of Seoul (4Mbps) – Tokyo (10Mbps) 41MB/Day 1.3GB/Day

Traffic status of Bangkok (128Kbps) – Tokyo (2Mbps) 1MB/Day 167MB/Day

Traffic status of Khabarovsk (dedicated 64Kbps) – Tokyo 3MB/Day 138MB/Day

Traffic status of Hong Kong (1Mbps) – Tokyo (2Mbps) 5MB/Day 1.1GB/Day

Traffic status of Manila (64Kbps) – Tokyo (2Mbps) 0.2MB/Day 137MB/Day

Traffic status of Doha (IPVPN 2Mbps)– Tokyo 0.3MB/Day 167MB/Day

WIS part-B Internet Traffic Downloading data 200 GB/Day Bandwidth 100Mbps