Overview Some useful presentations: Public overview – coffee meeting

Slides:



Advertisements
Similar presentations
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
Advertisements

TIARA WP2 Report and wrap-up Final Annual Meeting R. Aleksan Nov. 27 th, 2013.
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
TS, Length of YETS EYETS LIU & CONS Project
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
HiRadMat – Users Meeting 6/2/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
First radiological estimates for the HIRADMAT project H. Vincke and N. Conan 1.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
LIU external beam dump review External beam dump option A: branching off from LSS6 J.L. Abelleira Thanks to: F. Velotti, B. Goddard, M. Meddahi, H. Vincke,
High Rate Tracking Test Beam Area David Christian & Richard Coleman.
6 April 2006Malika Meddahi 1 CNGS Project: primary beam 1.Project Overview 2. Proton beam line overview and status 3. Target status 4. Commissioning preparation.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,
HIGH RADIATION TO MATERIALS: HIRADMAT STATUS HiRadMat Scientific Board, 23/4/2012 Outline  Location  Status  Beam line  Infrastructure  Exp. Area.
HIGH RADIATION TO MATERIALS 20 TH P ROJECT T EAM M EETING – O CTOBER 14, 2010 Project Team Meeting CERN, October 14, 2010  Beam requests - operation I.
PS-EA Update RadWG August 23 rd 2012 Radiation 2 Electronics (R2E) LHC Activities RadWG August 23 rd 2012 PS East Area Update M. Brugger on behalf of the.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Dr. José Miguel JIMENEZ LS2 Project Leader, CERN 1 LS2 Days 30 th September2015.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
HiRadMat status report Adrian Fabich HiRadMat EAM, 4. March 2016 EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
HiRadMat Summary of Phase-I and plans for Phase-II commissioning J. Blanco, N. Conan, V. Kain, K. Cornelis, B. Goddard, C. Hessler, M. Meddahi, C. Theis,
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
29 October 2015 B. Di Girolamo. B. Di Girolamo – Collider-Experiments Day – 5 th HiLumi Annual Meeting 2 Collider-Experiments Interactions There is a.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
The Next Generation of a Gamma Irradiation Facility GIF++
Adrian Fabich HiRadMat Technical Board CERN, 15th Sep 2016
Transnational Access: overview , procedures and reporting
SPS Personnel Protection System Renovation Project
BENCH-CAN Internal evaluation 2nd semester
ICE SECTION The coolest place to be! Elias Métral
East Area Renovation Project Team meeting # 2 – EDMS News
HiRadmat requests A. Fabich MSWG, 30. January 2015.
Framework Schedule from EYETS 2016 to LS2
Access to material testing facilities (WP10)
MERcury Intense Experiment Experiment Layout
PRR Activation Meeting
WP13: Access to Plasma Beam testing facilities
East Hall under construction
Injector De-cabling Project
REPORTING SDG INDICATORS USING NATIONAL REPORTING PLATFORMS
WP8 – Improvement and equipment of irradiation beam lines
News and brief overview of Beamline plans for the next few months
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
4th FRC meeting, Antti Onnela, CERN-PH-DT
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
East Hall under construction
Collimator Control (SEUs & R2E Outlook)
IS&T Project Reviews September 9, 2004.
Preparatory Action 2011 European Voluntary Humanitarian Aid Corps Call for proposal
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
LO2 - Be Able to Design IT Systems to Meet Business Needs
Strategic Plan Implementation July 18, 2018
Present and Future test facilities for High-intensity Targetry CERN
Experimental Areas – LS2 planning
Candidate for Standardization Pilot Program - Status Report
East Hall under construction
A. Fabich EuCARD-2 annual meeting 2017, Glasgow
Comments on the North Experimental Area Consolidation Request Form
Presentation transcript:

Overview Some useful presentations: Public overview – coffee meeting https://indico.cern.ch/event/510058/ Operational aspects Section meeting of 1st March 2016 And all User Meetings and EAM (see HiRadMat indico) Transnational Access Final annual meeting https://indico.cern.ch/event/578818/timetable/#20170328.detailed Final report – in the pipeline (to be found at http://eucard2.web.cern.ch/science/deliverables) Essential information available at http://cern.ch/hiradmat there are no hidden/restricted documents (action: simply EDMS context) and I have some personal comments in this presentations … 25/4/2017 A. Fabich

A. Fabich EN-EA-LE retreat 2017 HiRadMat at CERN-SPS A. Fabich EN-EA-LE retreat 2017

Fiona Harden New team member Fellow in EN/EA on R2E and HiRadMat since April 2017 - One fellow is great - one (tech.) student at a time would have a great opportunity EA-EC support available, needs to be secured Update EDMS 1154586 “HiRadMat Facility management” 25/4/2017 A. Fabich

Transnational Access EU FP7 finances travel/accommodation for HRM users external to CERN. Great support from CERN-EU office, particularly Sabrina! clarified/improved visitor registration in preparation 288 user days at CERN enabled through HiRadMat in FP7 25/4/2017 A. Fabich

ARIES Successor to EuCARD2 EU proposal submitted in 2016 ARIES WP10 is split across two tasks: Task 10.1 – HiRadMat Task 10.2 – UNILAC (GSI) Approved from May 2017 for 4 years 100 kEUR (-10 kEuro for Sabrina) CERN operational budget about 50-80 kCHF/year Transnational Access TNA counting is different from EuCARD2 200 beam hours (HRM cycle in the super-cycle) promised 5 experiments, 5 shifts/experiment, 8 hours/shift 2016: FlexMat, Jaws, TDIcoat, MultiMat, RotColl For all experiments: assure at least one publication For TNA supported experiments: relevant publication with ARIES acknowledgment 25/4/2017 A. Fabich

Usually beam time in envisaged week, back-up in the following week. No experimental installation in TNC/TT61 – time reserved for shut-down works First experiments installed by week 17, before LHC start-up BTV ATLAS pixel RotColl TaScat, CRY2, TCDI, TDIcoat FlexMat SextSC MultiMat Backup+ Usually beam time in envisaged week, back-up in the following week. 25/4/2017 A. Fabich

TCDI, LHC collimator, highest priority New BTV screen Essential for ALL experiments To be commissioned Initially with low intensity possible First HRM beam action in 2017 TCDI, LHC collimator, highest priority Delay beyond week 21 will impact on overall HRM schedule TCDI, RotColl, TDIcoat and MultiMat rely on highest pulse intensities (Draft slide to IEFC) No experimental installation in TNC/TT61 – time reserved for shut-down works First experiments installed by week 17, before LHC start-up BTV ATLAS pixel RotColl TaScat, CRY2, TCDI, TDIcoat FlexMat SextSC MultiMat Backup+ 25/4/2017 A. Fabich

BTV camera in TT61 New from 2017 BTV mounted on Table A for testing Camera placed in TT61 Dedicated feed-through already available Space to be shared with HS cameras/LDV For integration see with Aymeric/Vincent All hardware available Box, screens+mechanism, FT window, TT61 setup+camera Vacuum tests in week 16 Survey/installation in week 17 25/4/2017 A. Fabich

HiRadMat User Day Work shop at CERN in June 2016, supported by EuCARD2 ~50 participants with TNA users from Czechia, Germany, Norway, Sweden, Switzerland, UK and USA Follow-up the scientific achievements from former experiments Identification of additional research subjects additionally to the ones already established. Assessed wish list of facility upgrades Some implemented within recent months E.g. BTV screen for beam monitoring at experiment possible from this year Larger items like physical separation of HiRadMat operation and LHC filling is financially difficult Detailed summary in EDMS 1709921 BTV + containment 25/4/2017 A. Fabich

Assure LIU operation Beyond LS2 Upgrade of beam diagnostics Secured window performance SPS2HRM HRM2dump Adapt dump layout 25/4/2017 A. Fabich

HiRadMat coordination Applying for beam time All proposals/safety files available at http://cern.ch/hiradmat Beam time application Experiments are recommended by the HiRadMat Scientific Board Scientific interest of the experiment, feasibility and post-irradiation analysis Expected results and publications to the interest of the scientific community Approval validated by the HiRadMat Technical Board Integration, operational and safety aspects, radiation protection and waste management So far we could assign beam time to all approved experiments ATSMB HiRadMat coordination EATM, IEFC Operation Experiments feed-back? Beams BE/OP Scientific Board User proposals Facility EN/EA HSE/RP EN/HE Techn. Board Regular meetings for daily operation: Experimental Area management with CERN groups Users meeting (with video conferencing) 25/4/2017 A. Fabich

Feed-throughs Between TT61 and TNC Improving the signal quality at read-out Successfully used by all experiments in 2015 25/4/2017 A. Fabich

Publication by Nikos Electronics in TT61 During LS1, new location in TT61 with feed-through to TNC for direct cabling used by all experiments Specifications Maximum cable length/optical path: 15 m From electronics to target center Optical path each up- and downstream Similar prompt radiation levels as in TJ7 bunker Thick target, 3e12 ppp 10e6 hadrons/cm2 for full intensity pulse no Bat/RadMon available Additional shielding implemented (September 2015): concrete replaced by iron, radiation shielding more than a factor 10 Optional counter measures: Increase distance (additional optical path/cable length) old configuration Publication by Nikos 25/4/2017 A. Fabich

Injectors to HiRadMat in 2015 Accumulated SPS cycle time: 4.0 days Total intensity extracted: 3.7e15 pot Excellent performance of the injectors providing beams with large flexibility, in the largest intensity range for multi-bunch pulses. All planned beams provided. 2012: 2 days, 1.4e16 pot Courtesy V. Kain 25/4/2017 A. Fabich

Dismantling WANF – 2nd stage An tremendous work was done during clearing for HiRadMat 2009-2011 Now aiming a big step further Dismantling WANF 2nd stage – DW2 Project goal put WANF downstream TNC into safe and clean state recuperate unnecessary material including activated items until LS2/LS3 Technical documents HRM-EAM 16/11/16 EDMS 1730735 overview EDMS 1771615 disk recuperation (failed so far) 25/4/2017 A. Fabich