LLRF Controls Outline Requirements External Interfaces Schedule Design

Slides:



Advertisements
Similar presentations
01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
Advertisements

26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
RF / Laser Timing for 5/20/14 Frisch. Requirements, Jitter and Drift Looking for 100fs Pk-Pk measurements – 30fs RMS. (state of the art) Jitter:
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS RF Stability Requirements LCLS Requirements The SLAC Linac.
R. Akre XFEL Short Bunch Measurement and July 26, 2004 LCLS Drive Laser Timing Stability Measurements XFEL Short Bunch Measurement.
Dayle Kotturi Controls April 29, 2004 Injector Controls LCLS Facility Advisory Committee April 29-30, 2004 Outline Description.
Ron Akre, Dayle Kotturi LCLS April 20, 2006 Linac Coherent.
Stephanie Allison Integration with the SLC Control Oct 27, Introduction Demo SLC-Aware IOC Plans for Next 12 Months.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector –Linac System Overview E. Bong LCLS FAC October 27, 2005.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
Ron Akre, Dayle Kotturi LCLS February 8, 2006 Linac Coherent.
Patrick Krejcik LCLS November 11-12, 2008 SLAC National Accelerator Laboratory 1 Post-commissioning Controls Enhancements.
Overview of the LLRF Activities at SLAC
Status of MicroTCA LLRF Development Zheqiao Geng On behalf of the LLRF AIP team 6/4/2012.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
LCLS-II Injector LLRF System – MicroTCA Based Design Zheqiao Geng 6/4/2012.
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
Dayle Kotturi Lehman Review May 10-12, 2005 Low Level RF Outline Scope Local feedback loop requirements Solutions Costs How this.
Ron Akre, Dayle Kotturi LCLS LLRF September 19, 2006.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 LLRF Outline System Concept Review Requirements.
Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 Timing Outline System Concept Review Requirements.
The recent history and current state of the linac control system Tom Himel Dec 1,
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
Ron Akre, Dayle Kotturi Lehman October 24-26, 2006 Linac.
PIP Update Oct 29 th Agenda Summary Update – Current Activities – Updates – Additional Meetings/Notes.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: RF system group Paolo Craievich :: RF Section :: Paul Scherrer Institut SwissFEL.
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
ATF2 Magnet Power Supplies
New xTCA Developments at SLAC
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
LLRF and feedback Outline Scope LLRF Requirements
LLRF and Beam-based Longitudinal Feedback Readiness
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
13-block rotation schedule
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
C75 LLRF Cost and Schedule
Low Level RF Status Outline LLRF controls system overview
LLRF Control System Outline Scope Requirements Design Considerations
LCLS Longitudinal Feedback and Stability Requirements
LCLS Injector Commissioning Dates ( )
CMX scope and functionalities
RF Pulse Shaping.
TSF Upgrade Project Overview Resources Plans and Timetable
LCLS Drive Laser Timing Stability Measurements
Low Level RF Status Outline LLRF controls system overview
LCLS RF Stability Requirements
Linac/BC1 Commissioning P
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
LLRF Control System Outline Scope Requirements Options considered
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
Linac Coherent Light Source (LCLS) Low Level RF Status
Low Level RF Design Outline Scope Requirements Options considered
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Linac Coherent Light Source (LCLS) Low Level RF Status
Low Level RF Status Outline Overview showing hardware instances
The RF Control System for the SwissFEL
Linac Coherent Light Source (LCLS) Low Level RF System Injector Turn-on December 2006 February 8, 2006.
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
LCLS Control System Personnel Linac & BC2 Controls progress
Injector/Linac RF Status
Presentation transcript:

LLRF Controls Outline Requirements External Interfaces Schedule Design Date Needed Prototype Completion Date Hardware Order Date Installation Test Period Design Design Maturity (what reviews have been had) State of Wiring Information State of Prototype

Requirements At 120 Hz, meet phase/amp noise levels defined as: 0.1% rms amplitude 100 fs rms in S-band (fill time = 850 ns) 125 fs rms in X-band (fill time = 100 ns) All tolerances are rms levels and the voltage and phase tolerances per klystron for L2 and L3 are Nk larger, assuming uncorrelated errors, where Nk is the number of klystrons per linac (L2 has 28; L3 has 48)

Engineering Requirements When beam is present, control will be done by beam-based longitudinal feedback (except for T- cavs); when beam is absent, control will be done by local phase and amplitude controller (PAC) Adhere to LCLS Controls Group standards: RTEMS, EPICS, Channel Access protocol Ref: Why RTEMS? Study of open source real-time OS Begin RF processing of high-powered structures May 20, 2006

External Interfaces LLRF to LCLS global control system PVs available for edm screens, archiving, etc over controls network LLRF VME to beam-based longitudinal feedback from feedback: phase and amplitude corrections at 120 Hz over private ethernet from LLRF: phase and amplitude values (internal) LLRF VME to LLRF microcontrollers from VME: triggers, corrected phase and amplitude from microcontrollers: phase and amplitude averaged values at 120 Hz, raw phase and amplitude values for debug

External Interfaces: Laser - Tcav

External Interfaces: L2-L3

Schedule – for PAD Date Needed: injector: Dec/06 Prototype Completion Date: Mar/06: board prototype (2 or 4 chan, thermo) May/06: final board. Test (incl temp. cycling) Hardware Order Date: continuous Hardware Delivery Date: by Sep/06: chassis (15 dual channel) avail. Installation: injector: Oct/06 Test Period: injector: Nov/06

Schedule – for PAC Date Needed: injector: Dec/06 Prototype Completion Date: Jan/06: first board prototype Mar/06: first board prototype if not same as fast PAC Hardware Order Date: continuous Hardware Delivery Date: by Sep/06: chassis (6 single channel) Installation: injector: Nov/06 Test Period: injector: Nov/06

Schedule – for slow PAC Date Needed: injector: Dec/06 Prototype Completion Date: Mar/06: first board prototype if different than fast PAC Hardware Order Date: continuous Hardware Delivery Date: by Sep/06: chassis (6 single channel) Installation: injector: Nov/06 Test Period: injector: Nov/06

Schedule – for timing/feedback crate Date Needed: injector: Dec/06 Prototype Completion Date: Fall/06 Hardware Order Date: done Hardware Delivery Date: have it Installation: injector: Nov/06 Test Period: injector: Nov/06

Design Design maturity (what reviews have been had): RF/Timing Design, DOE Review, August 11, 2004 Akre_FAC_Oct04_RF_Timing, FAC Review, October, 2004 Low Level RF Controls Design, LCLS Week, January 25-27, 2005 Low Level RF, Lehman Review, May 10-12, 2005 LLRF Plans for Development and Testing of Controls, LCLS Week, July 21, 2005 Low Level RF Design, Presentation for Controls Group, Sept. 13, 2005 LLRF Preliminary Design review, SLAC, September 26, 2005 LCLS LLRF Control System - Kotturi, LLRF Workshop, CERN, October 10-13, 2005 LCLS LLRF System - Hong, LLRF Workshop, CERN, October 10-13, 2005 LLRF and Beam-based Longitudinal Feedback Readiness - Kotturi/Akre, LCLS Week, SLAC, October 24-26, 2005 LCLS Week LLRF and feedback - Kotturi/Allison, LCLS Week, SLAC, October 24-26, 2005 LLRF, LCLS System Concept Review/Preliminary Design Review, SLAC, November 16-17, 2005 Comments LLRF Beam Phase Cavity Preliminary Design review, SLAC, November 30, 2005 Docs at: http://www.slac.stanford.edu/grp/lcls/controls/global/subsystems/llrf State of wiring: percent complete Captar input will be given at time of presentation State of prototype: PAD (1 chan ADC) and PAC boards built (shown on next pages).Testing.

PAD – the monitor board

PAD – the monitor board – fix for only 2 chan

PAC – the control board

PAC – the control board

Additional Slides The following two pages show an overview of the LLRF control modules. From these diagrams, counts of module types, as well as function and location are seen.

Overview of LLRF at Sector 20

Overview of LLRF at Sector 24