Date of download: 12/25/2017 Copyright © ASME. All rights reserved. From: Robust H-Infinity Control for a Premium Pricing Model With a Predefined Portfolio Strategy ASME J. Risk Uncertainty Part B. 2015;1(2):021006-021006-8. doi:10.1115/1.4029758 Figure Legend: Premium for the three products for the case 6: (m1=50%, m2=50%)
Date of download: 12/25/2017 Copyright © ASME. All rights reserved. From: Robust H-Infinity Control for a Premium Pricing Model With a Predefined Portfolio Strategy ASME J. Risk Uncertainty Part B. 2015;1(2):021006-021006-8. doi:10.1115/1.4029758 Figure Legend: Accumulated reserve for the three products for the case 6: (m1=50%, m2=50%)
Date of download: 12/25/2017 Copyright © ASME. All rights reserved. From: Robust H-Infinity Control for a Premium Pricing Model With a Predefined Portfolio Strategy ASME J. Risk Uncertainty Part B. 2015;1(2):021006-021006-8. doi:10.1115/1.4029758 Figure Legend: Premium for product 2 for the case 1: (m1=100%, m2=0%), 6: (m1=50%, m2=50%) and 11: (m1=0%, m2=100%)
Date of download: 12/25/2017 Copyright © ASME. All rights reserved. From: Robust H-Infinity Control for a Premium Pricing Model With a Predefined Portfolio Strategy ASME J. Risk Uncertainty Part B. 2015;1(2):021006-021006-8. doi:10.1115/1.4029758 Figure Legend: Accumulated reserve for product 2 for the case 1: (m1=100%, m2=0%), 6: (m1=50%, m2=50%) and 11: (m1=0%, m2=100%)
Date of download: 12/25/2017 Copyright © ASME. All rights reserved. From: Robust H-Infinity Control for a Premium Pricing Model With a Predefined Portfolio Strategy ASME J. Risk Uncertainty Part B. 2015;1(2):021006-021006-8. doi:10.1115/1.4029758 Figure Legend: Total premium for the case 1: (m1=100%, m2=0%), 6: (m1=50%, m2=50%) and 11: (m1=0%, m2=100%)
Date of download: 12/25/2017 Copyright © ASME. All rights reserved. From: Robust H-Infinity Control for a Premium Pricing Model With a Predefined Portfolio Strategy ASME J. Risk Uncertainty Part B. 2015;1(2):021006-021006-8. doi:10.1115/1.4029758 Figure Legend: Total reserve for the case 1: (m1=100%, m2=0%), 6: (m1=50%, m2=50%) and 11: (m1=0%, m2=100%)
Date of download: 12/25/2017 Copyright © ASME. All rights reserved. From: Robust H-Infinity Control for a Premium Pricing Model With a Predefined Portfolio Strategy ASME J. Risk Uncertainty Part B. 2015;1(2):021006-021006-8. doi:10.1115/1.4029758 Figure Legend: Disturbance level wn for product 2 for all cases: from t=0 to t=52