Aptar Graduate Program “Inspire Me” Quality

Slides:



Advertisements
Similar presentations
Identifying enablers & disablers to change
Advertisements

Certification Match Analyze Company Skill Needs 3. Confirm Certification Match & Required LEVELS Develop Pilot Plan (Beta) Institutionalize (Deploy) Certification.
©2006 OLC 1 Process Management: The Foundation for Achieving Organizational Excellence Process Management Implementation Worldwide.
Enter System Name AdvancED TM External Review Exit Report Catalyst High School May 11,12,13, 2014.
TNO Measurable Impact EARTO Working Group on Quality and Excellence 20th June 2011.
1 Quality Management Standards. 2 THE ISO 9000 FAMILY ISO 9000: 2005 Identifies the fundamentals and vocabulary for Quality Management Systems (QMS) ISO.
Monitoring and Evaluation in GEF International Waters Projects Dr. Juha I. Uitto GEF Monitoring and Evaluation
The Quality Improvement Model
Welcome ISO9001:2000 Foundation Workshop.
What is Business Analysis Planning & Monitoring?
ISTEP: Technology Field Research in Developing Communities Instructor: M. Bernardine Dias CAs: Sarah Belousov and Ermine Teves Spring 2009.
Introduction to ISO New and modified requirements.
North American Lighting and TQM Kevin Blatnik. My Background 1998: Graduated from EIU with BSIT 1998: Graduated from EIU with BSIT Went to work for Navistar.
Marina Signore Head of Service “Audit for Quality Istat Assessing Quality through Auditing and Self-Assessment Signore M., Carbini R., D’Orazio M., Brancato.
Quality Management.  Quality management is becoming increasingly important to the leadership and management of all organisations. I  t is necessary.
© 2005 Wiley1 Total Quality Management Chapter 5.
MAINSTREAMING MONITORING AND EVALUATION IN EDUCATION Can education be effectively managed without an M & E system in place?
School of Health Systems and Public Health Monitoring & Evaluation of HIV and AIDS Programs Data Quality Wednesday March 2, 2011 Win Brown USAID/South.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Continuous Improvement and Focused Monitoring System US Department of Education Office of Special Education Programs Overview of the OSEP Continuous Improvement.
Internal Auditing ISO 9001:2015
General Secretariat Organization of American States Development and Implementation of a Planning, Control and Evaluation System DPCE presentation to the.
HRBA Project Planning Steps Moving Towards Clear Project.
January 23,  Balance state’s higher education long range plan and agency operations in the required strategic plan;  Involve agency staff in.
Chapter 1 Market-Oriented Perspectives Underlie Successful Corporate, Business, and Marketing Strategies.
Clarasia Monica Siera Zahra
LEAN SIX SIGMA PROJECT TEMPLATE
INTRODUCTION OF COST ACCOUNTING
Integrated Management Systems
Functions and Activities of HRM
Problem Solving Process.
Overview of Project Planning
Chapter 10 Software Quality Assurance& Test Plan Software Testing
MANAGING HUMAN RESOURCES
The International Plant Protection Convention
Division of powers between IA, SAI and FI
Aptar Graduate Program “Inspire Me” Operations
Object Oriented Concepts -I
Aptar Graduate Program “Inspire Me” Molding
Continuous Improvement through Accreditation AdvancED ESA Accreditation MAISA Conference January 27, 2016.
Clinical Engineering Lecture (3).
Fundamentals of ISO.
Aptar Graduate Program “Inspire Me” Information System
Training Course on Integrated Management System for Regulatory Body
Aptar Graduate Program “Inspire Me” Manufacturing
Six Sigma Green Belt Project
INTRODUCTION TO ISO 9001:2015 FOR IMPLEMENTATION Varinder Kumar CISA, ISO27001 LA, ISO 9001 LA, ITIL, CEH, MEPGP IT, Certificate course in PII & Privacy.
Krannert’s Global Supply Chain Business Continuity Planning Discussion
Quality Management Systems – Requirements
Project Management Processes
Aptar Graduate Program “Inspire Me” Sustainability
GRANTS – WORKPLAN AND MONITORING AND EVALUATION (M&E) INSTRUCTIONS
LEAN SIX SIGMA PROJECT TEMPLATE
LEAN SIX SIGMA PROJECT TEMPLATE
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan Robustness Diagram Trends and Challenges.
Job Analysis Prof Srividya Iyengar.
Introducing Requirements Change Management Process into ISO/IEC 12207
Master in Economics of Tourism: Monitoring and Evaluation
Data Framework A Positive Impact.
Identifying enablers & disablers to change
Why should the public sector want to innovate?
TS
Measuring Success: Evaluating Community Initiatives
Unit 4 - A05 – Testing Grade Criteria To get a c
CHAPTER 9 CORPORATE SOCIAL RESPONSIBILITY AND GLOBAL ISSUES IN OPERATIONS MANAGEMENT.
TS
Integrating Gender into Rural Development M&E in Projects and Programs
TS
For a more just world For a better world.
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Presentation transcript:

Aptar Graduate Program “Inspire Me” Quality

Project under development Hiring Manager: Nando Cutarella Department: Quality Plant: Chieti Name of the Project: Develop Sustainable versions for: GS, GSA, PZ Lark, EvoClassics The Project in detail: Research for Sustainable Resins and Suppliers Carry out tests to identify possible applications Qualification and Validation of the resins for Aptar Products Candidate Profile: University Degree related to Sustainability Engineering, Economy Planned Activities: Identification of the pumps and components for which we may implement sustainable resins. Identification of suppliers and sustainable resins valuable for testing Molding, dimensional and functional tests of components and pumps necessary for qualification and validation. Company Tutor: Nando Cutarella

Project under development Hiring Manager: Nando Cutarella Department: Quality Plant: Chieti Name of the Project: ISO 9001:2015 Risk Management System The Project in detail: Review the Procedures, Work Instructions Indicators of Performance, of Risk External and Internal and External Factors and respective Impact, Stakeholders. Candidate Profile: Engineering, Business Economy. Planned Activities: Map the actual Management System. Rievew the Procedures, Work Instructions. Review the processes of the organization. Review the indicators. Organize Communication process to share the results and define actions. Company Tutor: Cutarella Nando

Project under development Hiring Manager: Nando Cutarella Department: Quality Plant: Pescara Name of the Project: Statistical Process Control in Molding The Project in detail: Today we have an SPC system in place that is focused on the process parameters. Tjhe project aims and empowering and completing the system by taking into account the product/component dimensions. And find relationship between the parameters and the dimensions. Candidate Profile: Engineering, Statistics Planned Activities: Identify the dimensions and components to monitor for SPC. We should take into account also the time requested for the measurement. Design the dimensional tests that must be implemented (including frequency of tests). Organize the data collection and the most effective way to read and analyze data. Company Tutor: Cutarella Nando