Complementary Experiments at DONES

Slides:



Advertisements
Similar presentations
Paris, November 2004 M. Lewitowicz NuPECC meeting Physics case of SPIRAL 2 and EURISOL SPIRAL2 and EURISOL facilities Available Beams Physics Case Conclusions.
Advertisements

Fusion Materials Irradiation with a Spallation Source Eric Pitcher and Stuart Maloy Los Alamos National Laboratory.
PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Titel des Kapitels: ITC Franklin Gothic LT, Bold, 11 Punkt, weiß MLS (Metrology Light Source) and the Willy-Wien-Laboratory – Status Report Ralph Lange.
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
IFMIF/ELAMAT initiative in Poland Adam Maj NUPECC Meeting, Athens, March 13-14, 2015.
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
Broader Approach Activities toward Fusion DEMO Reactors IT/E-2 IAEA 21 st Fusion Energy Conference (Chengdu 17 th October, 2006 ) Shinzaburo Matsuda Japan.
ELBE Neutron Source IAEA TC Meeting “Nuclear Data for IFMIF”, FZ Karlsruhe, October 4-6, 2005 Klaus Seidel Technische Universität Dresden.
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
SESAME Synchrotron Light for Experimental Science and Applications in the Middle East JSPS Asien Science Seminar Synchrotron Radiation Science Dieter Einfeld.
Martin Freer Materials Irradiation at University of Birmingham.
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
Jefferson Lab Strategic Planning Divisional Town Meeting Mission Statement of your Division – What is or should be the mission statement of your division?
EURISOL – Distributed Facility (DF) Y. Blumenfeld, M. Lewitowicz, P. Van Duppen, A. Maj Background : EURISOL RTD : EURISOL Design Study.
Chipir A new neutron single event test facility at the UK’s ISIS Neutron and Muon Source.
Potential Portuguese Contributions to the ESS Project Areas and topics of interest for the ITN Pedro Vaz (ITN) Workshop “Towards a Portuguese Participation.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
Facilities at the Nuclear Physics Institute Academy of Sciences of the Czech Rep., Řež.
IAEA International Atomic Energy Agency Education & Training in Nuclear Installation Safety web: goto.iaea.org/nis-traininggoto.iaea.org/nis-training contact:
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
PARIS21 Steering Committee26 April 2006 PARIS21 Steering Committee, Paris, 26 April 2006 PARIS21 Work Programme for 2006.
The Materials Test Station Eric Pitcher Los Alamos National Laboratory Presentation to: AHIPA Workshop, Fermilab October 19, 2009.
The Materials Test Station: An Accelerator Driven Neutron Source for Fusion Materials Testing Eric Pitcher Presented at: Sixth US-PRC Magnetic Fusion Collaboration.
Scope and Project Plan of IFMIF/EVEDA Presented by Masayoshi SUGIMOTO (IFMIF/EVEDA Project Team, Deputy Leader/ JAEA) IAEA’s Technical Meeting on Nuclear.
February 21-21, 2008JINR Scientific Council 103-d session IREN project status.
Beam test possibilities at JINR and Fermilab V. Pronskikh Fermilab 02/15/2012.
KIT – University of the State of Baden-Württemberg and Large-scale Research Center of the Helmholtz Association Institute for Neutron Physics.
M. Štefánik *), P. Bém, M. Honusek, K. Katovský, M. Majerle, J. Novák, and E. Šimečková AER Working Group F – „Spent Fuel Transmutation“ and INPRO IAEA.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
ATTRACT is a proposal for an EU-funded R&D programme for sensor, imaging and related computing devlopment Its purpose is to demonstrate the value of European.
NIPNE, April 4, 2007 Contact: Neutrons For Science (NFS) at SPIRAL-2 ● The spiral 2 project ● Neutron production modes ● Design ●
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
IFMIF d-Li neutron source: Status of codes and nuclear data S.P. Simakov Institut für Reaktorsicherheit, Forschungszentrum Karlsruhe IEA Neutronics Meeting,
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Overview on the Proposal for a new GIF, August Page 1 Overview on the Proposal for a new GIF Summary of the document distributed to the users and.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Christos Lamboudis HEP April. Athens Study of MDT response to neutrons and possible ageing effects Do we really need to worry about neutrons? Do.
THE INTRODUCTION AND SUPPORT OF RESEARCH PROJECTS AS PART OF THE FUTURE ROLE OF THE RCARO Dr Waqar Ahmad Dr John Easey.
UCN and SCRF/ISAC interface issues ● proposal for UCN (CFI, 2008) – 10 uA at 25% duty cycle (1 min on, 3 min off) – use BL4A (TISOL) ● duty cycle is incompatible.
CALIFES A proposed electron beam test facility at CERN
Fusion Neutronics, Nuclear Data, Design & Analyses
The BLAIRR Irradiation Facility Hybrid Spallation Target Optimization
Updating the Regulation for the JINR Programme Advisory Committees
S. Bartalucci, R. Bedogni , B. Buonomo, A. Esposito , G. Mazzitelli, L
The European Strategy for Particle Physics
Input to Strategy currently planned
for the EURISOL Steering Committee
n_ToF dump as a facility for Neutron Radiation Testing
Cross-section Measurements of (n,xn) Threshold Reactions
LIPAc Control System Reliability improvements
Workshop on Advanced Neutron Source and its Application
Advanced-Fusion Neutron Source
Electron Beamlines Safety Workshop at ELI Beamlines April 2016
Introduction to the Workshop
Summary of session 5: Innovative Ideas and New R&D
DONES: DEMO-Oriented Neutron Source Workshop on Advanced Neutron Sources and its Applications. Aomori (Japan) November 4-5, 2017 A. Ibarra (CIEMAT) representing.
nuSTORM and the Physics Beyond Colliders workshop
NPL accelerator facility
MLS (Metrology Light Source) and the Willy-Wien-Laboratory – Status Report Ralph Lange (BESSY) Titel des Kapitels: ITC Franklin Gothic LT, Bold, 11 Punkt,
Present and Future test facilities for High-intensity Targetry CERN
A. Ibarra and The WPENS team
Test Beamline System Requirements and Charge to PDR Committee
Laser Und XFEL.EU Experiment
IFMIF/DONES Project: opportunities for the industry
Presentation transcript:

Complementary Experiments at DONES Further potential for using fast neutron sources Complementary Experiments at DONES W. Królas, A. Ibarra, A. Maj, F. Arbeiter Activities of the WPENS Early Neutron Source work package (2015-20) of EUROfusion White Book on the „Complementary Scientific Programme at IFMIF-DONES” (2016) Decision: Extension of DONES scope by adding „Complementary Experiments” areas

DONES Complementary Science Program The ELAMAT Consortium which was preparing the bid to site DONES in Poland proposed to extend the objectives of IFMIF-DONES beyond fusion materials studies An international science committee was formed, meetings were held during which various scientific areas were considered as complementary research topics.

DONES Complementary Science Program The ELAMAT Consortium which was preparing the bid to site DONES in Poland proposed to extend the objectives of IFMIF-DONES beyond fusion materials studies An international science committee was formed, meetings were held during which various scientific areas were considered as complementary research topics. Their feasibility and compatibility with the main DONES role must be evaluated

DONES Complementary Science Program The ELAMAT Consortium which was preparing the bid to site DONES in Poland proposed to extend the objectives of IFMIF-DONES beyond fusion materials studies An international science committee was formed, meetings were held during which various scientific areas were considered as complementary research topics. „A White Book report on on the Complementary Scientific Programme at IFMIF-DONES” IFJ PAN Report No. 2094/PL, 2016 Eds. A. Maj, M.N. Harakeh, M. Lewitowicz, A. Ibarra, W. Królas https://www.ifj.edu.pl/publ/reports/2016/2094.pdf Adapted by the EUROfusion WPENS work package as Technical Report EFDA_D_2MP66K

Complementary Experiments: Boundry conditions Main DONES mission: irradiation of fusion materials Complementary experiments could use: Neutrons available behind the Irradiation Module either inside the Test Cell or in a dedicated additional experimental hall Deuterons extracted from the accelerator beam but only a small fraction (a few percent) Courtesy of U. Fischer Flux region behind High Flux Test Module with HFTM in place and removed

Complementary Experiments Areas: White Book proposal C. A second 40 MeV deuteron beam line using 1/100 to 1/1000 beam-pulse selector to a neutron Time-of-Flight facility – feasibility must be verified! C. B. B. A 5 MeV deuteron beam line using 1/100 beam-pulse selector to a low-energy irradiation facility A. A. Irradiation facility and ISOL RIB facility behind the HFTM; Collimated beam facility with an 8 m long neutron line

Complementary Exp Area Complementary Experiments Area (option A) incorporated into the DONES building design Complementary Exp Area Room R160 Dimensions 29.00 m x 11.40 m, height 8.00 m, 330.60 m2 Auxiliary Room R163 7.00 m x 5.07 m, 35.37 m2 40 MeV deuteron beam arrives from this direction Part of the DONES first floor plan (as in the PEDR) Ongoing discussion on shielding, arrangement of experimental setups in R160 Other remaining proposals (deuteron beam kicker at 5 or 40 MeV) are on-hold pending feasibility confirmation and external user interest