* Amendment to Appendix P to ensure correct treatment of Interconnector Unit Offer Data 29th May 2012 * 1##

Slides:



Advertisements
Similar presentations
INTRA-DAY TRADING: Conference Call COD for Interconnector Units in WD1 Ending Overlap Optimisation Period (EOOP) 29 November 2011.
Advertisements

Mod_34_11 : Transition to SEM Intra-Day Trading 6 December 2011.
Make Whole Payments Modification Proposals Modifications Committee Meeting 04 December 2014.
Overview of Make Whole Payments Modifications Committee Meeting February 2015.
Modifications Committee Mod_18_10: Intra-Day Trading 25 November 2010.
FAST Procurement and Pricing May 28, 2015 TAC Meeting 1.
INTRA-DAY TRADING DESIGN Future Options for Limited Communication Failure (LCF) 27 September 2011.
Mod_18_10 Intra Day Trading Conference Call Commercial Offer Data for Interconnector Units in Ending Overlap Optimisation Period (EOOP) for WD1 MSP Software.
INTRA-DAY TRADING Development of Modification(s) 1st February 2011.
Evaluation of Proposals for New Rules for Energy Storage Gaelectric Energy Storage T&SC Modification Working Group 23 rd October 2012.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Transfer & Trades Special Transmission Workstream
SEM – One Year On Liam Ryan, Market Operations Manager.
INTRA-DAY TRADING Modification Development 5 April 2011.
INTRA-DAY TRADING DESIGN Changes required to the MIUN Calculation for SEM Intra-Day Trading 27 March 2012.
1 Mod_18_10 : Intra Day Trading in the SEM Working Group 4 August 19 th 2010 SEMO High-Level Impact Assessment.
Mod_18_10_v2 : SEM Intra-Day Trading 6 December 2011.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
Carrie Tucker Supervisor, Day-Ahead Market DAM data supporting MCWG/CWG credit parameters discussion February 29, 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Intraday Trading March RAs raised a Modification (18_10) in March 2010, proposing the implementation of “intra-day trading” in the SEM. The Modifications.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Impact Assessment Mod_17_12 : Report on Offered Capacity in Implicit Auctions 24 October 2012.
Gemini Release 4 UKLC Update 8 th February Gemini Release 4 – UKL13820  UK Link Committee is requested to approve the following:  Implementation.
CRR Deration and NPRR821 WMS 09/06/2017.
Market Continuity Update to TAC Joel Mickey
GSR022: Review of Security and Economy Required Transfer Conditions
Entry Capacity Overrun price calculation
Capacity Conversion – 616s
a market for oranges overview: each round overview: transacting
Best-fit bin packing in O(n log n) time
First Article Test (FAT) / Production Lot Test (PLT)
Options Defined This class is a production of Safe Option Strategies © and the content is protected by copyright. Any reproduction or redistribution of.
slope - describes the steepness of a line
Drawing Quadratic Curves
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 12th December 2017.
Pay for Performance Regulation
Capacity Market Code Committee Meeting
Correction of Minor Material Drafting Errors
Contract Refusal Contract Refusal is a process associated with participant’s ex-ante trading behaviour; It relates to how the Traded Not Delivered element.
Part B Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
TSC Modifications Panel Meeting
Review of the requirements regarding Unsecured Bad Debt within I-SEM
Objectives Find the zeros of a quadratic function from its graph.
Update to Unit Under Test Process
MOD_21_18 Application of Settlement Reallocation Agreements to Market Operator Charges and Settlement Document Definition and Usage 21st June 2018.
Chapter 18: Non-Firm Quantities
Transmission Workgroup June 7th 2012
Mod_25_18 Unsecured Bad Energy Debt and Unsecured Bad Capacity Debt
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
CMC_04_19 Finalisation of Exchange Rate in Auction Information Pack
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – User Pays Options Review Group August th November.
Credit Cover Signage and Subscript Correction
Capacity Market Code Committee Meeting
Capacity Market Code Modifications
Entry Overrun Calculation
MOD_05_19_V2 Amendment to Uninstructed Imbalance Charge (CUNIMB) to correct for negative price scenarios 11th April 2019.
Capacity Market Code Modifications
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 25th January 2018.
Commercial Arrangements For Gas Quality Service – Introduction
Groups and Periods.
Interconnector trading in SEM 7th June 2007
The Coordinate Plane #39.
Off-peak interruptible service to compliment universal firm/buy-back regime Peter Bolitho.
Captured Carbon Renewable Energy Route to Market Consultancy Trading.
Capacity Market Code Modifications
Presentation transcript:

* Amendment to Appendix P to ensure correct treatment of Interconnector Unit Offer Data 29th May 2012 * 1##

Introduction As Interconnector Units can submit negative Prices or Quantities, Market Exposure can occur where Commercial Offer Data (COD) includes: Positive Prices and negative Quantities (units offer to pay to Export); or Negative Prices and Positive Quantities (units offer to pay to Import). Participant pays To Export to Import Participant paid to Export Price Quantity SEM Credit Exposure 2

Sufficiency Check The sufficiency check is the process by which it is verified that enough ACC is in place to cover the Offered Exposure at each GWC. Where ACC is insufficient, those elements of COD that create an unsecured credit risk, will be excluded at the relevant GWC. 3

Offered Modified PQ Pairs Following the sufficiency check the Accepted PQ Pairs become Offered Modified PQ Pairs. This is regardless of any modification being applied. Where ACC is sufficient: Temporary Points are deleted Accepted PQ Pairs = Offered Modified PQ Pairs 4

X X X X Offered Modified PQ Pairs LLQ HLQ Accepted PQ Pair = Offered Modified PQ Pairs Temporary Point Deleted points or Excluded PQ Pairs Example 1: ACC > Total Offered Exposure X P Price Axis Crossing Point X X P3Q3 P4Q4 LLQ Point HLQ Point P2Q2 X P1Q1 Q LLQ EA1= max(MIUEC,AIUECH) EA2 and WD1 = MIUEC HLQ EA1= min(MIUIC,AIUICH) EA2 and WD1 = MIUIC 5

Offered Modified PQ Pairs Where ACC is insufficient : Temporary Points are deleted. All bids up to and including the area of Energy Offered Exposure are excluded. Accepted PQ Pairs ≠ Offered Modified PQ Pairs. The remaining non excluded PQ Pairs are renumbered. The Low Limit Quantity is set to zero to prevent any Export. 6

X X X X X X X X X Offered Modified PQ Pairs PQ Pairs Temporary Point Deleted points or Excluded PQ Pairs Renamed PQ Pairs X Example 1: ACC < Total Offered Exposure X P Price Axis Crossing Point X X X P3Q3 X P4Q4 P2Q2 P1Q1 P2Q2 X LLQ HLQ X P1Q1 X Q LLQ Export Exposure HLQ 7

Interconnector User offers in top left quadrant only P2Q2 P1Q1 Q Maximum Interconnector Unit Export Capacity Maximum Interconnector Unit Import Capacity 8

X X X Current Treatment Excluded PQ Pairs P ACC < Total Offered Exposure No offers in right top quadrant P2Q2 X HLQ P1Q1 X Q LLQ Import also excluded Export excluded HLQ 9

X X X X X Proposed Treatment Excluded PQ Pairs Additional PQ pair ACC < Total Offered Exposure No offers in right top quadrant Additional PQ pair inserted if highest Q index <=0 P Additional PQ pair inserted P2Q2 X X HLQ P1Q1 X P1Q1 Q LLQ=0 Export excluded Import allowed HLQ 10

Questions and Discussion 11