Ozcan: Chapter 6 Reengineering

Slides:



Advertisements
Similar presentations
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J S10-1 Operations.
Advertisements

Slack, Chambers and Johnston, Operations Management 5 th Edition © Nigel Slack, Stuart Chambers, and Robert Johnston 2007 Chapter 9 Job design and work.
Ozcan: Chapter 6 Reengineering (Overview)
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Design of Work Systems.
Time Study Procedure - Overview
Time and Motion Study Tolga Sayılkan Time and Motion Study: Defined A method created to determine the ‘correct time’ it takes to complete.
Designing Adaptive Organizations
Design of Work Systems McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
2000 by Prentice-Hall, Inc1 Chapter 17 - Human Resources in Strategic Planning  TQM recognizes importance of employees  Education & training viewed as.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 8 Human Resources in Operations Management.
Maintenance Work Measurement
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Design of Work Systems.
Work Design and Measurement
Direct Time Study Chapter 13 Sections: Direct Time Study Procedure
McGraw-Hill/Irwin © 2004 The McGraw-Hill Companies, Inc. All rights reserved
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Chapter 6. Reengineering
Chapter 11 Work System Design.
Human Resources in Operations
Work Design and Measurement Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent.
Dr. Joan Burtner, CQE Associate Professor of Industrial Engineering and Industrial Management ISE 468 Healthcare Process Improvement.
7 Design of Work Systems.
Operations and Supply Chain Management, 8th Edition
7-1Design of Work Systems William J. Stevenson Operations Management 8 th edition.
4. Time Study The major objective of this chapter is to learn how to calculate a time standard based on stopwatch time study procedures.
7-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
ETM 627 Fall 2014 Dr. Joan Burtner The Certified Manager of Quality/ Organizational Excellence 3 rd Edition Westcott, ed. Chapter 8 Management Skills and.
Human Resources in Operations Management Kusdhianto Setiawan.
2000 by Prentice-Hall, Inc 1 Materi MO sesudah UTS Human Resources in Operations Management Human Resources in Operations Management.
© The McGraw-Hill Companies, Inc., Technical Note 4 Job Design and Work Measurement.
Work Design and Measurement McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Work Design and Measurement McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Work Design and Measurement Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent.
- For 6 th Semester Job Design, Production and Operations Standards, and Work Measurement.
“Time study is the one element in scientific management beyond all others making possible the transfer of skill from management to men…..” – Frederick.
Company LOGO Work Measurements Lab # 5. Outline 1. Work Study 2. Method Study 3. Work Measurement 4. Time Study 3. Standard Time June 4, 20162Lab # 5:
Job Design Job design involves specifying the content and methods of job What will be done Who will do the job How the job will be done Where the job.
Ozcan: Chapter 6 Reengineering Dr. Joan Burtner, Certified Quality Engineer Associate Professor of Industrial Engineering and Industrial Management.
4e Nelson/Quick ©2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
Organizational Design, Diagnosis, and Development Session 20 Techno-structural Interventions, III Work Design.
Work Measurement Vital inputs for: Standard Time
ENG M 501 Production and Operations Management Chapter 6A Job Design and Work Measurement Lecture 04a: 27 January 2009 John Doucette Dept. of Mechanical.
Company LOGO Work Measurements Lab # 5. Outline 1. Work Study 2. Method Study 3. Work Measurement 4. Time Study 3. Standard Time February 17, 20162Lab.
History of Management Thought
7-1Design of Work Systems  Job design involves specifying the content and methods of job. IN general the goal of the job design is to create a work system.
7-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
IE 366 Chapter 24 Time/Job. IE 366 Work Measurement ● Goal: determine standard time for a task. ● Techniques – Direct Time Study – Predetermined Time.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
Job Design and Work Measurement
7 Design of Work Systems.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Motivation I: Needs, Job Design
7 Design of Work Systems.
Ozcan: Chapter 9 Productivity Lecture 2
Introduction to Methods Engineering
Analyzing Work and Designing Jobs
Operations Management Work Measurement Supplement 10
JOB DESIGN Work Measurement.
Chapter 7 Design of Work Systems McGraw-Hill/Irwin
ISE 468 Healthcare Process Improvement
ISE 491 Healthcare Process Improvement
Introduction to Work Measurement
(Lecturer in Mech. Deptt.)
ISE 468 ETM 568 Spring 2017 Dr. Joan Burtner
CH-5-Motion and Time Study
Work Measurements Lab # 5.
Production and Operations Management
Summer Training Industrial Engineering Department
Time and Motion Study Rebecca Johnston Operations Management
Presentation transcript:

Ozcan: Chapter 6 Reengineering Dr. Joan Burtner, Certified Quality Engineer Associate Professor of Industrial Engineering and Industrial Management

Ozcan’s Description of Reengineering Chapter 6 Topics Ozcan’s Description of Reengineering Work Design in Health Care Organizations Work Design Job Design Work Measurement - Standard Times Stopwatch Time Studies Standard and Predetermined Times Work Measurement Using Work Sampling Determination of Sample Size Work Simplification Flow Chart Work Distribution Chart Flow Process Chart Worker Compensation ISE 468 ETM 568 Dr. Joan Burtner Ozcan Ch. 6

What is Reengineering? (Traditional Interpretation) Reengineering is a methodology that promotes the radical redesign of business processes Goal to achieve dramatic improvements in performance measures Quality and cost Service Speed Hammer, M., & Champy, J. (1993). Reengineering the corporation: A manifesto for business revolution. New York: Harper Business. ISE 468 ETM 568 Dr. Joan Burtner Ozcan Ch. 6

What is Reengineering ? (Ozcan Interpretation 1) Reengineering is a methodology intended to overcome the difficulty in realizing TQM/CQI performance over a long duration, as well as the myopic conduct of organizational change, restructuring and downsizing. To reengineer the system, healthcare managers must be able to understand work-design, jobs, job measurement, process activities, and reward systems – all well known concepts of industrial engineering. With that knowledge, they can recognize the bottlenecks in the old system, identify unnecessary and repetitive tasks, and eliminate them. ISE 468 ETM 568 Dr. Joan Burtner Ozcan Ch. 6

What is Reengineering? (Ozcan Interpretation 2) Reengineering is a strategic view of arranging, delivering and managing care Requires changes across departmental, organizational, operational, and administrative procedures Results in a new way of thinking that produces a comprehensive, integrated, and seamless process that is centered on the patient Breaks down silo mentality among departments through examination of common processes Leads to a waste-free health care delivery system by adding value to service processes without adding additional resources “Lean Health Care” ISE 468 ETM 568 Dr. Joan Burtner Ozcan Ch. 6

Importance of Work Design Human resources/manpower represents over 40% of healthcare facility budgets (Ozcan page 123) Human resource management issues Productivity and satisfaction of staff involves an understanding of the work environment Work must be designed so that employees are happy, organizational productivity is high, and costs are minimized ISE 468 ETM 568 Dr. Joan Burtner Ozcan Ch. 6

Work Design- A Systems Perspective External Factors Work Measurement Time Study Predetermined Standard Work Sampling Job Design Who? How? Where? Job Simplification Worker Compensation Time Based Output Based Incentive Plans Source: Ozcan Figure 6.1 ISE 468 ETM 568 Dr. Joan Burtner Ozcan Ch. 6

Brief History of Job Design Frederick Taylor (1911) Developed scientific management approach Focused on time studies Asserted that conflicts between labor and management occurred because management had no idea how long jobs actually took Frank and Lillian Gilbreth (1920’s and beyond) Motion studies Routine, predictable, repetitive, separable tasks Herzberg (1959) - satisfiers and dissatisfiers ISE 468 ETM 568 Dr. Joan Burtner Ozcan Ch. 6

Socio-technical School Approach Behavioral School (Human Focus) Efficiency School (Technical Focus) Focus on satisfying needs and wants of workers Focus on improving productivity and efficiency Socio-technical School ISE 468 ETM 568 Dr. Joan Burtner Ozcan Ch. 6

How can jobs be improved? – Behavioral School Job enlargement-- give workers a larger portion of the total task (horizontal loading-- additional work at same level of skill and responsibility) Job enrichment-- increasing responsibility for planning and coordinating tasks (vertical loading) Serving on strategic planning committees Leading a continuous quality improvement project Ideally leads to greater job satisfaction and autonomy Job rotation-- workers periodically exchange jobs (limited applicability in healthcare) ISE 468 ETM 568 Dr. Joan Burtner Ozcan Ch. 6

Work Measurement Using Time Standards Time standards are important in establishing productivity measures, determining staffing level and schedules, estimating labor costs, budgeting, and designing incentive systems A time standard represents the amount of time needed for the average worker to do a specific job working under typical conditions ISE 468 ETM 568 Dr. Joan Burtner Ozcan Ch. 6

Standard Time Development The amount of time it should take a qualified worker to complete a specified task, working at a sustainable rate, using given methods and equipment, raw materials, and workplace arrangements is called a standard time. Standard time can be developed through: Stop-watch studies Historical times Predetermined data Work sampling ISE 468 ETM 568 Dr. Joan Burtner Ozcan Ch. 6

Stopwatch Time Studies Take time over a number of trials (cycles) Workers should be educated regarding the process to avoid suspicion and avoid the Hawthorne Effect Number of cycles to time (i.e., sample size) variability in observed times desired accuracy desired level of confidence for the estimate ISE 468 ETM 568 Dr. Joan Burtner Ozcan Ch. 6

Determining Sample Size Accuracy desired may be explained by the percentage of the mean of the observed time. For instance, the goal may be to achieve an estimate within 10 percent of the actual mean. The sample size is then determined by: where: z = number of std. dev. needed for desired confidence s = sample std. dev. a = desired accuracy xbar = sample mean Desired 2-sided Confidence Z-value 90 1.65 95 1.96 98 2.33 99 2.58 ISE 468 ETM 568 Dr. Joan Burtner Ozcan Ch. 6

An Alternative Formula Desired accuracy may be expressed as an amount (e.g., within one minute of the true mean). The formula for sample size becomes: where e = Accuracy or maximum error acceptable To make an initial estimate of sample size, you should take a small number of observations and then compute the mean and std. dev. to use in the formula for n. ISE 468 ETM 568 Dr. Joan Burtner Ozcan Ch. 6

Example 6.1 A heath care analyst wishes to estimate the time required to perform a certain job. A preliminary stopwatch study yielded a mean of 6.4 minutes and a standard deviation of 2.1 min. The desired confidence level is 95 percent. How many observations will be needed (including those already taken) if the desired maximum error is: a) +/- 10 percent? b) one-half minute? a) b) ISE 468 ETM 568 Dr. Joan Burtner Ozcan Ch. 6

Determining the Standard Time – Normal Time Observed Time-- average of observed times OT = åxi/n Normal Time-- observed time adjusted for worker performance NT = OT * PR (where PR = performance standard measured for the entire job) NT = å(Ej*PRj) (where PR is measured element by element) PR equals 1 for the average worker; PR< 1 is for a slower worker ISE 468 ETM 568 Dr. Joan Burtner Ozcan Ch. 6

Allowance Factor Standard time equals normal time multiplied by an allowance factor ST = NT * AF Allowance Factor accounts for personal delays, unavoidable delays, and/or rest breaks AFjob = 1+A, where A= allowance percentage based on job time AFday = 1/(1-A), where A = allowance percentage based on work day ISE 468 ETM 568 Dr. Joan Burtner Ozcan Ch. 6

Allowance Factor Computations Compute the allowance factor if: The allowance is 20 percent of job time. The allowance is 20 percent of work day. A) AF = 1 + A = 1.20, or 120% B) AF = 1/(1-A) = 1/(1-.2) = 1.25 = 125% ISE 468 ETM 568 Dr. Joan Burtner Ozcan Ch. 6

Table 6.1 Typical Allowance Percentages for Varying Healthcare Delivery Working Conditions Allowance Level Percent 1. Basic-low (personal, fatigue, standing) 11 2. Basic-moderate (basic-low and mental strain) 12 3. Basic-high (basic-moderate and slightly uncomfortable heat/cold or humidity 14 4. Medium-low (basic high and awkward position) 16 5. Medium-moderate (medium-low and lifting requirements up to 20 lbs.) 19 6. Medium-high (medium-moderate and loud noise) 21 7. Extensive-low (medium-high and tedious nature of work) 23 8. Extensive-medium (extensive-low and with complex mental strain) 26 9. Extensive-high (extensive-medium and lifting requirement up to 30 lbs.) 28 Source: Adapted from B.W. Niebel, 1988. ISE 468 ETM 568 Dr. Joan Burtner Ozcan Ch. 6

What are the problems with time studies? Subjective performance ratings and allowances Only observable jobs can be studied Highly costly -- best for repetitive tasks Disrupts worker routine May cause worker resentment Ozcan, Y. (2009). Quantitative Methods in Health Care Management 2nd ed, San Francisco, CA: Jossey-Bass. ISBN-13 978-0-470-43462-8 ISE 468 ETM 568 Dr. Joan Burtner Ozcan Ch. 6

Source Ozcan, Y. (2009). Quantitative Methods in Health Care Management 2nd ed, San Francisco, CA: Jossey-Bass. ISBN-13 978-0-470-43462-8 ISE 468 ETM 568 Dr. Joan Burtner Ozcan Ch. 6