TPC Field Cage Progress Report

Slides:



Advertisements
Similar presentations
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
Advertisements

Michael Hoch / EP-AIT1 TPC Resistor Rod. Michael Hoch / EP-AIT2 Resistor Chain: Design Constrains  current per resistor chain: 241  A = 25W (total =
Machine Tools And Devices For Special Technologies Plasma machining Slovak University of Technology Faculty of Material Science and Technology in Trnava.
ALICE TPC field cage status Sardinia May 2004 Michael Hoch Cern-TA2.
1 Potential Hardware Improvements, Related R&D Wieman RNC LBNL TPC Review Friday 6 October 2006.
DESIR Progress Report DESIR hall details defined for civil construction: - compressed air, liquid nitrogen, cooling water, etc detailed layout of RFQ-HRS.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
Rainer Renfordt IKF Frankfurt TPC meeting 10/11December GSI Low Voltage System for the Alice TPC " Test of Wiener PL500 supply " Alternative scenario:
GTK Cooling Summary of frame and cooling plate Shear tests Alessandro Mapelli Michel Morel Jerome Noel Georg Nüßle Paolo Petagna Giulia Romagnoli GigaTracKer.
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
ALICE-LHCC Review January 29-30, 2001 Thomas C. Meyer/EP-AIT1 General Layout Four separate vessels: –Outer containment vessel –Inner containment vessel.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
TPC-Meeting : Københaven Ne-CO 2 Gas System : Status CO 2 - Gas System : Insulating Gap Resistor Rod : –Contacts –Cooling --> Liquid –Cooling -->
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
TB Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Design and Technical Challenges of the ILC Small Angle Interaction Regions October 19 th, 2006J. Borburgh, CERN, AB/BT Electrostatic separator limits With.
ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT1 TPC Field Cage Progress Report Project Schedule Technical Progress & Prototyping Contractual Matters.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
ALICE TPC Status, Meeting with LHCC referees ALICE TPC – Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader:
TPC R&D status in Japan T. Isobe, H. Hamagaki, K. Ozawa, and M. Inuzuka Center for Nuclear Study, University of Tokyo Contents 1.Development of a prototype.
Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 1 Pre-installation and Functional Tests StartFinish  Certification of field cage…………………
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
We can…. 2 GLOBAL REFERENCES Rev: 00 References :
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
CMS Upgrade Workshop, FNAL, Nov 19-21, O.Prokofiev CMS Upgrade Workshop Updated ME4/2 chamber construction costs and prototype Status and plans.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Concept Design for LBNF Far detector (LAr single phase)
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
 1) Introduction  2) GEANT simulations  3) NEW DESIGN : Technology and Assembly  4) Conclusions Reported by G.Feofilov, CBM meetings, Dubna.
T2 GEM Production in Helsinki Kari Kurvinen TOTEM T2 EDR meeting Radiation Detector Laboratory of Helsinki Institute of Physics (HIP) and Department.
NSS2006Shengli Huang1 The Time of Flight Detector Upgrade at PHENIX Shengli Huang PHENIX Collaboration Outlines: 1.Physics motivations 2.Multi-gap Resistive.
Single Phase ProtoDUNE TPC QA/QC Plans The SP TPC Team Jan. 13, 2016.
Recent Changes to the FD TPC Design Bo Yu Oct. 20, 2015.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Single Phase ProtoDUNE TPC CERN The SP TPC Team Jan. 13, 2016.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institut für Experimentelle Kernphysik
A High Eta Forward Muon Trigger & Tracking detector for CMS A High Eta Forward Muon Trigger & Tracking detector for CMS Archana Sharma For CMS High Eta.
Phenolic glass based materials for the RPC electrodes RPC2016 Het Pand GENT R. Santonico INFN and University of Tor Vergata, Rome, Italy On behalf of the.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
What’s new at LAL-LLR ( MDI issues) M.Jore, C.Clerc Visit at CMS Forward detectors meeting at LLR Vacuum in Beam pipe, first LAL results.
Combined Hot-Smoking & Cooking Installation
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
(On Behalf of CMS Muon Group)
Dept. of Physics and Space Sciences, Florida Institute of Technology
Quality Control Chamber Production
Pre-installation and Functional Tests
Manufacturing of the first FCC-hh beam screen prototype for ANKA
INSTALLATION SEQUENCE
First tests on the roll-formed field cage.
Requirements of the support mechanics
of secondary light ion beams
of secondary light ion beams
COOLING & VENTILATION INFRASTRUCTURE
MicroMegas Mechanical Meeting --- Cern April 2014
East Hall under construction
TPC Support and Constraint TPC Support
L 25 Electricity & Magnetism [2]
TPC Detector Control System
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
(On Behalf of CMS Muon Group)
TEC assembly and commissioning at Lyon
East Hall under construction
Presentation transcript:

TPC Field Cage Progress Report Project Schedule Technical Progress & Prototyping Contractual Matters ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT

Field Cage: Project Schedule ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT

Tests & Prototyping HV Temperature stabilization Construction material High ionization behavior (83Kr) Temperature stabilization Resistor chain cooling Construction material Compatibility and leaks Electrical network “From strip to central electrode” ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT

High Voltage Stability History: Field cage was exposed to >16 x expected average charged particle intensity in CERES beam (~ 6000/cm2 s). Field cage was operated at 1.78 x nominal drift field (~700 V/cm) in pure CO2. Surface charge phenomena appearing at 60 kV (≥ 400 V/cm). Insulation gap safe at ≥ 100 kV. ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT

High Intensity 83Kr Test Inject 83Kr with 300 MBq total intensity into field cage (May 2001) Separate tests for drift and insulation volume. ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT

Temperature Stability History: Require: DT everywhere ≤ 0.1 ºC Resistor rod produces 60 W waste heat. Liquid cooling (H2O) proven very efficient with negligible gradient inside rod but… H2O unsuitable at HV (dissociation), Inert liquids dangerous in case of leaks. New approach: Gas cooling ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT

Resistor Rod: Gas Cooling Unlike liquid cooling, DT inside rod always > 0.1 ºC. --> must insulate rod! Foam for test Double wall for ALICE. T [ºC] z [m] Ambient level 2.5 ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT

Gas Cooling: Results Inside of rod achieve Dtmin of 7 ºC with 20 m3/h of air: Tin = 16 ºC 7 ºC ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT

Gas Cooling: Results Outside of rod achieve required DT of ≤ 0.1 ºC within a few cm from rod: Numbers are given in units of 1/100 ºC; Blue numbers indicate zone around rod with DT < 0.1 ºC ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT

Material tests Drying DL/L [µm/m] T[ h] Macrolon Carbon Fiber Kevlar Fiber Glass Fiber Wet Leak test of full-size end plate sector with “CERES” gasket Humidity tests of FC material ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT

Voltage Divider: Central Electrode Focus on “stretched foil” version High modulus carbon-fiber frames NA48 Example ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT

Voltage Divider: Rods & Strips Ongoing prototyping of all rod types Resistor rod HV supply rod Laser rod Regular support rod Verification of strip tension and mounting scheme Vertical or horizontal? ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT

Tooling Modification of DELPHI support frame Needed for construction & assembly of FC Major handling tool for all operations Finished by end of 2001 ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT

Infrastructure: SXL2 Preparation of dedicated clean area for TPC assembly in LHC interaction region 2: Finished by December 2001 Clean zone in hall SXL2 ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT

Contracting: FC Cylinders First „Invitation to Tender“ (IT-2726) was launched on schedule in 2000, but... all offers (4) were above funding level. Changed scope of tender: Only production of individual parts (panels & flanges) Procurement by and assembly at CERN New tender (IT-2999) sent April 2001 6 months delay in schedule ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT

Contracting: End Plates First „Price Inquiry“ was made in 2000. Lowest bid exceeded funding by large factor. Try to achieve savings by… splitting production process (raw material, welding, machining), and design changes. New tenders to be launched this month only if expected savings materialize! Overall production delay ≥ 6 months. ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT

Contracts: Consequences for CERN Higher manpower load on CERN (TA2) Higher risks in terms of… technical failure, quality control, liability, warrenty! schedule slippage, capital loss. We expect to catch up on the baseline schedule during the internal assembly of the FC (2002/3). ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT