A F Cargo Loading System

Slides:



Advertisements
Similar presentations
Opening/Closing Rail Car Plug and Sliding Doors
Advertisements

Color Printer Training
Replacing the Maintenance Kit HP Printers OIT lab services.
Sta-Put Application/Use The Chock Release Handle is located on the opposite side of Lateral Restraint. Step # 1: Step # 1: Holding the Chock Release.
Colchester Student 1800 Basic Operation Manual
IRON MONGERY.
Sta-Put w/ Strap Application/Use Remove the Sta-Put™ device from the side screen Lateral Restraint Application: STEP 1 Chock Release Handle (Red or Green)
Cargo Services Head Office Cathay Pacific Cargo
Rifle Marksmanship C Prone Position & Proper Sling Use INSTRUCTION:
New SCBA Brackets Coming to a fire engine near you.
1 2 STANDING Steps in Building the Position:
Installation Quick Guide AD400 Cylindrical 6/01/13 Doc #
MyLock 644D Service Seminar.
Exercise Machines KIN 436B Spring Easy Stand – Height Adjustment Depress buttons to adjust Adjust machine to accommodate client Slide bar so pin.
Laptop mobile work station. Laptop mobile work station with drawers.
Motorized Tongue Jack Owners Manual Model SAFETY WARNINGS * Read, understand and follow all instructions before installing and/or using product.
Fitness Circuit Mrs. Arland. Circuit Instructions Take your resting heart rate. A healthy range is between beats per minute. Jog anywhere from.
ASSEMBLY INSTRUCTIONS. 2 ASSEMBLY INSTRUCTIONS TOOLS REQUIRED: SIDE CUTTING PLIERS PRY BAR 7/16” & 9/16” WRENCH 3/16” ALLEN WRENCH T-15 TORQUE.
Reduced Vertical Separation Minimum (RVSM)
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Hp LaserJet 9500 Color Printer Training. Toner cartridges (print cartridges) Open the front doors.
PXL insertion 1.PXL Insertion Steps after PXL installation system is aligned 2.PXL removal steps 3.Some design details 2/3/20131 Table of contents:
Airbus A320 Family Configurations
Familiarization with N767A
SQXF Shell & Yoke Assembly Procedure
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
USING THE DRIVE-ON HOIST. LOADING VEHICLE ON HOIST 01. Ensure that vehicle is centered left to right. 02. Make sure vehicle is in Park, parking brake.
Garaventa Evacuation Chair Guidelines Presented by Risk Management Mt. SAC Garaventa Evac-Trac CD7.
Savaria Residential Elevators Crown Park Single Family Homes (Across from the RIO) By: FF3/PM Michael J. Haggerty, 32A.
35’ Ladder Beam Raise Two Person Level I 4/1/12. Introduction This presentation demonstrates the basic operation for a two person beam raise. The evolution.
XYZ 1330 Basic Operation Manual
Rifle Marksmanship C Prone Position & Proper Sling Use INSTRUCTION:
EliminationSubstitutionEngineeringAdministrationPPE Workplace Health & Safety.
Goddard Sailing Association Hunter 27 Cruiser Qualification Course 1.
CORE EXERCISES. Alternating Human Arrow Starting in the same position as the human arrow, raise the left arm and right leg off of the floor. Keep the.
V V RULES OF ENGAGEMENT (ROE) UNCLASSIFIED V Corps Weapons Safety Memorandum - 14 Nov Encl. 1 - Change 11 oAlways treat a weapon as if it were loaded.
Electrical system : Operator station PLC display Engine under operation - Operating the unit is carried out from the Operator Station. - Two rotary switch.
Concept Review - P08001 Balance Training Bicycle Team Members Jennifer Zelasko - IE Carl Mangelsdorf - ME Jeff Tempest - ME James Nardo - ME Jon Bawas.
STEP 1: ASSEMBLE ANGLE PLATES
CH-47D Cargo Handling System
Annex 4 - Moving Frame and Whiffletree assembly
Topic 1.7 Aircraft Salvage Procedures
Jacking The aviation technician must be familiar with the jacking of aircraft in order to perform maintenance and inspection. Jacking procedure is vary.
Automotive Engines Theory and Servicing
UC Davis R. A. Wachter Safety Services
Step 1: Load paper Before you replace the ink cartridges and begin the alignment process, load paper in the printer. 1) Raise the input tray. 2) Remove.
STEP 1: ASSEMBLE ANGLE PLATES
VEHICLE LIFTING AND HOISTING
JI Quick Reference Guide
Excel Basic Operation Manual
Evacuation Chair Safety Training
Evacuation Chair Safety Training
Servicing a Swiss calendar watch with sweep second hand
(Preliminary) WIYN 0.9 Meter Collimation Procedure
Station Ideas Print and laminate these stations or create your own based on your school’s equipment and students’ needs.
What’s Wrong With This Picture?
The Garage Assembly Instruction By Laser Dollhouse Designs
Stationary Balance Training Bicycle - P08001
Rifle Marksmanship C Prone Position & Proper Sling Use INSTRUCTION:
Evacuation Chair Safety Training
310 Series Basic Leveling Procedure
Pre-Deploying Your SPYDERCRANE's Outriggers​
Highland Sportsman Club Skeet & Trap Opening – Closing Instructions
CLEAR FLOOR TWO POST LIFT Operation instruction
Cable Cap.
Automotive Engines Theory and Servicing
Automotive Technology Principles, Diagnosis, and Service
Presentation transcript:

A330-200F Cargo Loading System January 2013 Training 1

A330-200F Cargo Loading System Training 2 Training Operation A330-200F Cargo Loading System Training Operation

Caution Aircraft Floor has kink at Frame C58 Training 3 Training Operation Caution Aircraft Floor has kink at Frame C58 C58.1 FWD 1.375 Degree Pallet Cargo door Pallet Just Before the kink

Caution Aircraft Floor has kink at Frame C58 Training 4 Training Operation Caution Aircraft Floor has kink at Frame C58 C58.1 FWD 1.375 Degree Pallet Cargo door Pallet transiting through the kink

Door Sill Assembly Door Sill Assembly 5 FWD Training Lower the door sill, and the raise side guides & rollout stop (left configuration). FWD

Loading Single Row Door Sill Assembly 6 Training Lower the door sill, and the raise side guides & rollout stop (left configuration).

Door Sill Assembly Door Sill Assembly 7 Training Lower the door sill, and the raise side guides & rollout stop (left configuration).

Single Row Loading 125X96 Or 88X125 Training 8 Single Row Loading 125X96 Or 88X125 1. Lower the Doorsill & raise side guides & rollout stop. FWD 2. Set alignment Guide at the door . 3. Verify all XZ Locks in the Ball Mat area are down and erect YZ Locks 4. Erect Z nose on FWD YZ latches. 2. Lower the Doorsill & raise side guides & rollout stop. 3. Verify all XZ Locks in the Ball Mat area are lowered and YZ Locks in the Ball Mat area are locked down. 4. Raise noted Pivot Rollers & pivots on the Double Overridables.

Park and Lock the pallet Training 9 Door Sill Assembly Park and Lock the pallet Lower the door sill, and the raise side guides & rollout stop (left configuration). Hold the pallet not to move Erect latch by foot or by hand

Tall ULD Loading Single Row AMA Door Sill Assembly 10 Training 10 Door Sill Assembly Loading Single Row AMA Tall ULD Lower the door sill, and the raise side guides & rollout stop (left configuration). Watch for the aircraft ceiling

Training 11 Single Row Loading AMA 1. Lower the Doorsill & raise side guides & rollout stop. FWD 2. Set alignment Guide at the door . 3. Verify all XZ Locks in the Ball Mat area are retracted and erect YZ Locks 4. Erect Z nose on FWD YZ latches. 2. Lower the Doorsill & raise side guides & rollout stop. 3. Verify all XZ Locks in the Ball Mat area are lowered and YZ Locks in the Ball Mat area are locked down. 4. Raise noted Pivot Rollers & pivots on the Double Overridables.

Loading Double Row Door Sill Assembly 12 Training Lower the door sill, and the raise side guides & rollout stop (left configuration).

Double Row Loading 125X96 Or 88X125 Training 13 Double Row Loading 125X96 Or 88X125 1. Erect Splitter to protect Centerline. FWD 2. Set alignment Guide at the door – Totally Lockdown for 96 X125. 3. Verify all XZ & YZ Locks in the Ball Mat area and Retracted 4. Erect Z nose on FWD YZ latches. 2. Lower the Doorsill & raise side guides & rollout stop. 3. Verify all XZ Locks in the Ball Mat area are lowered and YZ Locks in the Ball Mat area are locked down. 4. Raise noted Pivot Rollers & pivots on the Double Overridables.

16’ and 20’ Preparation 16’ and 20’ Loading 16’ and 20’ Unloading Training 14 Agenda 16’ and 20’ Preparation 16’ and 20’ Loading 16’ and 20’ Unloading Summary 16’ and 20’ Loading Instructions

16’ and 20’ Loading Positions Training 15 16’ and 20’ Loading Positions 1. Verify that all positions aft of the 16’ and 20’ pallets are loaded and secured. The 20’ pallets belong in positions CFG, FJG, and JLG. The 16’ pallets belong in positions CFG, FJG, JLR, and LPR.

16’ and 20’ Loading Preparation Training 16 16’ and 20’ Loading Preparation 2. Lower the Doorsill & raise side guides & rollout stop. 3. Verify all XZ Locks in the Ball Mat area are lowered and YZ Locks in the Ball Mat area are locked down. 4. Raise noted Pivot Rollers & pivots on the Double Overridables. 2. Lower the Doorsill & raise side guides & rollout stop. 3. Verify all XZ Locks in the Ball Mat area are lowered and YZ Locks in the Ball Mat area are locked down. 4. Raise noted Pivot Rollers & pivots on the Double Overridables. FWD

16’ and 20’ Loading Preparation Training 17 16’ and 20’ Loading Preparation 5. Lock down Cargo Locks, Splitter, Outboard Restraints, and Lateral Guides. 6. Lower noted Pivot Roller Assemblies. 7. Lock down Center Guides with ball units. 5. Lock down Cargo Locks, Splitter, Outboard Restraints, and Lateral Guides. 6. Lower Noted Pivot Roller Assemblies. 7. Lock down Center Guides with ball units. FWD

16’ and 20’ Loading Preparation Training 18 16’ and 20’ Loading Preparation 8. Retract tongues of all Double Overridable Assemblies. 8. Retract tongues of all Double Overridable Assemblies. FWD

86240-10 Pivot Roller Assembly Pivot Roller Assembly 19 FWD Training Raise the roller (left configuration) at indicated positions, and verify it is lowered in the ball mat area. FWD

86064-10 Pivot Roller Assembly Pivot Roller Assembly 20 FWD Training Raise the roller (left configuration) at indicated positions. FWD

Pivot Roller Cross Track Training 21 Pivot Roller Cross Track 86241-10 Pivot Roller Cross Track / Folding Assy Raise the roller (left) at indicated positions, and verify it is lowered in the indicated positions. FWD

86007-XX Side Restraint Assy Side Restraint Assy 22 FWD Training Lock pawl in the down position (right) by using the lock down handle FWD

86065-10 Splitter Splitter 23 FWD Training Lock splitter in the down position (right) by pulling the lock knob and folding it until the lever catches. FWD

Double Overridable Assembly Training 24 Double Overridable Assembly 86220-10 Double Overridable Assembly FWD Retract the tongue (as shown in top right). The Pivot Roller (86220-10/-11 only) can remain in the upright position, and the Flipper does not need to be adjusted.

16’ and 20’ Preparation 16’ and 20’ Loading 16’ and 20’ Unloading Training 25 Agenda 16’ and 20’ Preparation 16’ and 20’ Loading 16’ and 20’ Unloading Summary 16’ and 20’ Unloading Instructions

16’ and 20’ Loading Procedure Training 26 16’ and 20’ Loading Procedure 1. Bring pallet up to the limit line (red) in the Ball Mat area 2. Rotate the pallet, pivoting it about the Pivot Roller Assembly #1 3. Lift roller 4. Rotate the pallet, pivoting it about the Pivot Roller Assembly #2 5. Lift final two rollers. 1. Bring pallet up to the limit line (red) in the Ball Mat area 2. Rotate the pallet, pivoting it about the Pivot Roller Assembly #1 3. Lift roller 4. Rotate the pallet, pivoting it about the Pivot Roller Assembly #2 5. Lift final two rollers. #2 #1 FWD

16’ and 20’ Loading Procedure Training 27 16’ and 20’ Loading Procedure 6. Move the pallet aft & locate it in position 7. Engage appropriate Double Assembly tongues to secure pallet as each pallet is inserted. May be necessary to rock pallet forward and aft to engage the first lock. Only engage the locks applicable to the installed pallet position. 6. Move the pallet aft & locate it in position 7. Engage appropriate Double Assembly tongues to secure pallet as each pallet is inserted. May be necessary to rock pallet forward and aft to engage the first lock. Only engage the locks applicable to the installed pallet position. #2 #1 FWD

86240-10 Pivot Roller Assembly Pivot Roller Assembly 28 FWD Training Raise the roller (left configuration) at indicated positions, and verify it is lowered in the ball mat area. FWD

Double Overridable Assembly Training 29 Double Overridable Assembly 86220-10 Double Overridable Assembly FWD Reengage the pawl, into the pallet’s pocket (as shown in top left) by engaging the tongue.

16’ and 20’ Preparation 16’ and 20’ Loading 16’ and 20’ Unloading Training 30 Agenda 16’ and 20’ Preparation 16’ and 20’ Loading 16’ and 20’ Unloading Summary 16’ and 20’ Unloading Instructions

16’ and 20’ Unloading Procedure Training 31 16’ and 20’ Unloading Procedure 1. Verify all Cargo Locks are down in Ball Mat area. 2. Verify noted Pivot Roller Assemblies are raised. 3. Verify YZ Locks & Splitter are locked down. 1. Verify all Cargo Locks are down. 2. Verify noted Pivot Roller Assemblies are raised. 3. Verify YZ Locks & Splitter are locked down. #2 #1 FWD

16’ and 20’ Unloading Procedure Training 32 16’ and 20’ Unloading Procedure 4. Move the pallet forward up to the limit line (green). 5. Lower 3 of the pivots. 6. Rotate the pallet. First about Pivot Roller #2, and then about Pivot Roller #1, until the pallet is perpendicular to the CL of the aircraft. 7. Extract pallet from the aircraft. 4. Move the pallet forward up to the limit line (green). 5. Lower 3 of the pivots. 6. Rotate the pallet. First about Pivot Roller #2, and then about Pivot Roller #1, until the pallet is perpendicular to the CL of the aircraft. 7. Extract pallet from the aircraft. #2 #1 FWD