TG Chair: Darrin Willauer Baker Hughes

Slides:



Advertisements
Similar presentations
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
Advertisements

1 Accredited Standards Committee C63 ® - EMC Subcommittee 8 Bob DeLisi Chair
Market Meeting Support Susan Munson ERCOT Retail Market Liaison Commercial Operations Subcommittee (COPS) June 10, 2008.
Current Inspection Process for Operators of Hazardous Liquids Pipelines Rod Seeley OPS SW Region Director May 18, 2005.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Team Manager’s Meeting June 6, Team Managers Duties Our practice is to try and delegate responsibility of portions of the website to the individual.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC-18 Liaison Report TG-3: Definition of.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
San Francisco, CA. SC8 Liaison Report
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
API 19 CI Chemical Injection Devices for Downhole Applications
API 19 CI Chemical Injection Devices for Downhole Applications
TG Chair: Darren Bane (BHI)
ISA-SP99: Security for Industrial Automation and Control Systems
Task Group API 19SS Sand Screens
API SC19 HPHT Template (Proposed as SC19TR1)
TG Chair: Mark Brinsden Shell
Task Group 19LH Liner Hanger Equipment
Updates from SC18 Summer Meeting
School Community Council Implementation Timeline Checklist
API 14L Specification for Lock Mandrels and Landing Nipples
Task Group API 19SS Sand Screens
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
IRPS 2018 Manuscript & Platform Presentation Submission Process
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
API RP 17A - Discussion Points
Submission Title: TG4r Sept 2014 Closing Report
ARTICLE 17 REPORTING 23 MS delivered by end 2007 latest delivery early March 2008 latest second delivery early April 2008.
doc.: IEEE <doc#>
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
Specification on float equipment
RAISING PERFORMANCE. TOGETHERTM
doc.: IEEE <doc#>
September 2002 Project: IEEE P Working Group for Wireless Local Area Networks (WLANs) Submission Title: Liaison Report, September 2002 Date.
Development of a specification
2016 Exploration & Production Summer Standards Conference
Task Group G Report March 10, 2003
IEEE Contribution Author’s Name Affiliation Address Phone
TG3 Review Procedure Proposal
Best Practices Program Contact – Role & Responsibility Overview
February 19 November 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: SG-NAN Closing Report for.
July 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG SRU Opening Information for July 2014]
doc.: IEEE <doc#>
Session # GRIDMAN Opening Report
2016 Exploration & Production Summer Standards Conference
North America Automated Test Equipment Committee
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
IEEE Contribution Author’s Name Affiliation Address Phone
May 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [4md Agenda May 2018 Interim] Date Submitted:
API 10 F.
Discussion Points API RP 17A Task Group Members
API SC 10 WG15 Stage Cementing Collars
March 2018 Project: IEEE P MD
SC 18 Liaison Report Winter 2012
API Subcommittee SC-6 Discussions Valves and Wellhead Equipment
doc.: IEEE <doc#>
doc.: IEEE <doc#>
802.11F Meeting Report March 2002 Month 1998 doc.: IEEE /xxx
May 2019 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Agenda for TG w May 2019 Interim Meeting]
August 19 November 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: SG-NAN Closing Report for Dallas,
Presentation title (including which technology you address)
API SC6 Valves and Wellhead Equipment
[Ballot code, contract number] [Project title]
[Ballot code, contract number] [Project title]
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
Presentation transcript:

TG Chair: Darrin Willauer Baker Hughes API 19 ICV TG Chair: Darrin Willauer Baker Hughes June 14, 2016 Subcommittee 19

Task Group Group: 19 ICV Chair: Darrin Willauer Number of Standards and RPs: 0 Meetings in last 12 months: 1 Date Manufacturers Consultants Operator/User API Staff Total Number 5/31/17 – 6/1/17 10 3 5 1 19 7/26/17 -7/27/17 Total June 14, 2016 Subcommittee 19

Work Group Work group: Workgroup #5 / 19 ICV Chair: Glen Breerwood Standard or RP: Standard (Functional Specifications) Meetings in last 12 months: 1 Date Manufacturers Consultants Operator/User API Staff Total Number 6/13/2017 3 2 5 June 14, 2016 Subcommittee 19

Work Group Work group: Workgroup V Chair: Darrin Willauer Standard or RP: Validation testing Meetings in last 12 months: 0 Date Manufacturers Consultants Operator/User API Staff Total Number TBD in July June 14, 2016 Subcommittee 19

Document Designation Status Conducted initial kick-off meeting Determined document scope Formed two work groups to address validation testing and functional specifications AWES document is being utilized as a starting point for the API document Scheduled follow up meetings for approximately every 2 months Document Title: API 19 Interval Control Valves Scope: Functional, technical and manufacturing requirements inclusive of API monogramming Focus of change: N/A Chair Comments Good interaction of the task group Need to insure document addresses current state of the art and allow future revisions to include new designs Need more representation from the operator’s June 14, 2016 Subcommittee 19

Balloting Plans - Challenges Challenges to meeting the ballot date from Chair/ SC-19 Liaison perspective: Ballot target Mid-2019 June 14, 2016 Subcommittee 19

Questions or Comments? June 14, 2016 Subcommittee 19

Instructions Please add appropriate information in black Please consolidate Task Group information on slide 2 If multiple work groups, please provide a slide for each work group like slide 3 other wise delete from your presentation Please complete the document data sheet (Slide 4) for each document in Task Group Complete Task Group balloting plans (Slide 5) Add one or two personal other slides as appropriate. Keep presentation to 10 minutes max. June 14, 2016 Subcommittee 19

Instructions After each Task Group and Work Group meeting (within two weeks) please post on your designated password protected portion of the API myCommittees web site the following: Meeting minutes Attendees list Latest version of document For help, please contact: Will Freeman; freemanW@api.org June 14, 2016 Subcommittee 19