PRESENTATION BY TRILLIAN PROPOSED EXECUTION PLAN FOR ESKOM’S POWER PLANT IN SOUTH AFRICA DATE: 10.12.15.

Slides:



Advertisements
Similar presentations
Final Competence Assessment Assessment Documents Assessment strategy (SummitSkills) Assessment methodology (SQA) Assessment guidelines (SQA)
Advertisements

版权所有: CMC 1 Sonda-Jherrukh Coal Mine& Power Plant Project.
Annual Inspections of First Nation Water and Wastewater Facilities Derek Hill, P.Eng., Senior Engineer Mohammed Karim, P.Eng., Senior Engineer, Water\Wastewater.
Steam Generation – Operational Flexibility and Lifetime Extension Considerations Kevin Murray Senior Integrity Engineer Marsh Power Forum – Istanbul, October.
Designing and Developing Decision Support Systems Chapter 4.
Indian Affairs, January 9, 2013 introducing BUDGET FORMULATION FY 2015.
Introducing Belliss USA Inc.
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia.
Cleaner Production Assessment (Chapter 4)
Racco industrial consulting working according to investment law to prepare Engineering, Economic, Technology, Environmental Studies for industrial projects.
12 C H A P T E R Systems Investigation and Analysis and Analysis.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Center for Health Care Quality Licensing & Certification Program Evaluation 1 August 2014 rev.
CP methodology adapted to Stockholm Convention Swedish International Development Agency S ESSION 9.C United Nations Environment Program Division of Technology.
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
1 MBA PROJECT Nasir Afghan/Asad Ilyas. 2 Objective To enable MBA students to execute a client focused challenging assignment and to enhance.
New Technical Approach to Classification of Anchor Handling and Diving Support Vessels A. DEVADAS RINA MUMBAI.
Hydrological Monitoring– Status June 2012 Mikaela Kruskopf, TBIWRDP WME, BoARD.
Quality Function Deployment in Maintenance Work Planning by S.O.Duffuaa, A.H.Al-Ghamdi, A.Al-Amer.
Copyright 2006, AMPros Corporation, All Rights Reserved AMPros Overview Business Management Consultancy Minnesota “C” Corporation -
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
 System Development Life Cycle System Development Life Cycle  SDLC Phases SDLC Phases Phase 1: Preliminary Investigation Phase 2: Feasibility Study.
DWA: WATER QUALITY MONITORING TASKS. TENDER DOCUMENT Aim: develop a systematic monitoring protocol that will determine possible impacts of natural and.
Presentation of Energy Efficient Renovation & Modernization (R&M) By H.S.Bedi Sr. Vice President (Power Engineering and Energy Services)
Ontario Region First Nation Water & Wastewater Action Plan Presentation on March 9, 2010 Niagara Falls, Ontario INAC Ontario Region.
Verification of Energy Conservation of Major Energy- Consuming Entities in China DUAN Maosheng Tsinghua University, Beijing, China March 9-10, Seoul.
The global energy landscape and its impact on Bangladesh Dr. Boris Gehring TÜV SÜD Slide 1 13/10/15‘Safe Future Now’ Summit on Power and Energy in Bangladesh.
Economic, Social and Environmental Benefits Better Planning and Operational Decisions in Water Management Decision Making Capacity and Institutions; Stakeholder.
OVERVIEW OF TOOLS & TECHNIQUES: GREEN PRODUCTIVITY R. C. Monga 2nd World Conference on Green Productivity 10 December 2002.
SunSatFriThursWedTuesMon January
Benchmarking Objectives & Practices as Applied by NRECA International Daniel Waddle NRECA International March 8, 2006 World Bank Energy Forum.
Quality Texas Foundation Site Visit Team Closing Meeting January 15, 2014.
Next Generation Nuclear Plant Licensing Strategy William D. Reckley NRC/NRO/ARP March 12, 2009.
Software architecture is the high- level structure of a software system. It has no concrete definition but can be best described as an organizational.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
WORKSHOP CLOSURE. Learning Outcomes Designing for Pedestrian Safety – Workshop Closure 12-2 You should now be able to:  Describe the influence of planning.
GEOTECHNICAL & PILOT TESTING PROFESSIONAL SERVICES RECOMMENDATION Board of Directors – November 19, 2015.
EMR Optimization in a Medical Clinic Environment: An Analysis of IT Support By Lydia Maples Senior Thesis Fall 2014.
ESR Business Intelligence Nick Adcock NHS Senior Development Advisor Turning Data Into Intelligence.
RESIDENTIAL RAINWATER HARVESTING PROJECT ALTITUDE ENGINEERING, INC. PRESENTERS: HAYLIE BREWER, ERICA KIESOW,& BRETT HIGHTOWER DATE: APRIL 28 TH,
Request for Information (RFI) for the provision of a Turnkey Project for an Enhanced Unattended Transmission Substation CORP3430 Date: 4th March 2016.
UNDERSTANDING ISO 9001:2008.
Clean Technology (PB386) Click to edit Master title style Numfon Eaktasang, Ph.D.
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
Long-Term Planning Presented by: APP Site Visit Don Untch
AMPros Overview Business Management Consultancy
EFCOG STARTUP AND COMMISSIONING TASK TEAM INTRODUCTION
Competence of Human Resources for Iran Nuclear Regulatory Authority
(5.1)Development of IMS to fit the organization (step wise)
Western Michigan University Central Power Plant
Sustainability and the Built Environment
GISc Professional Fees
Ministry of Water Resources, River Development and Ganga Rejuvenation
MELD- Maharashtra V. Giriraj
VP for Administration and CFO VP for Academic Affairs
UNIT V QUALITY SYSTEMS.
Zahrani & Selaata IPP Projects
Public Health & Adult Social Care: Public Health Consultant 1
Annual Inspections of First Nation Water and Wastewater Facilities
Clean Technology (PB386) Click to edit Master title style Numfon Eaktasang, Ph.D.
WGARM Appraisal Decision Assistance Phase 1, Dec. 2002
Quality Austria Central Asia
Introduction DEFINATION :-
EQUIPMENT RELIABILITY AT KOEBERG
Basics of Energy Management
Budget: ,00 € (90% Commission contribution)
Session 2: Work Programme of UNECA Related to National Accounts
Pre-Submittal Meeting As Needed Environmental Services RFQ
Presentation transcript:

PRESENTATION BY TRILLIAN PROPOSED EXECUTION PLAN FOR ESKOM’S POWER PLANT IN SOUTH AFRICA DATE: 10.12.15

PROPOSAL OF MANPOWER DEPLOYMENT FOR ESKOM’S POWER PLANT DUVHA POWER PLANT (12) Operation Team(4) Maintenance Team (3) Outage Team (3) System Integration Team (2) Senior Advisor ( 1) Senior Advisor (1) Manager (1) Sr. Manager (1) Principal Consultant(1) Technical Specialist Field (2) Technical Specialist for central Control Room (1) Consultant(1) Senior Advisor (1) Engineers Specialist (1) Technical Specialist (1) Total No. of Persons for One Power Plant: 12

STUDIES TO BE CARRIED OUT FOR IMPROVING EAF BY PROJECT TEAM Present Plant Condition Present Plant Performance level Heat Rate Improvement Auxiliary Power Improvement Availability of resources (coal, oil, water & spares) Life Extension Options Unit output restoration/uprating Performance Enhancement Environmental norms/Regulatory issues (Tariff norms etc.) Reduced Cost of Generation

Chronic Problem History Previous Studies/ Evaluations, if any TYPICAL DATA COLLECTION BY PROJECT TEAM   Chronic Problem History Previous Studies/ Evaluations, if any Operational/ Maintenance Data Performance Records Manufacturer’s Generic Design Information Manufacturing Records/ Test Certificates

FLOW CHART OF ASSESSMENT ACTIVITIES MAN POWER DEPLOYEMENT FOR PHASE –I ( JANUARY TO END OF MARCH) DEPLOYMENT AT SITE REVIEW OF PLANT HISTORY AND FIND GAP ANALYSIS COLLECT DATA & REVIEW OF PERFORMANCE PARAMETERS INTERACTION WITH O & M STAFF PLANT SURVEY UNDER COLD AND HOT STAGE STUDY REPORT PHYSICAL INSPECTION OF POWER PLANT

FLOW CHART OF ASSESSMENT ACTIVITIES MAN POWER DEPLOYEMENT FOR PHASE –II ( APRIL TO JUNE) PREPRATION OF WORK FOR TEST AT SITE SUPERVISION OF DT AND NDT TEST & CONDITION ASSESMENT EVALUATION AND ANALYSIS OF TEST REPORT ROOT CAUSE ANALYSIS REPORT INCLUDING COST BENEFIT ANALYSIS FOR REPAIR/REPLACEMENT PREPRATION OF FEASIABILITY REPORT WITH OPTIONS AND FINANCIAL ANALYSIS WITH MCKINSEY & COMP.

THANK YOU