Chuck F Claver LSST System Scientist & Commissioning Lead

Slides:



Advertisements
Similar presentations
1 Second Safety Council Meeting Tucson, AZ April 10-11, 2014 Name of Meeting Location Date - Change in Slide Master The Dome Project Bill Gressler Telescope.
Advertisements

Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
1 FINAL DESIGN REVIEW | TUCSON, AZ | OCTOBER 21-25, 2013 Name of Meeting Location Date - Change in Slide Master Overview of LSST Tools and Simulations.
1 FINAL DESIGN REVIEW | TUCSON, AZ | OCTOBER 21-25, 2013 Name of Meeting Location Date - Change in Slide Master Title of Presentation Andrew Connolly LSST.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
1 Board Telescope & Site Tucson, Arizona July 18-20, 2011 LLST Control Software Review Resources Tucson, January
1 OBSERVATORY CONTROL SYSTEM (OCS) FRANCISCO DELGADO OCS CAM.
Commissioning Planning
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
LSST Commissioning Status Update & Overview Charles (Chuck) Claver LSST System Scientist SAC Meeting March 5, 2017.
LSST External Communications Suzanne Jacoby, Andrew Gordon Communications Leads at LSST and SLAC August 17,
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Systems Engineering, Verification, and Commissioning for LSST George Z
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
LSST Commissioning: FY18 Planning
Calendar 2017.
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
Today Galaxy S II Galaxy S III Neo Galaxy S7 Active
Management Breakout: MREFC Budget Summary Victor L
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Calendar of 2012 ESL Lesson on Months.
A Class Calendar in PowerPoint
JANUARY 2018 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
LSST Control Software Integration Francisco Delgado OCS Software Manager LSST Commissioning Plan Review January 24-26, 2017.
Multi Subsystem Software Pathfinders
13-block rotation schedule
NC Truck Driver Training SCHOOL
Software & Hardware for Wavefront Estimation Pipeline Development Te-Wei Tsai Software Engineer Joint Technical Meeting March 6, 2017.
1   1.テキストの入れ替え テキストを自由に入れ替えることができます。 フチなし全面印刷がおすすめです。 印刷のポイント.
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
2017/18 Payment Calendar Due Date Cut-off Day 1st of every month
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
The SAT will be given at ECHS on the dates below!
McDonald’s Kalender 2009.
Overview of Science Verification Plan Keith Bechtol and Zeljko Ivezic LSST Commissioning Plan Review January 24-26, 2017.
January MON TUE WED THU FRI SAT SUN
January MON TUE WED THU FRI SAT SUN
Problem Gambling Clicks to Opgr.org
2300 (11PM) September 21 Blue line is meridian..
April May April May June July July June August Sept August
January MON TUE WED THU FRI SAT SUN
McDonald’s calendar 2007.
1 - January - Sun Mon The Wed Thu Fri Sat
Teacher name August phone: Enter text here.
January MON TUE WED THU FRI SAT SUN
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
JANUARY 2018 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
Water Storage Investment Program
Tropical cyclones movement
| January Sunday Monday Tuesday Wednesday Thursday Friday
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
JANUARY 1 Sun Mon Tue Wed Thu Fri Sat
McDonald’s calendar 2007.
Habitat Changes and Fish Migration
January Monday Tuesday Wednesday Thursday Friday Saturday Sunday 30 31
Commissioning Data – Who and Why?
2015 January February March April May June July August September
Habitat Changes and Fish Migration
We’re Moving Sydney August edition Read online now.
Presentation transcript:

Chuck F Claver LSST System Scientist & Commissioning Lead LSST Commissioning Chuck F Claver LSST System Scientist & Commissioning Lead Monday, August 14, 2017

Commissioning answers three basic questions LSST2017 - Tucson, AZ - August 14 - 18, 2017

Commissioning answers three basic questions Did we build the thing we said we were going to build? Verification LSST2017 - Tucson, AZ - August 14 - 18, 2017

Commissioning answers three basic questions Did we build the thing we said we were going to build? Verification Did we build the right thing – does it do what we want and expect it to do? Validation LSST2017 - Tucson, AZ - August 14 - 18, 2017

Commissioning answers three basic questions Did we build the thing we said we were going to build? Verification Did we build the right thing – does it do what we want and expect it to do? Validation Do we understand how and why the thing we built works the way it does? Characterization LSST2017 - Tucson, AZ - August 14 - 18, 2017

What is LSST Commissioning? LSST2017 - Tucson, AZ - August 14 - 18, 2017

What is LSST Commissioning? It includes System Integration & Test – Telescope + Camera + DMS + EPO LSST2017 - Tucson, AZ - August 14 - 18, 2017

What is LSST Commissioning? It includes System Integration & Test – Telescope + Camera + DMS + EPO It includes system level verification of hardware & software LSST2017 - Tucson, AZ - August 14 - 18, 2017

What is LSST Commissioning? It includes System Integration & Test – Telescope + Camera + DMS + EPO It includes system level verification of hardware & software It includes validation of the science products LSST2017 - Tucson, AZ - August 14 - 18, 2017

What is LSST Commissioning? It includes System Integration & Test – Telescope + Camera + DMS + EPO It includes system level verification of hardware & software It includes validation of the science products It includes characterizing the system as it is being built LSST2017 - Tucson, AZ - August 14 - 18, 2017

What is LSST Commissioning? It includes System Integration & Test – Telescope + Camera + DMS + EPO It includes system level verification of hardware & software It includes validation of the science products It includes characterizing the system as it is being built It includes characterizing the final as-built system LSST2017 - Tucson, AZ - August 14 - 18, 2017

Commissioning Milestones Data Production Milestone Start Date First calibration data from Auxiliary Telescope November 2018 First on-sky and calibration images with ComCam May 2020 Images from Camera re-verification at Summit Facility July 2020 Sustained observing with ComCam August 2020 First on-sky and calibration data from Camera+Telescope February 2021 Sustained scheduler driven observing with Camera+Telescope April 2021 Start Science Verification mini-Surveys June 2021 LSST2017 - Tucson, AZ - August 14 - 18, 2017