SESAME-On The Way To Become Real

Slides:



Advertisements
Similar presentations
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Advertisements

Necessity of Moving from Green Book to White Book M. Hadi Hadizadeh Yazdi International Scientific Meetings Office Iran October 26, 2002 Amman, Jordan.
SESAME Storage Ring RF-System
SESAME SESAME RF SYSTEM Arash Kaftoosian.
Development of Superconducting Magnets for Particle Accelerators and Detectors in High Energy Physics Takakazu Shintomi and Akira Yamamoto On behalf of.
Procurement status of SR main magnets Attilio Milanese 23 Nov
EPPCN meeting – Krakow May 18, 2015 Avital Baer. SESAME – Synchrotron-Light for Experimental Science and Applications in the Middle East Allaan, Jordan.
Status of the SESAME Machine
SESAME Synchrotron Light for Experimental Science and Applications in the Middle East JSPS Asien Science Seminar Synchrotron Radiation Science Dieter Einfeld.
Maher Attal On behalf of SESAME Team Status of SESAME Synchrotorn-light for Experimental Science and Applications in the Middle East M. Attal, XXII ESLS.
SESAME Status Ahed AL Adwan (SLS, SESAME) EPICS Collaboration Meeting Bessy, May 2002 Synchrotron-light for Experimental Science and Applications in the.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
EPPCN meeting – Prague May 12, 2014 Avital Baer. SESAME – Synchrotron-light for Experimental Science and Applications in the Middle East Allaan, Jordan.
Scientific support Scientific laboratories have the qualified specialists in fields of accelerator physics and technique. They calculate and model the.
SESAME STORAGE RING RF-SYSTEM SESAME-TAC meeting Nov.2012 SESAME SR RF System – Darweesh FOUDEH.
CESSAMag: magnets for SESAME Attilio Milanese CERN.
Collaboration with Normal Conducting Magnet section
Modulator and overmoded RF components status for the 12GHz Test Stand at CERN - RF meeting – 17/03/2010.
Contents Overview of 150 MeV FFAG Accelerator
3rd Libera Users Meeting
February 2010 ALBA Synchrotron Light Source Francis Perez.
14 th ESLS RF Meeting – Trieste, September 2010 ALBA RF Status 1/28 ALBA RF Status Francis Perez.
14th ESLS RF Workshop ELETTRA / Trieste, Italy / 2010 September The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis.
NSLS-II Transfer Lines BUDKER INSTITUTE OF NUCLEAR PHYSICS NOVOSIBIRSK.
Remembering Gus Voss His critical role in the early days of SESAME.
Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Paco Sanchez, RF Group, CELLS (Consortium for.
RF 1/33 ALBA RF system why, how and other questions Francis Perez.
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
Power Supply & Electrical Engineering for sustainable science
Magnets Attilio Milanese Doing Business with CERN
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
650 MHz Solid State RF Power development at RRCAT
ALBA RF Systems Francis Perez.
ICFA mini-Workshop on Beam Commissioning for High Intensity Accelerators Yasuhiro Watanabe (J-PARC / JAEA) Tracking between bending and quadrupole families.
Wir schaffen Wissen – heute für morgen Paul Scherrer Institut Synchrotron Light Sources at the Paul Scherrer Institute at the 20th ESLS workshop at BESSY.
Status of SESAME Synchrotorn-light for Experimental Science and Applications in the Middle East SESAME, Allan, Jordan Maher Attal On behalf of SESAME Team.
DDBA magnets Chris Bailey Low emittance rings Sept Frascati.
LEReC BPM Status P. Cernigla, R. Hulsart, R. Michnoff, Z. Sorrell June 2, 2016.
1 Target Introduction Chris Densham STFC/RAL Mu2e Target, Remote Handling, and Heat & Radiation Shield Review Nov
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
B u d k e r I N P VEPP-4M tunnel view BINP accelerator facilities J/  and  physics  - lepton precise mass measurement  - physics 5 GeV collider.
ELENA installation progress F. Butin / ELENA collaboration.
New Magnet Design for FCC- ee Attilio Milanese, CERN 26 Oct presented by Frank Zimmermann.
Report Technical Director Storage-Ring-Installation Completed
Areal RF Station A. Vardanyan
Report Technical Director Storage-Ring-Installation Completed
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
Jan 2016 Solar Lunar Data.
Other Technologies / Energy Efficiency Session
Development of high-power IOTs as an efficient alternative to klystrons Morten Jensen Energy for Sustainable Science 24 October 2013, CERN.
SOLEIL EXPERIENCE WITH HIGH POWER SOLID STATE AMPLIFIERS
Low Emittance Rings 2014 Workshop
An X-band system for phase space linearisation on CLARA
Arc magnet designs Attilio Milanese 13 Oct. 2016
The situation is far better than I had thought.
COOLING & VENTILATION INFRASTRUCTURE
BriXS – MariX WG 8,9 LASA December 13, 2017.
SNS Fundamental Power Coupler History
X-band Facilities and High Gradient Tests Stands Around the World
ALIGNMENT STRATEGY OF SESAME T. Abu-Hanieh, SESAME, Jordan
Average Monthly Temperature and Rainfall
CEPC RF Power Sources System
ADS Accelerator Program in China
Advanced Research Electron Accelerator Laboratory
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Status of the ASTRID2 RF systems
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
CERN: from fundamental sciences to daily applications
Presentation transcript:

SESAME-On The Way To Become Real erhard huttel, energy-workshop, desy, 29.Oct.2015

The Evolution of SESAME 1990’s: A scientific cooperation as a vehicle of peace in the Middle East been proposed;I n particular, Middle East Scientific Cooperation (MESC) group, based at CERN (Tord Ekelof, Sergio Fubini, Eliezer Rabinovici, Herwig Schopper, …) 1997: Original idea (Voss, Winick); Upgrade/rebuild BESSY 1(0.8 GeV) in the Middle East, as centerpice for a new international research center. Voss presents the concept to a MESC meeting in Turino. 1999: 1st meeting at UNESCO; (Interim) Council established – Herwig Schopper, President. 2002 - Decision to build a new 2.5 GeV ring (still using BESSY injector) 2003 - Ground breaking for building; completion in 2008 2008 – Chris Llewellyn-Smith takes over as Council President erhard huttel, energy-workshop, desy, 29.Oct.2015

SESAME- Members / Observers Bahrain, Cyprus, Egypt, Israel, Iran, Jordan, Pakistan, Palestine, Turkey. Observers: Brazil, China, France, Germany, Greece, Italy, Japan, Kuwait, Portugal, Russia, Sweden, Switzerland, UK and USA. SESAME erhard huttel, energy-workshop, desy, 29.Oct.2015

Funding Iran, Israel, Jordan, Turkey contribute 5 M$ within next four years. 4 x 1.25 M $ (2012-2015) (Iran contribution blocked by sanctions) EU/CERN contribute 5 M€ for the purchasing of the magnet system. (2013) Italy contributes 1 M € (2014), 0.85 M € (2015), 0.5 M € (2016). Facility Support: ALBA, DESY, DIAMOND, ELETTRA, ESRF, KIT, MAX, PSI, SOLEIL Expert-Visit, Training, Material Operational Budget 2015: 2.0 M $ Salaries 2105: 1.7 M $ erhard huttel, energy-workshop, desy, 29.Oct.2015

SEAME-Layout 2.5 GeV Storage-ring 20 MeV-Microtron 800 MeV Booster XAFS-BL erhard huttel, energy-workshop, desy, 29.Oct.2015

erhard huttel, energy-workshop, desy, 29.Oct.2015 SESAME Microtron in Operation, Beam in transfer line (2012) 3 mm 4.4 mm Magnet Field: 0.112 T Diameter: 2.22 m Energy gain/turn: 0.535 MeV Max. e-Radius: 0.67 m No turns: 42 RF frequency: 3.00 GHz RF-Peak-Power: 2 MW Achieved: Energy: 20 MeV Pulse-Width: 1 µs Pulse-Current: 4 mA erhard huttel, energy-workshop, desy, 29.Oct.2015

Booster Installation (2013) Booster Commissioning (2014) Dipole Number 12 B-field 1 T Radius 2.67 m Gap 40 mm Current 1000 A No windings 2x16 Resistance 0.015 Ω Inductance 8.6 µH Dipole Current-Monitor Cavity Corrector Quadrupole Quadrupole Number 12 / 6 Gradient 5.77 T/m Length 0.25 m Bore- 78 mm Current 146 A No windings 4 x 24 Resistance 0.054 Ω Inductance 6.8 µH Red: beam current Blue: RF Yellow: Energy erhard huttel, energy-workshop, desy, 29.Oct.2015

Storagering Magnets (CESSAMag) Dipole B-field 1.455 T Gradient 2.79 T/m Radius 5.729 m Mag. Length 2.25 Gap 40 mm No windings 2 x 48 Current 500 A Voltage V On the way to Aqaba Quadrupole QF QD Gradient 17 -10 T/m Int. Gradient 5.1 -1 T Bore-Diameter 70 mm Iron-Length .28 .1 m No windings 4 x 34 4 x 19 Current 240 195 A Voltage 11 2.5 V erhard huttel, energy-workshop, desy, 29.Oct.2015

80 kW RF Solid State Amplifier (SSA) Collaboration Agreement between SOLEIL and SESAME: To built for SESAME one 80 kW 500 MHz SSA Further three towers contracted to SIGMA-PHI-Electronics Delivery: Feb. (Amplifier 1,2) , Jun (Amplifier 3,4) 2016 AC-DC-PS (EATON) Power: 3 kW Voltage: 48 V Eff.: 95 % 2.6 m 2.05 m 1.85 m 80 AC-DC-PS RF Module (SOLEIL) Power: 600 W Gain: 17 dB Efficiency: 60% 160 RF Modules erhard huttel, energy-workshop, desy, 29.Oct.2015

Prototype Assembling Test (CERN Mar 2015) SF Cyprus QF ELYTT, Spain QD ELYTT, Spain SD Pakistan DP TESLA, England Girder NORTEMECANICA, Spain erhard huttel, energy-workshop, desy, 29.Oct.2015

Installation and Commissioning All main components are ordered to complete the ring (Magnets, Vacuum, RF) Delivery to SESAME (50 % Dec 2015, 40 % Mar 2016) Installation Magnets, Vacuum : Jan.-Aug. 2016 Pipes and Cable installation: Mar.-Oct. 2016 RF Installation and Conditioning : Jul.-Sep. 2016 Beam Commissioning. Nov.-Dec. 2016 erhard huttel, energy-workshop, desy, 29.Oct.2015

Power and Cooling Electric Power Cooling Capacity Cooling Tower Compressor 400 kW 2 x 1115 kW Chilling water tank Pumps 100 kW Heat Exchanger 2 x 870 kW Pumps 120 kW Air-Conditioning 300 kW 600 kW De Ionized Water Circuits: SR Magnet 500 kW RF Amplifier 250 kW RF-Cavities 200 mA 125 kW SR Absorber (200 mA) 125 kW Booster (PS) 100 kW Sum 2 000 kW erhard huttel, energy-workshop, desy, 29.Oct.2015

Proposal United Pioneer Business (1 MW Peak) Solar Power Electricity cost Jordan : Households: 0.05 € / kWh Industry: 0.12 € / kWh Administration: 0.30 € / kWh Jordan Solar Energy: Average Solar Energy: 2200 kW h / m2 / y Peak Solar Power (h): 0.75 kW / m2 SESAME Power consumption: 2 MW Operation time: 5000 h Operation cost: 3 M € Proposal United Pioneer Business (1 MW Peak) Number Panels: 4000 Panels Size: 6500 m2 Average Solar Energy: 14 GW / y Average Energy (DC): 2.0 GW / y Average Energy (AC): 1.6 GW /y Saved Cost: 0.5 M € Peak Power: 0.72 MW Average Power: 0.19 MW Solar Panel: Size: 1 x1.6 m2 Nom. Power: 250 Wpeak SCD: 1 kW/m2 , 25 °C Nom. Volt.: 30 V Nom. Cur: 8 A Efficiency: 15% erhard huttel, energy-workshop, desy, 29.Oct.2015

Proposal UPB (United Pioneering Business) erhard huttel, energy-workshop, desy, 29.Oct.2015

Additional Actions Building renovation (following break down of the roof) Doubled thermal insulation of the roof Double glass windows Improved cooling management Increased temperature in return flow Adapt Air Conditioning to temperature to seasons Reduce powering of standby facilities (Injector) Reduce powering during shut down erhard huttel, energy-workshop, desy, 29.Oct.2015