Measuring Outcomes of GEO and GEOSS: A Proposed Framework for Performance Measurement and Evaluation Ed Washburn, US EPA.

Slides:



Advertisements
Similar presentations
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Advertisements

ID-06 Building a User-Driven GEOSS Essential Components of User Management for GEO Tasks.
Call for Proposals: Earth Observations in Decision Support Joint Effort of GEO Capacity Building Committee and User Interface Committee March 2009.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
Introduction to Monitoring and Evaluation
Lucila Beato UNMIL/HRPS
Prepared by BSP/PMR Results-Based Programming, Management and Monitoring Presentation to Geneva Group - Paris Hans d’Orville Director, Bureau of Strategic.
Logic Models and Evaluation Glen W. White 1 Jamie Simpson 2 1 University of Kansas, Research and Training Center on Independent Living 2 Kansas Department.
Program Evaluation. Lecture Overview  Program evaluation and program development  Logic of program evaluation (Program theory)  Four-Step Model  Comprehensive.
MINISTRY OF DEVOLUTION AND PLANNING. M&E DEPARTMENT WELIME Using Technology in Monitorin g and Evaluation (e-ProMIS)
Action Logic Modelling Logic Models communicate a vision for an intervention as a solution to a public health nutrition (PHN) problem to:  funding agencies,
Program framework 1.Articulate program goals 2.Develop system level model for goal attainment 3.Assess current management efforts – identify gaps 4.Develop.
Dennis McBride, Ph.D. The Washington Institute (253) Goal Driven Logic Models.
Logic Modeling for Success Dr Kathryn Wehrmann Illinois State University.
What is Business Analysis Planning & Monitoring?
1 Framework Programme 7 Guide for Applicants
Results-Based Management
1 RBM Background Development aid is often provided on a point to point basis with no consistency with countries priorities. Development efforts are often.
© GEO Secretariat 5.2 Monitoring and Evaluation John Adamec Co-Chair, M&E Working Group GEO-XI Plenary November 2014 Geneva, Switzerland.
KEYWORDS REFRESHMENT. Activities: in the context of the Logframe Matrix, these are the actions (tasks) that have to be taken to produce results Analysis.
Green Paper on National Strategic Planning The Presidency November 2009.
EPA’s Strength in Both GEOSS & ESIP; Environmental Health Decisionmaking January 10, 2008 George Gray, Ph.D. Assistant Administrator EPA Office of Research.
Promising Ideas and Issues to Consider in Reaching Reading and Literacy Goals Logistics of supervision, training, support to teachers Sakil Malik Director.
Task NumberHarmonise, develop & implement capacity building Performance Indicators CB-07-01c Harmonise efforts by Tasks, in particular those related with.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
M&E TRAINING MODULES Different tools for different applications.
Definition of Public Health Public health is the science and art of organized societal efforts to ensure [and create] the conditions for the highest possible.
The Data Sharing Working Group 24 th meeting of the GEO Executive Committee Geneva, Switzerland March 2012 Report of the Data Sharing Working Group.
Key Components of a successful Proposal OAS / IACML Workshop on Technical Assistance. San José, Costa Rica May 8, 2007 By: José Luis Alvarez R. Consultant.
Concepts/ definitions/ meanings of program plan, program scheme, program development, concept paper Program plan is a systematic arrangement of elements.
IDEV 624 – Monitoring and Evaluation Evaluating Program Outcomes Elke de Buhr, PhD Payson Center for International Development Tulane University.
GEO Implementation Mechanisms Giovanni Rum, GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
GEO Strategic Plan : Implementing GEOSS Douglas Cripe GEO Work Programme Symposium 2-4 May 2016, Geneva.
Stages of Research and Development
Building an ENI CBC project
Reporting, Monitoring and Evaluation
Project monitoring and evaluation
M&E Workshop for Full Proposal
Country Level Programs
Regulatory Strategies and Solutions Group, LLC
Resource 1. Involving and engaging the right stakeholders.
Background Non-Formal Education is recognized as an important sub-sector of the education system, providing learning opportunities to those who are not.
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 12. Risk Management.
a New Focus for External Validity
Harvesting outcomes from a global network dedicated to improving the life of vulnerable children worldwide Goele Scheers AEA 2016 Conference Atlanta Outcome.
Programme Board 6th Meeting May 2017 Craig Larlee
Capacity Building Enhance the coordination of efforts to strengthen individual, institutional and infrastructure capacities, particularly in developing.
Strategic Planning for Learning Organizations
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
Prepared by BSP/PMR Results-Based Programming, Management and Monitoring Presentation to Geneva Group - Paris Hans d’Orville Director, Bureau of Strategic.
Developing & Refining a Theory of Action
program framework Articulate program goals
KEY PRINCIPLES OF THINKING SYSTEMICALLY
Oceans and Society: Blue Planet
Claire NAUWELAERS, independent policy expert
Logic Models and Theory of Change Models: Defining and Telling Apart
Overview of working draft v. 29 January 2018
Session 9 Recap on LFM and IL.
CATHCA National Conference 2018
Regulated Health Professions Network Evaluation Framework
Portfolio, Programme and Project
CEOS Response to IPWG on Draft GEO Strategy
Using Logic Models in Project Proposals
Presentation title Adaptation Committee and Least Developed Countries Expert Group Agenda item 5 (c-e) Draft recommendations developed by the Adaptation.
What is your impact pathway?
Civil Society Facility and Media Programme Call for proposals: EuropeAid/162473/DH/ACT/Multi Webinar no. 3: Preparing effective Concept Note.
How is an M & E framework derived from the logframe?
M & E Plans and Frameworks
Presentation transcript:

Measuring Outcomes of GEO and GEOSS: A Proposed Framework for Performance Measurement and Evaluation Ed Washburn, US EPA

Development of performance indicators is usually based on a “results chain” or “value chain” that describes the sequence of stages of influence necessary to achieve the desired societal benefits. Inputs Activities Outputs Outcomes Impacts The financial, human, material, technological and information resources used by the defined activities to produce the outputs. The actions taken or work performed through which inputs are mobilised to produce specific outputs. The products and services which result from the completion of the specified activities. The intended or achieved short-term and medium-term effects of the outputs, usually requiring the collective effort of partners. The long-term intended benefits to society that represent the ultimate reasons for undertaking the initiative. This is a generic approach used in many domains and by many governments. Definitions are adapted from OECD terminology (“Glossary of Key Terms in Evaluation and Results Based Management”). All results chains / value chains / logic models are simplified representations of the causal linkages and key assumptions underlying a program, initiative or intervention. They are similar to logframes but are generally applied at a strategic level as opposed to a project level.

Increasing time to realize change Full control is only exerted over inputs, activities and outputs. Outcomes and impacts are subject to many other influences and so it must be recognized that attribution of results to any specific intervention becomes increasingly difficult. Inputs Activities Outputs Outcomes Impacts The financial, human, material, technological and information resources used by the defined activities to produce the outputs. The actions taken or work performed through which inputs are mobilised to produce specific outputs. The products and services which result from the completion of the specified activities. The intended or achieved short-term and medium-term effects of the outputs, usually requiring the collective effort of partners. The long-term intended benefits to society that represent the ultimate reasons for undertaking the initiative. Increasing time to realize change Decreasing potential to attribute change to a specific program or initiative

Existing elements of the 10-Year Implementation Plan and the GEO 2007-2009 Work Plan may be aligned with this conceptual framework. Doing so highlights the absence of clearly defined outcomes. Articulating these outcomes in specific and concrete terms is an essential step in the development of outcome indicators. Inputs Activities Outputs Outcomes Impacts Financial, human, material, and information resources contributed by partners toward the Work Plan tasks GEO Work Plan Tasks Targets as established in the Reference Document The 9 Societal Benefit Areas National and multi-national activities not included in the GEO Work Plan Secondary benefits Other national and multi-national outputs Existing data & infrastructure GEO committee activities Given the complexity of earth observation systems and actors, there are likely multiple steps of outcomes between the outputs and the impacts. Secretariat activities User requirements

Further direction on the outcome steps can be found in the GEOSS system diagram below, adapted from the GEO 10-Year Implementation Plan Reference Document. Inputs Activities Outputs Outcomes Impacts Financial, human, material & information resources contributed by partners toward the Work Plan tasks GEO Work Plan Tasks National and multi-national activities not included in the GEO Work Plan Targets as established in the Reference Document The 9 Societal Benefit Areas Existing data & infra-structure Other national and multi-national outputs Secondary benefits GEO committee activities User needs Secretariat activities GEO coordinates these processes... ...with the aim of influencing these systems and interactions... ...in order to realize these benefits.

Four distinct levels of outcomes may be identified between the GEO outputs and the Societal Benefit Areas. These levels can help guide the identification of specific outcomes and indicators and will enable performance information from diverse sources to be assembled and aggregated. Outcomes Impacts Level 1 Uptake of GEO standards, etc. and implementation of GEO recommend-ations Level 2 Changes to information system inter-operability & information accessibility Level 3 Changes to decision support (end user) products & services Level 4 Responses by affected populations to improved decision support The 9 Societal Benefit Areas Inputs Activities Outputs Decision Making Secondary Benefits

Performance measurement and evaluation of GEOSS will be focused primarily on the levels of outcomes up to level 3. Level 4 outcomes and impacts, while important to GEOSS, depend for their realization on policy, management and personal decisions. Outcomes Impacts GEOSS Level 1 Uptake of GEO standards, etc. and implementation of GEO recommend-ations Level 2 Changes to information system inter-operability & information accessibility Level 3 Changes to decision support (end user) products & services Level 4 Responses by affected populations to improved decision support The 9 Societal Benefit Areas Inputs Activities Outputs Decision Making Secondary Benefits

Performance of the GEO Secretariat and the coordination role of GEO will be measured, tracked and reported separately, as described in the Reference Document. Outcomes Impacts Level 1 Uptake of GEO standards, etc. and implementation of GEO recommend-ations Level 2 Changes to information system inter-operability & information accessibility Level 3 Changes to decision support (end user) products & services Level 4 Responses by affected populations to improved decision support The 9 Societal Benefit Areas Inputs Activities Outputs Decision Making Secondary Benefits GEO Processes Process Outputs Process Outcomes GEO & GEO Secretariat

Performance indicators based on the four outcome levels and impacts may be thought of as the monitoring of key maturation points for GEOSS. This provides learning and feedback to refine and focus GEO planning as well as providing assurance to political sponsors and the public of the effectiveness of GEO and GEOSS. Outcomes Impacts Learning & Feedback Level 1 Uptake of GEO standards, etc. and implementation of GEO recommend-ations Level 2 Changes to information system inter-operability & information accessibility Level 3 Changes to decision support (end user) products & services Level 4 Responses by affected populations to improved decision support The 9 Societal Benefit Areas Inputs Activities Outputs Decision Making Secondary Benefits

The various elements are combined below to form the complete framework. Outcomes Impacts Learning & Feedback GEOSS Level 1 Uptake of GEO standards, etc. and implementation of GEO recommend-ations Level 2 Changes to information system inter-operability & information accessibility Level 3 Changes to decision support (end user) products & services Level 4 Responses by affected populations to improved decision support The 9 Societal Benefit Areas Inputs Activities Outputs Decision Making Secondary Benefits GEO Processes Process Outputs Process Outcomes GEO & GEO Secretariat

Specific outcomes and indicators may be identified at any level of activity, depending on particular needs and requirements. 1 2 3 4 SBAs 1 2 3 4 SBAs 1 2 3 4 SBAs 1 2 3 4 SBAs

The GEO Performance Report will draw on three principal sources: a report on GEO processes and Secretariat activities, reports from member countries and organizations, and a report on the measured levels of the identified GEOSS outcome indicators. GEO Performance Report GEOSS Outcome Indicators Report on GEO Processes National / Organizational Reports