(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1

Slides:



Advertisements
Similar presentations
PANDA Mechanical Workshop Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Mechanical Workshop GSI
Advertisements

2/9/2004DC status - BVR1 1.Mechanics 2.Foil 3.Frame and Print Anode Inner cathode Hood 4.Pressure control + He bag + target 5.Electronic 6.Schedule Status.
Status Update on Mechanical Prototype in Rome November 6,
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 1 CFSS and ES electrical screening for SPD Harness RB24-RB26 Electrical.
Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
1 ILD inner region integration meeting M. Joré – Introduction ILD inner region integration meeting Welcome words Charge of the meeting The current concept.
XXXIX PANDA COLLABORATION MEETING GSI-DECEMBER 2011 B. GIRAUDO / D. ORECCHINI CENTRAL SUPPORT FRAME STRUCTURAL ANALYSIS FIRST APPROACH AND PRELIMINARY.
Integration Prototype1 BaBar Integration as a Prototype for SuperB Bill Wisniewski SuperB Workshop at LNF 6 April 2011.
- PROPOSAL FOR A SOLUTION OF A “STRAW MODULE” INTEGRATION - INFN-LNF - SPAS -STRAW MODULES INTEGRATION- INFN-LNF-SPAS- December D. Orecchini – P.
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
DCal-ALICE integration and installation plan and status A. Tauro.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
Central Tracker Cabling and Mechanics Paola Gianotti26/4/111.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
A.Ryazantsev, IHEP-Protvino, RussiaPANDA Russia Workshop at Moscow, May 2015 Status on Barrel Mechanics Andrey Ryazantsev on behalf of the IHEP-Protvino.
G. GIRAUDO - D. ORECCHINI Beam-Target line for PANDA – GSI – 4 February 2013 Beam-Target line for PANDA – GSI – 4 February 2013 Central Trackers assembly.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
1)– CENTRAL TRACKER INTEGRATED ITEMS: > Central Tracker, “Assembly & Insertion Auxiliary Structure”. > “CSF”- Central Tracker Support Frame (In collaboration.
- “STRAW TRACKER AND CLASH ITEMS ANALYSIS. - “STRAW TRACKER AND STILL OPENED ITEMS ANALYSIS. - “STRAW TRACKER AND DANGEROUS ITEMS ANALYSIS. INFN-LNF -
What’s new at LAL-LLR ( MDI issues) M.Jore, C.Clerc Visit at CMS Forward detectors meeting at LLR Vacuum in Beam pipe, first LAL results.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
STT gas system a possible implementation
Update on PANDA solenoid design
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
“CENTRAL SUPPORT FRAME” -
STRAW TRACKER SYSTEM CAD STATUS :
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
Update of MVD services and requests
- CT INSTALLATION PROCEDURE OVERVIEW -
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
STRAW TRACKER CLASH AND INTEGRATION ANALYSIS- INFN-LNF - SPAS
Micro Vertex Detector of PANDA Strip Detector
David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin EMC BW Endcap.
Assembly procedure – Inner Region
C.Clerc ILD session, ALCPG /03/2010
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
LumiCal mechanical design, integration with LDC and laser alignment
Vertex Detector Mechanical R&D Design Questions and Issues
Integration – preliminary ideas on routing and tests
Integration issues at IHEP
EMC BWE PANDA Insertion
Requirements of the support mechanics
First of all we will remind some numbers:
Integration and IR Hall
Micromegas for CLAS12 – Preliminary work on integration
OT Survey & Adjustment Outline: Survey technique at present
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
BCM Overview Placement such that system is sensitive to all types of beam accidents. => 2 independent subsystems Halo losses inside the Pixel volume ie.
Inner DET. Integration Inner detector envelope Radial clearances.
as a prototype for Super c-tau factory
Polarized 3He target installation
Presentation transcript:

(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1 - CENTRAL SUPPORT FRAME GEOMETRY - A recent update is referred to the “inner skin”. (Presented on “Turin - Central Tracker Workshop - April 2009)” (A) (B) The previous circular mylar foil (A), could be substituted with a panel of carbon fiber (B), 1mm thickness, properly shaped to gain some more space. 1 Turin - June 2009 - B.Dulach D.Orecchini

- NEW INNER SKIN SECTION: PICTORIAL VIEWS WITH VERTEX - - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS - NEW INNER SKIN SECTION: PICTORIAL VIEWS WITH VERTEX - - New skin shape. 2 Turin - June 2009 - B.Dulach D.Orecchini

57mm - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS - Further free space. - NEW INNER SKIN: SECTION VIEW WITHOUT VERTEX - - Further free space. - Straw Tubes. - Old skin shape. Radius: 158mm. 57mm Stirrups radius: 86mm. - FREE SPACE - - ST_Tracker inner radius: 150mm. - Connection bars. - New skin shape. 3 Turin - June 2009 - B.Dulach D.Orecchini

- CENTRAL SUPPORT FRAME - INFN-LNF - SPAS INNER CENTRAL TRACKER ZONE “MAIN NUMBERS”: Outer beam pipe radius: -------------------------------------------- 78mm Plus free space (to allow pipe spatial regulation, 3mm): ----------- 81mm Plus outer support “Central Frame flange” radius (5mm thick.): -- 86mm Plus stirrups outer radius (7mm thick.): ----------------------------93mm FREE SPACE FOR VERTEX CABLES AND COOLING: +/- 57mm 4 Turin - June 2009 - B.Dulach D.Orecchini

- CENTRAL SUPPORT FRAME - INFN-LNF - SPAS - CENTRAL TRACKER ASSEMBLY SEQUENCE - - JUST TO REMEMBER - 2 Step: Vertex assembly. - 1 Step: Cross & Beam Pipe assembly. - 3 Step: Straw-Tubes Tracker assembly. 5 Turin - June 2009 - B.Dulach D.Orecchini

- CENTRAL SUPPORT FRAME - INFN-LNF - SPAS The “Central Support Frame” idea is ready. A new is: Frascati and Turin are evaluating the hypotesis to realize a prototype in the INFN Turin workshop. NB: The items yet to develop are: A)- The connection points with the target pipe and the beam pipe and the related structural verifications. B)- Where and how to attach the rails of the “Support and inserting system”. (They must be developed with the involved people.) 6 Turin - June 2009 - B.Dulach D.Orecchini

- CENTRAL TRACKER MOUNTING & INSERTING SYSTEM - INFN-LNF - SPAS - JUST TO REMEMBER - A:-An “Inserting structure”, with an Up and Down “Extra Beams”….. a)- will be placed (by Hall crane) and aligned on the “service platform”. b)- connected with the internal Up an Down beams. B:- In sequence will be assembled: a)- The cross-pipe. b)- The vertex. c)- The two parts of the S_Tubes tracker. d)- The cabling and gas system. C:- The central tracker will be shifted on the “working position”. NB.- The distance that the tracker must be cover is more or less of 4m. - The alignement operations could be realized with a series of targets opportunely placed on the assembled components and a laser tracker system. 7 Turin - June 2009 - B.Dulach D.Orecchini

- S_TUBES TRACKER CABLING MAIN ASPECTS – - CENTRAL TRACKER CABLING - INFN-LNF - SPAS - JUST TO REMEMBER - - S_TUBES TRACKER CABLING MAIN ASPECTS – We have to bring out the following amount of cables and gas pipes (till now): 1)- Needed cables and gas tubes section: 5000mm^2. 2)- Estimated cables and gas tubes weigt: 6 Kg/m ST_Tracker cable section: 5000mm^2. ST_Tracker cable section: 1250mm^2 each. ST_Tracker gas system. NB: The item to develop is: - how to support and how to bring out the “gas and cables system”. (It must be integrated with “gas and cables system”, of Vertex and Backward EMC). 8 Turin - June 2009 - B.Dulach D.Orecchini

- S_TUBES TRACKER: main dimensions inside the target spectrometer. INFN-LNF - SPAS - JUST TO REMEMBER - -”Up and Down Rails” outer encumbrance: 893mm. (Inserting System) - S_TUBES TRACKER: main dimensions inside the target spectrometer. -ST_Tracker: diam. 836mm. -Electronics system encumbrance: 150mm. -Gas system encumbrance: 50-60mm. 9 Turin - June 2009 - B.Dulach D.Orecchini

1° ITEM: HOW SUPPORT CABLES AND PIPE. - S_TUBES TRACKER CABLING & GAS SYSTEM - INFN-LNF - SPAS 1° ITEM: HOW SUPPORT CABLES AND PIPE. A more long “Central Frame”, support the cables and bring out them outside the magnet. (The “shape” of the cables could be optimized) - At the same time, The “Central Frame” support the backward part of “pipe” (It’s to be fixed the lenght and if there will be the cryo-pump inside. Turin - June 2009 - B.Dulach D.Orecchini

THIS HYPOTHESIS IS INCOMPATIBLE WITH THE BACKWARD EMC – - S_TUBES TRACKER CABLING & GAS SYSTEM - INFN-LNF - SPAS THIS HYPOTHESIS IS INCOMPATIBLE WITH THE BACKWARD EMC – Turin - June 2009 - B.Dulach D.Orecchini

system” (At the end of the frame ?)The disconnection must be done - S_TUBES TRACKER CABLING & GAS SYSTEM - INFN-LNF - SPAS -NB. It’s important where is the “disconnection zone” for “cables and gas system” (At the end of the frame ?)The disconnection must be done before the extraction of the Central Tracker. More is internal and much more is complicate to reach. -NB. We must remember to consider the patch-panels encumbrances. They are not the same of the cables and pipes encumbrances. Turin - June 2009 - B.Dulach D.Orecchini

2° ITEM: CENTRAL TRACKER INSERTING AND EXTRACTING PHASES. - S_TUBES TRACKER CABLING & GAS SYSTEM - INFN-LNF - SPAS 2° ITEM: CENTRAL TRACKER INSERTING AND EXTRACTING PHASES. During the inserting and the exracting phases,the area between the “External support structure” and the “Magnet” must be free. - Or the “EMC support structure” will be removed before the Apparatus will be moved on the “parking position”, or ....... ....the “EMC support structure” must not only moved outside (along the magnet axis), but also shifted in a lateral position or removed by the crane. If the “Service external platform” is fixed, we’ll need a removable part of it (to allow the positioning of the “EMC support structure”. Turin - June 2009 - B.Dulach D.Orecchini