WG Composition: WG Convener: W. A. Radasky

Slides:



Advertisements
Similar presentations
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
Advertisements

Writing as a Team Nicole Lindsay Bachelor of Commerce Quarter 2 January 2006.
JWG A2/B4-28 HVDC Converter Transformers Progress Report Convener: Milan Saravolac IEC SYMPOSIUM DELHI, January 2009.
O.Gjerde WG C2/C5.05 Development and Changes in the Business of System Operators Status report from WG C2/C5.05 Ole Gjerde, Statnett Convenor September.
CIGRE WG C PRACTICES IN INSULATION COORDINATION OF MODERN ELECTRIC POWER SYSTEMS AIMED AT THE REDUCTION OF INSULATION LEVELS WG Composition: WG.
1 AG.03: CIGRE SC A3 Green Book proposal (based on experience of Brazilian NC to publish CIGRE textbooks) CIGRE SC A3 Green Book Project Team Paulo Fernandez.
January 6. January 7 January 8 January 9 January 10.
Critical Book Review Due Dates March 3 rd -1 pg summary due (what you have read to this date, not the whole book)- 25pts March 10 th –Project proposal.
Operating Committee Chair Report Scott Kinney, OC Chair March 25, 2015.
Working Group #3 E9-1-1 Location Accuracy December 16, 2011 Craig Frost, Verizon Wireless, Co-Chair Stephen J. Wisely, APCO International, Co-Chair.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.26 AR 2014Page No.: 1 Activity Report 2014 WG A3.26 Influence of shunt capacitor.
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
Team Member(s) Your name. 25 January SOLD: BUY: Copy of stock pdf.
MTAC WG 114 MTAC Workgroup 114 Establish Service Standards and Measurement Special Services Update July 11, 2007 Full Workgroup Meeting.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.24 AR 2014Page No.: 1 Activity Report 2014 WG A3.24 Tools for Simulating Internal.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A Page No.: 1 Activity Report 2014 WG A3.33 Experience with equipment.
CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks WG Composition:  Convener: Francisc Zavoda; Secretary: Sarah.
SC14 Report to the SC13 Plenary Larry Schultz, Chairman Erin Cliggett Kahn, Secretary 17 June 2008.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.27 AR 2014Page No.: 1 Activity Report 2013 WG A3.27 The Impact of the Application.
September 2008 SundayMondayTuesdayWednesdayThursdayFridaySaturday
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
CIGRE WG C4.503 – Numerical techniques for the computation of power systems, from steady- state to switching transients WG Composition:  Jean Mahseredjian.
INGLES PRESENTADO POR : o Alejandra Aguirre o Sara Ocampo o Leidy churta o Laura ramirez.
Work Related to Senate Bill 2202 (effective January 1, 2001)
Doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Update on IEEE IMT Advanced RR-TAG was directed to take.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
CIGRE JWG A2/C4.52 – High-Frequency Transformer and Reactor Models for Network Studies WG Composition:  WG Convener: Bjørn Gustavsen  WG Secretary: Angelica.
CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks WG Composition:  Convener: Francisc Zavoda; Secretary: Sarah.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
ISO Liaison Report Hidenori Shinoda Charles Parisot.
The workshop Conclusions of the 8th San Cristòbal de las Casas
WG Composition: WG Convener: Bjørn Gustavsen
DOING BUSINESS in BRAZIL
2nd Project Meeting Berlin, 1 December 2000
GCOS IP and Update on CEOS Response
Working in Groups in Canvas
EU Implementation Programme
Secretariat Matters INTOSAI Working Group on Environmental Auditing
Grid Code Review Panel 16th August 2017
CIGRE WG C4.28 Extrapolation of EMF measurements
CIGRE WG C4.33 – Impact of Soil-Parameter Frequency Dependence on the Response of Grounding Electrodes and on the Lightning Performance of Electrical Systems.
Global Youth Tobacco Survey (GYTS): Proposal Development
Industry Numbering Committee (INC) Report to the NANC April 17, 2007
Overview of the FEPAC Accreditation Process
CEOS Work Plan Steven Hosford, ESA/CNES, CEO CEOS SIT-33
Information for academic advisers
13-block rotation schedule
January 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for January 2018] Date.
NATA Foundation Building Blocks Process
Guidelines for Resident Quality Improvement Project
IEEE Rail Transit Vehicle Interface Standards Committee
LAMAS Working Group December 2013
Draft Capacity & Connection Plan
Next Steps Advisory group debrief call Circulate meeting summary
SC6 Report Annual Review and Approval of SC6 Scope – The scope of SC6 was revised to read as follows: Subcommittee 6 is responsible for providing a resource.
CUSC Amendment Panel Recommendation
Smart Grid Update – January 2011
Timeline: Preparation of the UNFCCC Budget 2020/2021
Affiliate Member Dues Billing Program Timelines
International Civil Aviation Organization
PCS Technical Board 27th February 2018, Vienna.
Report of the Technical Subcommittee
TGg Report to the IEEE Working Group
SACS Working Group Continual Commitment to Accreditation and Educational Improvement April 18, 2012.
STUDY COMMITTEE A1- ROTATING ELECTRICAL MACHINES
Updating the 2004 CPI Manual
Calendar Overview – Phase I – REVISED April 2019
2015 January February March April May June July August September
Presentation transcript:

CIGRE WG C4.32 – Understanding of the Geomagnetic Storm Environment for High Voltage Power Grids WG Composition: WG Convener: W. A. Radasky 11 full members from 8 countries There are 9 additional corresponding members with 1 more country WG Timeline: Start Date: 1 January 2013 Expected Date for Submitting Final Report to SC Chairman: 31 December 2016

CIGRE WG C4.32 – Understanding of the Geomagnetic Storm Environment for High Voltage Power Grids Highlights of Recent Activity: 5th WG meeting was held in Tromso, Norway from 29-30 September 2015 6th WG meeting was held in Rio de Janeiro, Brazil from 31 March – 1 April 2016 A workshop was organized by Alexandre Pinhel on 5 April 2016 with the Brazilian power industry, space industry and government. WG members participated as speakers Future Activity: Last WG meeting is planned for Paris on the weekend before the main meeting

CIGRE WG C4.32 – Understanding of the Geomagnetic Storm Environment for High Voltage Power Grids Other Items: We have finalized the TB outline and have made writing assignments We plan to review section drafts by correspondence and to develop a full draft before the Paris meeting During the Paris meeting we plan to review the complete draft and plan to finalize any editing to be done We recognize this is an aggressive schedule, and we will update our status at the SC C4 meeting in Paris