Infrastructure Delivery Management Toolkit:

Slides:



Advertisements
Similar presentations
Introduction to our Facilities Management Services
Advertisements

Long Term Capital Works Planning - An Evidenced Based Process Vivek Kangesu BSc Eng (Hons), MBA, MIEAust, CPEng, RPEQ.
ACES Presidential Conference 2011 Turning Data into Wisdom Terry Pitt MSc FRICS MIAM © Atrium Software Ltd 2011.
Effectively Integrating Information Technology (IT) Security into the Acquisition Process Section 4: Effective Integration.
Application of Asset Management Principles During Asset Creation and Design Presented By Pervaiz Anwar at: CWEA, San Francisco Bay Section Asset Management.
Electricity Meter Installation QC and Audit Total Geo-spatial Information Solutions Johann Engelbrecht Director.
Asset Management Data & Systems Jim Wilkin. Asset management a corporate function Asset Management group Centralised asset management database, Asset.
NGEC - SFTF Structure and Finance Task Force Eric Curtit, MODOT Section 6 Project Update.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 3: Operations & Maintenance 1.
Presentation Roadmap Maintenance Contract Model Options
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
Federal Property Management Professor Andrew Baum September 19th 2014.
Comparison of International P3 Model, Corp and Hybrid Lease The Great Debate:
Accounting systems design & evaluation
Manage the Facility Condition Index (FCI)
2012 Business Plan Finance and Facilities Successes - Finance Ongoing Activities: – Year end reporting and audit for the City and PMEDC – Property.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 1: Portfolio Management Infrastructure Planning:
SA Local Government Procurement Forum “Value for Money” Amendments to the Local Government Act….. what does it mean?, how do you manage it? how do you.
SESSION 10 ASSET SEGMENT PRESENTED BY: NATIONAL TREASURY.
Maximising Investment Opportunities: releasing value from estates Barclays Private Equity 15 th May 2008.
American Model. Public-Private Partnerships Public Development Private Development Public-Private Partnerships PrivatizationSubsidization.
Reserve Study A Short and Long Term Budgetary Planning Vehicle
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
1 Infrastructure Blue Ribbon Commission November 18, 2010 July 18, 2011 December 22, 2011 Council Work Session July 18, 2011 City of Palo Alto.
BTEC National Diploma – IT Practitioners Unit 16 - Maintaining Computer Systems.
MAINTENANCE, REPAIR, REHABILATATION, REFRUBISHMENT, UPGRADE AND ADDITION National/Provincial Road shows July/ August
Presentation on Preventive Maintenance
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
ASSOCIATED BENEFITS OF mSCOA IN THE ASSET LIFE CYCLE
CHAPTER#17 ENGINEERING MAINTENANCE MANAGEMENT Lecture No. 16Course: Engineering Management MED DEPARTMENT, U.E.T TAXILA COURSE INSTRUCTOR : PROF. DR. SHAHAB.
1 Age of Smithsonian Facilities Age of Buildings From Museums And Facilities: Critical Assessment and Improvement Objectives.
2014 NPMA Spring Seminar Value Through Professional Asset Management Property 101 Basic Property Tara Miller PMP, CPPM, CF Beth Green CPPM, CF Consultant.
2013 NPMA Fall Conference Value Through Professional Asset Management Property 101 Basic Property Tara Miller PMP, CPPM, CF Beth Green CPPM, CF Consultant.
Criminal Justice System Modernization Project: DPW’s Infrastructure Projects 24 June
International Security Management Standards. BS ISO/IEC 17799:2005 BS ISO/IEC 27001:2005 First edition – ISO/IEC 17799:2000 Second edition ISO/IEC 17799:2005.
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
PRESENTATION TO THE PORTFOLIO COMMITTEE ON CORRECTIONAL SERVICES SERVICE LEVEL AGREEMENT 02 June 2010.
Mobile GIS in Local Government to enhance Service Delivery Total Geo-spatial Information Solutions Johann Engelbrecht Director.
A Risk Based Approach to Asset Management of Alcoa’s Civil Infrastructure in WA Presented by DENNIS FOO, Industrial Maintenance Roundtable ( IMRt )
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 1: Portfolio Management Introduction Sonny Schmidt.
The BIM Toolkit – An introduction. Overview UK Government Level-2 BIM BIM Toolkit – Technical content BIM Toolkit - Functionality.
Infrastructure Delivery Management Toolkit:
Long Term Capital Works Planning - An Evidenced Based Process
ITIL: Service Transition
Asset Management Data & Systems
Infrastructure Delivery Management Toolkit: 2010 Edition
Infrastructure Delivery Management Toolkit: 2010 Edition
Infrastructure Delivery Management Toolkit: 2010 Edition
JUSTICE AND CORRECTIONAL SERVICES PORTFOLIO COMMITTEE PRESENTATION: LEASES Portfolio Committee on Justice and Correctional Services 04/08/2015.
Information Technology Controls
Software Configuration Management
City Owned Land And Building Review
Chapter 18 Maintaining Information Systems
Procurement’s Impact on Logistics.
Infrastructure Delivery Management Toolkit: 2010 Edition
COST PLANNING AND ESTIMATION
HSE Case: Risk Based Approach.
Financial Audit Presentation Year Ended June 30, 2018
Asset Management Data & Systems
  FRAMEWORK FOR THE IDENTIFICATION & ACQUISITION OF LAND FOR HUMAN SETTLEMENTS DEVELOPMENT 4 AUGUST 2015.
Long Term Capital Works Planning - An Evidenced Based Process
PLANNING DOCUMENTS 2018 New Mexico infrastructure finance conference
Managed Content Services
IDEAL CLINIC PROGRAMME
P3 for Small and Midsize Governments
BASICS OF PUBLIC PRIVATE PARTNERSHIPS
Reliability information databases and feasibility within accelerator community Heinrich Humer (AIT Austrian Institute of Technology) Alexander Preinerstorfer.
Presentation to the Portfolio Committee 20 November 2018
Dollars and Cents: Ways to Save and be More Resourceful
Presentation transcript:

Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 3: Operations & Maintenance development through partnership

Contents of this presentation Context within the Delivery Processes Summary of contents of DP3 module development through partnership

Context within the Delivery Processes Operations and maintenance

Summary of contents of this module Summary of O&M module contents Process diagram Process and sub-process explanation Asset management team general O&M activities Acquisition of assets Disposal of assets Asset hierarchy Technical condition assessment surveys Asset management: O&M Facilities Management ‘Engineering Infrastructure Management, Property Management, Asset Register Maintenance Remaining life-cycle costing Risks

Summary of contents of this module The O&M Process Asset recognition Mobilisation for Facilities Management Asset operations, which include Facilities management Engineering infrastructure management Property management Condition assessment surveys and Remaining life-cycle costing Maintain assets The demobilisation of Facilities Management

Summary of contents of this module General O&M information Asset Management team general activities Planning of tasks/activities Execution of tasks/activities Logging of performance and task results Analysis of data Corrective action and improvement Feedback Acquisition of assets Acquisition of land Acquisition of assets other than land Disposal of assets Asset hierarchy An engineering asset/system Engineering asset: pump room Engineering system: pump system Engineering subsystem: a pump Engineering component: a flange A building asset A building: office block A building system: The fire system A building subsystem: fire detection Component: a sensor

Summary of contents of this module General O&M information (continue) Asset Management: O&M Facilities Management (FM) FM: soft services FM: hard services (MEP) Building repairs and preventative maintenance O&M Planning Procurement Infrastructure (Engineering) Management Engineering infrastructure Infrastructure repairs and preventative maintenance Planning Property Management Acquisition of property Managing rates and municipal services payments Lease management General advice on property management, e.g. valuations State Land Management Asset Register Ownership of Asset Register Purpose of Asset Register Typical Information Captured in Asset Register Users of Asset Register

Summary of contents of this module General O&M information (continue) Maintenance Maintenance process Definition of Maintenance Maintenance activities Condition assessments Inspections Servicing Repair Type of maintenance Preventative maintenance Essential maintenance, and Condition-based works (of capital nature) Remaining life-cycle costing Remaining life-cycle costing elements Time-value of money Costing of Asset Management: Operations Utility costs, rates and taxes Facilities Management: Soft Services Hard services and maintenance Major upgrades, refurbishments and renovations Disposal

Conclusion and questions Thank you