When the building is at first floor level it is time for the joiners to fix the ceiling joists as the brick layers are ready to start building the second story
Special heads in position
Another view of the special heads
Floor joists in position
Floor joists supported on a wall
Floor joists on hangers
Joists supported to leave space for the stairwell
Steel beam on a pad stone
Steel beam in position to support upper wall
Strapping to hold special heads in position
Steel head in position
First floor joists built in position
Ceiling joists from above
Joists supported during building
Steel beam as the span over the garage is too big for the joists
The steel beam from above
Temporary support until wall is built
Beam now built in position supporting a joist