When the building is at first floor level it is time for the joiners to fix the ceiling joists as the brick layers are ready to start building the second.

Slides:



Advertisements
Similar presentations
Framing.
Advertisements

Module Floor Systems.
Sunny day, installing exterior casings on the windows.
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Type III Legacy Buildings Prosser Fire District 3 - Officer Development.
CEILING FRAMES Created by Michael Martin March 2004 / Revised Feb 2007.
CEILING FRAMES Created by Michael Martin March 2004
Welcome to Our House. The Add On Project The tear down The slab Framing the Walls.
Competency: Draw Wall Sections
Fitting Door Frames To Cavity Brickwork & Brick Veneer Your Ref: from P11 of text M.S.Martin Sept 2005 M.S.Martin Sept 2005.
Parts of typical slab formwork
INAR 243 FLOORS.  Structural element  Proper ground for functions.
Structural System Overview
Revision Quiz Click your mouse, read the question, click again to reveal the answer M. S. Martin October 2007.
Earthquake Basics Section 2. +What causes earthquakes? +How do earthquake forces enter buildings? +How does the building respond? +What building elements.
1 Presentation 38: STAIR SAMPLE CALCULATION. 2 Sample Stair Calculation 8′-0″ 11 ¼″ Given: –Upper Const. = 11 ¼″ –Floor to ceiling = 8′-0″ –Headroom =
IRC 2009 Habitable Attics.
Creating a section view using floor plans
HEAT LOSS If the conservatory is not heated from the main heating system or it has an external quality door fitted i.e. double glazed patio or similar.
Chapter 19 Floors.
Architectural Drawing Structural Calculations. Beams and Girders Beams or girders support floor joists over long spans. Beams or girders May be wood or.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Floor Systems and Foundation Support
BCT 102 Residential Printreading
BEAMS,COLUMS AND LINTELS
Floor Faming Wall Framing
NGfL CYMRU GCaD SITE CARPENTRY.
Grimsby Secondary School TCJ3C
My Work Plan Carla Dickof.  I have reviewed the literature review done within our group  I am currently reviewing further case studies as well as research.
Balloon Frame North-American invention, 1833
Site Report Poroton Home to Building shell – in record time.
Wall and Ceiling Construction
Ceiling Framing Unit 32.
1 Building Types. 2 Building Use and Size Buildings are available in many types and sizes. Large, specialized buildings should be planned and built by.
Choose a category. You will be given the answer. You must give the correct question. Click to begin.
Chapter 25 Framing Methods. 2 Links for Chapter 25 Balloon Framing Platform Framing Post-and-Beam Framing Related Web Sites Steel Construction Concrete.
BUILDING THE FRAME Walls are constructed in sections, lying down on the floor platform and then tilted up into position. Fundamentals of Building Construction,
+ Sill and Floor Construction Vocabulary. + Anchor Bolt A threaded rod inserted in masonry construction to anchor the sill plate to the foundation.
When the sub floor is ready the bricklayers can then move onto the site and build the main shell of the house.
Wall and Ceiling Construction
Marieclaire Monasterio Aracelis Cedeño
What is architecture?. Lecorbusier ““Architecture is the learned game, correct and magnificent, of forms assembled in the light.” Louis Kahn - “Architecture.
Residential Construction
BEAMS: Beams are structural members that can carry transverse loads which produce bending moments & shear force. Girders: Main load carrying members into.
Arch bridges Arch bridges cannot bend, that is why they are made from many different types of materials such as masonry materials eg. Stone, brick etc.
Bridges.
 A framed structure is a structure supported mainly by skeleton.  Rigid frames have fixed joints that enable the frames to resist lateral forces; other.
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
Copyright © Texas Education Agency, All rights reserved. Architectural Design Architectural Models.
Floor Framing.
What Are The Advantages Of Using The Ceiling Racks in the Garage.
CARPENTRY By: Jason Burkhart. The installation of your floor system will depend on the design of your house. The guidelines we will use are 24ft wide.
Competency: Draw Wall Sections
UPPER FLOORS TIMBER AND CONCRETE.
Types of ground floors.
Why Know Building Construction
Architecture Mr. Graves
•Connecting to the Foundation & Bearing
G R E A T L A K E S B U I L D E R S A Re-construction Company Specializing in Structural Remediation and Alterations.
Wood Frame Construction
STAIR SAMPLE CALCULATION
Before any other work can start inside the house the joiners have to return and put a floor on top of the ceiling joists.
Competency: Draw Wall Sections
At ridge height for family room
When all the first fix electrical and plumbing is finished the roofers return to fix the ceiling sheeting in place so the plasterers can arrive on site.
Queen Post Truss Queen post trusses are not common in modern construction but they are still used. The example on the right shows exposed queen post trusses.
TRADA trusses TRADA trusses may look complicated but if you run through this sequence a couple of times the construction should be easier to understand.
Couple Roof ridge wall plate.
Bridges.
How do architects determine the number of beams needed?
Presentation transcript:

When the building is at first floor level it is time for the joiners to fix the ceiling joists as the brick layers are ready to start building the second story

Special heads in position

Another view of the special heads

Floor joists in position

Floor joists supported on a wall

Floor joists on hangers

Joists supported to leave space for the stairwell

Steel beam on a pad stone

Steel beam in position to support upper wall

Strapping to hold special heads in position

Steel head in position

First floor joists built in position

Ceiling joists from above

Joists supported during building

Steel beam as the span over the garage is too big for the joists

The steel beam from above

Temporary support until wall is built

Beam now built in position supporting a joist