Comply with Safe Operating Procedures

Slides:



Advertisements
Similar presentations
Always start a vehicle correctly
Advertisements

PDO Incident First Alert – Galfar
Always use the correct lifting equipment
Always comply with Defensive driving techniques
PDO Second Alert What happened? Your learning from this incident..
Always use mechanical handling aids when carrying out a heavy lift
Always use mechanical handling aids when carrying out a heavy lift
Always stay alert while driving, and observe other drivers behaviour
Always use 3 points of contact when using ladders
PDO Second Alert Date: Incident : LTI What happened?
Don’t pull a twisted sling
Always stay out of the line of fire
Never place yourself in line of fire
Ensure all safety covers and guards are secured and in place
Maintain 3 point contact when you climb Ladder
PDO Second Alert Stay out of the line of fire What happened:
Drive with appropriate speed to road conditions
Identify Pinch Points and keep your Hands & Fingers away
Use right tools for the job and use them correctly
Do not work at height without fall protection
PDO Second Alert Date: Incident type: LTI What happened?
Always wear fall protection equipment when working at height
Ensure to use the right tools and equipment for the activity
Avoid taking shortcuts
Ensure a working platform is adjusted and used
Follow Management of Change for an activity which is not in permit
Keep away form ‘line of fire’
Keep away from “Line of Fire”
Always use the correct tools for the job
Always use the right equipment for the task !!!!
Ensure 3 point contact maintained whilst using ladder
Ensure OHL Clearance required for your lifting activity
No hands on elevator while delivering pipe
Never put your Hands in line of fire
Always stay out of the line of fire
Ensure cat line are under tension before removing elevator bolts
PDO Second Alert Date: Incident title: LTI What happened?
Beware of Fall hazards while working at edge of trailer
If in doubt – stop the job
Photo explaining what was done wrong
Pay attention to your footing
Unsecured pup joint falling
PDO Second Alert Date: Incident title: HiPo MVI
Crane operating with boom lowered and under Supervision
PDO Second Alert Date: Incident: LTI What happened?
PDO Second Alert Use Hands Free Lifting Aids What happened?
Always report Near Misses
Do not stand in the LINE OF FIRE
PDO Second Alert Date: Incident title: HiPo Asset Damage
Always use secondary retention
Never place yourself in “line of fire”
Always keep your hands away from crush points (Line of Fire)
Always use your hands to set the slips
Always assess the risks, Stop and think.
Ensure that all Rig moves are carried out by competent personnel
Always stay away from line of fire
PDO Second Alert What happened? Your learning from this incident..
PDO Second Alert Date: Incident title: HiPo What happened?
Your health is your responsibility
Check equipment prior to start the job
PDO Second Alert What happened? Your learning from this incident..
Seek assistance of Banksman while reversing the vehicle
Always keep your equipment maintained
Check Level Setup prior Lifting & Lowering Operation
Keep away from “Line of Fire”
Always position the crane boom correctly before slinging the casing
Keep away from the line of fire
Beware of raised edges of walk ways.
Keep hands out of the line of fire
Use hands-off where possible
Presentation transcript:

Comply with Safe Operating Procedures PDO Second Alert Date: 01.08.2016 Incident title: LTI What happened ? Whilst off-loading a Post Weld Heat Treatment machine from a pickup with a Load all, the rigger used a single sling belt to lift up the machine and offload it on to uneven ground. He attempted to adjust it on the ground, however the machine swung to its right landing on his foot resulting in multiple fractures to his right foot. Learning from this Incident: Always comply with the standard lifting procedures and never take a shortcut. All the lifting activities should be carried out under proper supervision. Stay out of the line of fire. Comply with Safe Operating Procedures

Management self audit Date: 01.08.2016 Incident title: LTI As a learning from this incident and to ensure continual improvement all contract managers must review their HSE HEMP against the questions asked below Confirm the following: Does the crew make use of 10 point checklist for lifting ? Do the supervisors verify available resources before assigning the task? Does the supervisor monitor the proper use of equipment as per SOP? Does the crew discuss among themselves the hazards identified in the HEMP? Does the crew leader ensure required control measures are in place? Do the supervisors encourage intervention culture among the workforce? Are the workers aware of consequence Management in case of non-compliance to LSR? Make a list of closed questions (only ‘yes’ or ‘no’ as an answer) to ask other contractors if they have the same issues based on the management or HSE-MS failings or shortfalls identified in the investigation. Pretend you have to audit other companies to see if they could have the same issues.