Rod adaptors for module tests Module positioning studies

Slides:



Advertisements
Similar presentations
Conclusions on torque and grease1 Alexander Dierlamm, Michael Eppard (CERN) Measurements of thermal contact between TOB module and rod May 2004.
Advertisements

G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
1 Outer Tracker Mechanics, indico: May 2014, A.Onnela 21 May 2014 Thermally conductive carbon-fibre composite material for module and mechanics.
AIDA Infrastructure for very forward calorimeters 13/11/2012 In collaboration with: François-Xavier Nuiry Andrea Catinaccio Konrad Elsener 113/11/2012AIDA.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
2S Module Workshop, 30 Jan 2012 Module positioning and cooling contacts 2S Module Workshop, 30 Jan 2012 Antti Onnela, CERN  The objectives  Module positioning.
AIDA Infrastructure for very forward calorimeters Design proposal Mechanical support structure Designers:In collaboration with: Eric DavidFrancois-Xavier.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
TIB-TID insertion test into the CMS Tracker cylinder ________________________________________________________ Tracker week july 04
Geometrical Measurements of the TEC Elements Goals internal survey external survey LINK calibration Means 3D CMM Cosmics Geodesy Procedure Conclusions.
DBQ support – motorization and performance upgrade Mateusz Sosin EN/MEF-SU.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
1 Outer Barrel, Phase 2 Mech Review 26 Aug 2013, indico: Antti Onnela, CERN Tracker Phase 2 Mechanics Review, 26 August 2013 Status of the Outer.
Neil Jackson University of Liverpool Hiroshima Symposium June THE ATLAS SEMICONDUCTOR TRACKER (SCT) A PRESENTATION ON BEHALF OF THE ATLAS.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
1 2S Module meeting, 24 September 2012 S tudies on module support inserts Refers to work by Riikka Häsä, Helsinki Institute of Physics, summer student.
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
PH/DT2 Scientific Tea PH-DT2 Scientific Tea, 29 April 2005 : The CMS Tracker - Mechanical Aspects Antti Onnela, PH-DT2: 1. CMS Tracker and.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Large GEM prototype production NS2 technique. Reminder NS2 technic 10 to 15mm Readout connector O-ring Drift electrode Free to slide External screws to.
Iterative local  2 alignment algorithm for the ATLAS Pixel detector Tobias Göttfert IMPRS young scientists workshop 17 th July 2006.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
EC: 7 DISK concept Preliminary considerations
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
BM&N STS ladders assembly in VLHEP
Florian Buchsteiner (HEPHY Vienna)
Profiler Mechanics Update
For the CMS Pixel detector
Alignment of the CMS Tracker
Detector building Notes of our discussion
on behalf of the CLIC active pre-alignment team
Service channels between Tracker and PP1
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
Service channels between Tracker and PP1
Strip Petals: Local supports and prototype tests
July 2, 2007 ID CERN S. Terada KEK Module and Service Structure Designs -Super module conceptual design- - FEA thermal analyses- -Test of angled.
For the CMS Pixel detector
Antti Onnela CERN – EP – Detector Technologies group
Tracker Outer Barrel COOLING Antti Onnela, CERN.
LumiCal mechanical design, integration with LDC and laser alignment
Phase 2 Outer Tracker Module analysis
Low Mass mechanical design
2S module geometry updates Module positioning concepts
Ideas and Plans on Tracker Module Mechanics Developments
WG4 – Progress report R. Santoro and A. Tauro.
New Design for Beam Test Structure
Design and fabrication of Endcap prototype sensors (petalet)
Tests on a dummy facet of PIX upgrade using CO2 cooling
Recent updates to the 2S module geometry Towards first dummy modules
Upgrade Phase 2 Mechanics meeting, 21 March 2013 Introduction
Advantages and Challenges of this design Today status of the design
Outer Tracker Module Design meeting, 27 January 2014 News on the PS and 2S module geometries 200 W / 2m 100 W / 5m News on PS and 2S module geometries,
For the CMS Pixel detector
Updates on the Silicon Tracker 2S Module
Presentation transcript:

Rod adaptors for module tests Module positioning studies 2S Module meeting, Tracker week, 16 July 2012 Rod adaptors and studies on module positioning Refers to work by Tristan Falcy, Luc Kottelat, Aleksis Chávez Niemelä and Riikka Häsä Rod adaptors for module tests Module positioning studies On-going + Next tasks Summary 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Rod adaptors for module tests 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

TOB Rod with 2S modules 2S module Adaptor Existing TOB rods (tens available) can be used for first module tests E.g. cooling tests But, new module dimensions do not directly match the rod Need adaptors TOB Rod frame 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

TOB Rod with 2S modules 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Adaptor design 3 connection bars in carbon-fibre composite Support and alignment of the 2S module Support and alignment on the rod 4 support/cooling contacts in aluminium 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Adaptor production 2 adaptors have been produced Completed adaptor 3 connection bars in carbon-fibre composite 4 support/cooling contacts in aluminium 2 adaptors have been produced More adaptors can now easily be made, if/when needed. 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Rod + Adaptor + 2S module mock-up 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Module positioning studies 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Barrel rod with 2S modules 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Studies on module positioning Study on combining module positioning inserts and captive screws (for improved module handling) Module placed on supports Module Positioning Screws tightened Support structure 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Study on module positioning Aluminium dummy module placed on a support plate Small brass positioning inserts and captive screws Optical measurement of module positioning Positioning inserts + captive attachment screws and nearby optical targets “Module” in aluminium Support plate in aluminium Attachment screws 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

H7 tolerance on Ø2.5 and Ø3 holes: 0 - +10 μm 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Study on module positioning Module positioning insert (brass) and captive M1.6 screw with a spring h8 tolerance on Ø2.5 and Ø3 axis: -14 – 0 μm 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Precision (repeatability) of the positioning σ = 10 μm Dummy module installed and removed 8 times, with its position measured after each installation. Optical measurement accuracy: +/- 2µm Mean value of results normalized to zero σ = 17 μm σ = 11 μm 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Conclusions from these positioning studies Precision of ~ 10-20 μm (1 sigma) in module positioning can be rather easily obtained with such small 2 mm high positioning inserts. If necessary, the precision can be increased by tighter manufacturing tolerances on the components Precise ‘slot’ hole is more difficult to produce than a precise round hole. Note: For sufficient cooling contact the module attachment screws must be well tightened. Therefore, the long-term stability is better than the initial precision of such module positioning system. Captive screws work nicely, but they are space-consuming, need a ‘high’ support insert Problems with available space and added mass on the final rod assembly Simple screws are now considered 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

On-going + next tasks 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Module support design Used as base-line: Rod with modules upside up. Space for module supports, positioning and screws? Combine support of two modules? Modules upside up + Radial distance between adjacent sensors is minimized + Connectors are well exposed Total thickness is potentially rather big (here 24 mm). Thickness depends directly on the biggest components Tight space for module supports and thermal contacts Modules upside down + Total thickness minimized (here 15 mm), allowing compact barrel layers + Components are not exposed (= better protected) in the final assembly + Good space for module supports and thermal contacts Radial distance between adjacent sensors is big. Difficult access to connectors on the module 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Thermal design of the module supports According to preliminary calculations ΔT of ~5 ˚C expected in the module Allowing total of 10 ˚C ΔT from silicon to coolant leaves ΔT max 5 ˚C for the module support – cooling pipe – fluid (CO2) Analysis and preliminary optimisation on module supports on-going Optimisation between mass and thermal performance of the module support insert ΔT: 5-7 ºC ΔT: ~5 ºC Module analysis (Andreas Mussgiller) Support insert analysis (Riikka Häsä) 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Module and rod overlaps Module supports and Cooling contacts at the rod overlap area? 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Module holders Module holders to allow safe access to module front and back sides. During module assembly work During bonding During testing During transports Can one single holder do all, or are different holders for different steps necessary? Images of preliminary concept studies 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Summary Adaptors for mounting 2S modules on TOB rods have been designed and 2 first adaptors made. When planning for module thermal tests see if the adaptor + TOB rod could be a solution. More adaptors, possibly with different geometries, can be produced. Module positioning studies done with very dummy modules. Reasonable positioning precision achieved with small positioning inserts. Precision can be improved if needed. Work on-going with module supports. Need to make them small, for mass and also for limited space available. Thermal performance needs to be sufficient. Particular challenges in the rod-to-rod overlap area First concepts of module holders for assembly, tests, transports 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Thank you for your attention. 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Spare slides 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

2S module, Jan 2012 version 3D models by A. Conde Garcia / CERN 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Module positioning: TIB Inputs from A. Basti / INFN Pisa Precision insert Slot insert Inserts with clearance 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Module positioning: TEC Inputs from M. Wlochal / Aachen 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Module positioning: TOB 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Module support and positioning: TOB Support structure (Rod) 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Module support and positioning: TIB Support structure (Cylinder) 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Module support and positioning: TEC Support structure (Petal) 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

And the net result with TK precision? Already after first cosmic runs the total residuals with Track Based Alignment are at ~50um rms, and improve within 2008 to ~30um. Much better than what the mechanics can (reasonably) do! 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

Choice of module positioning concept? All used module positions solutions in the present Tracker have shown to be sufficiently precise, especially after track-based software alignment. TIB / TEC module positioning is more compact and lighter than the TOB solution. Use the TIB / TEC solution as basis in the 2S module Try to also include captive screws, which do not need to be handled individually during module testing and assembly phases. 2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN

2S module meeting, 16 July 2012, indico: 197203 Antti Onnela, CERN