Test-rigs outside CERN

Slides:



Advertisements
Similar presentations
UNIX System Programming Installing OpenSolaris. 2/86 Contents How to setup a virtual machine guest How to install OpenSolaris as a guest How to update.
Advertisements

Microsoft Virtualization Last Update Copyright 2011 Kenneth M. Chipps Ph.D.
Motherboard, BIOS and POST The external data bus connects devices on the motherboard together. Everything is also connected to the address bus. These busses.
Upgrading Software CIT 1100 Chapter4.
Basic Input Output System
Uli Schäfer 1 (Not just) Backplane transmission options Upgrade will always be in 5 years time.
Installing Windows 7 Lesson 2.
Lesson 15 – INSTALL AND SET UP NETWARE 5.1. Understanding NetWare 5.1 Preparing for installation Installing NetWare 5.1 Configuring NetWare 5.1 client.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
MCTS Guide to Microsoft Windows Server 2008 Network Infrastructure Configuration Chapter 8 Introduction to Printers in a Windows Server 2008 Network.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
Client Management. Introduction In a typical organization there are a lot of client machines used for day to day operations Client management is a necessary.
Computer Maintenance Unit Subtitle: Basic Input/Output System (BIOS) Excerpted from 1 Copyright © Texas Education Agency, All.
ITE 1 Chapter 5. Chapter 5 is a Large Chapter It has a great deal of useful information about operating systems. You will find this VERY helpful when.
October, Scientific Linux INFN/Trieste B.Gobbo – Compass R.Gomezel - T.Macorini - L.Strizzolo INFN - Trieste.
Please Note: Information contained in this document is considered LENOVO CONFIDENTIAL For Lenovo Internal Use Only Do Not Copy or Distribute!! For Lenovo.
Windows 2003 Installation/Upgrade and Update. Checking Compatibility Supported Upgrade paths Using the MS Windows Upgrade Advisor HCL (Hardware Compatibility.
Uli Schäfer 1 JEM configurator progress FPGAs are RAM-based programmable logic devices Need to be loaded with a ‘configuration’ after power-up, so as to.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Basic Input/Output System
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Multistep Runs with ROD Crate DAQ Murrough Landon, QMUL Outline: Overview Implementation Comparison with existing setup Readout Status ModuleServices API.
Training on Basic Software Hardware Installation
Virtual Machines Created within the Virtualization layer, such as a hypervisor Shares the physical computer's CPU, hard disk, memory, and network interfaces.
Page 1 of 38 Lenovo Confidential Lenovo Confidential Lenovo Confidential Lenovo Confidential Lenovo Confidential Please Note: Information contained in.
Computer Maintenance I
15-Feb-02Steve Traylen, RAL WP6 Test Bed Report1 RAL/UK WP6 Test Bed Report Steve Traylen, WP6 PPGRID/RAL, UK
36 th LHCb Software Week Pere Mato/CERN.  Provide a complete, portable and easy to configure user environment for developing and running LHC data analysis.
CMM++ activities at MSU Y. Ermoline et al. Level-1 Calorimeter Trigger Joint Meeting, CERN, 13 – 17 September 2010.
By the end of this lesson you will be able to explain: 1. Identify the support categories for reported computer problems 2. Use Remote Assistance to connect.
John Samuels October, Why Now?  Vista Problems  New Features  >4GB Memory Support  Experience.
2-December Offline Report Matthias Schröder Topics: Monte Carlo Production New Linux Version Tape Handling Desktop Computers.
This slide deck is for LPI Academy instructors to use for lectures for LPI Academy courses. ©Copyright Network Development Group Module 01 Introduction.
UNIX U.Y: 1435/1436 H Operating System Concept. What is an Operating System?  The operating system (OS) is the program which starts up when you turn.
TDAQ status and plans for 2008 Carlos Solans TileCal Valencia meeting 17th December 2007.
L1Calo DBs: Status and Plans ● Overview of L1Calo databases ● Present status ● Plans Murrough Landon 20 November 2006.
Online Software Status ● Overview ● Recent Changes ● Required Changes ● Desirable Changes ● Upgrade ● Summary Murrough Landon 1 July 2009.
Online Database Developments ● Overview ● OKS database status and plans ● COOL database developments ● Validating calibrations ● Tools ● Summary Murrough.
VME Pixel ROD in UW Pixel Lab Final Report
Chapter Objectives In this chapter, you will learn:
ImageDiags 2.0 Overview Useful For How it can help you
Online Database Work Overview Work needed for OKS database
Chapter Objectives In this chapter, you will learn:
Seamless Guest OS's and more!
CMS DCS: WinCC OA Installation Strategy
LKr status R. Fantechi.
Computer and Information Technology for HKCEE
Dag Toppe Larsen UiB/CERN CERN,
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
Dag Toppe Larsen UiB/CERN CERN,
Computer Maintenance Unit Subtitle: Basic Input/Output System (BIOS)
SLC5 VME ROD based test system for Pixel DAQ: Outlook for Spring 2014
Run Control (and Other) Work
VME Pixel ROD Setup in UW Pixel Lab B050
Online Database Status
LCGAA nightlies infrastructure
Recent Online SW/DB Changes
Online Software Status
Remaining Online SW Tasks
Introduction to Computers
Online Software “To Do” List
How to Solve macOS Sierra Update Problem on your Mac ?
L1Calo Joint Meeting Introduction
IS3440 Linux Security Unit 7 Securing the Linux Kernel
Operating System Introduction.
Introduction to Computing
RapidFinder Analysis Software How-To Guide
Introduction to BIOS Prof. Shamim Ahmad Hakim
CMS HGCal: Research Update
Presentation transcript:

Test-rigs outside CERN Christian Göringer, Juraj Bracinik, Andrei Khomich University Mainz Joint Meeting Heidelberg 2010 Content: Introduction to test-rigs Status of test-rigs Discussion of some issues

Test-rigs and what they are used for Roughly: institutes that have developed and support modules (JEM,CPM,PPM) maintain a test-rig Used to Test modules themselves Test and develop/improve module firmware Test and develop/improve module software Adapt module software due to L1Calo/TDAQ framework changes (also Murrough does a great job here) Develop and test “upgrade modules” (“new MCM” design, GOLD module, CPM hit merging FW etc.) 11.01.2010 Joint Meeting Heidelberg 2010 - Christian Göringer

Typical configuration Data source (crate): PPM/LSM/ Custom Board Modules crate: PPM/JEM/CPM Readout (crate): ROD, Module itself Each crate has a diskless SBC* (also called “crate CPU”) connects software via VME-bus-driver to hardware Each test-rig needs a local installation of the TDAQ software L1Calo software *Single Board Computer 11.01.2010 Joint Meeting Heidelberg 2010 - Christian Göringer

Characteristics of the Birmingham test-rig Hardware (Major) Modules: LSM, CPM, ROD Software SLC 4 (Kernel 2.6.9-89) TDAQ 02-00-02 Status VME drivers from old kernel (2.6.9-67) used Everything besides ROS/ROD working 11.01.2010 Joint Meeting Heidelberg 2010 - Christian Göringer

Characteristics of the Mainz test-rig Hardware (Major) Modules: LSM, JEM Software SLC 4 (Kernel 2.6.9-89) TDAQ 02-00-02 Status Would be ready if VME drivers were working, need to compile them (to be done) 11.01.2010 Joint Meeting Heidelberg 2010 - Christian Göringer

Characteristics of the Heidelberg test-rig Hardware (Major) Modules: PPM Software SLC 4 (Kernel 2.6.9-89) TDAQ 02-00-03 Status VME drivers compiled by Andrei TDAQ 02-00-02 to 02-00-03 update took 2 weeks, but now everything works 11.01.2010 Joint Meeting Heidelberg 2010 - Christian Göringer

TDAQ upgrade/installation Usually a hard job involving lots of mails to other people (e.g. Murrough) and consuming large amount of time Some examples: TDAQ 02-00-02: needed to build both variants (opt and dbg) to prevent software from crashing, took time to figure out TDAQ 02-00-02: ignore options dropped, needed to disable logger in TDAQ files TDAQ 02-00-03: way of distribution changed, problems with new TDAQ installation scripts, tried to confirm but scripts were removed from pcatwww machine and not yet moved to atlasop.cern.ch 11.01.2010 Joint Meeting Heidelberg 2010 - Christian Göringer

Joint Meeting Heidelberg 2010 - Christian Göringer SLC4 vs SLC5 No guide how to run in compatibility mode Not yet native SLC5 software support L1Calo software at CERN still compiled at native SLC4 machine Plans and attempts of the test-rig maintainers There have been tries but no success Feeling is to stick to SLC4 until SLC5 migration is necessary (e.g. when our software runs natively) 11.01.2010 Joint Meeting Heidelberg 2010 - Christian Göringer

Hardware problems in Mainz Last week additional problems occurred: Harddisk used to boot crate CPU while setting up SLC4 wasn’t detected by BIOS any more Couldn’t enter BIOS any more to switch back to network boot Unknown reasons…hope no 2010 bug ;) Are there any settings that need to be made in the BIOS e.g. after resetting it via battery removal? 11.01.2010 Joint Meeting Heidelberg 2010 - Christian Göringer

Joint Meeting Heidelberg 2010 - Christian Göringer Summary Test-rigs still necessary to maintain modules Test-rigs are being used and planned to use for upgrade developments Need to keep pace with new TDAQ releases to have same environment Difficult and time consuming since new TDAQ version usually comes along with changes that need non obvious work(arounds) Feeling that we are going to stick to SLC4 as long as there is no urgent need or better documentation 11.01.2010 Joint Meeting Heidelberg 2010 - Christian Göringer