First of all we will remind some numbers:

Slides:



Advertisements
Similar presentations
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Advertisements

PANDA Mechanical Workshop Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Mechanical Workshop GSI
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
1 PST Heater Panel Design The PST heater panels are internally redundant resistive circuits printed onto a Kapton sheet with an aluminum backing. They.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
- PROPOSAL FOR A SOLUTION OF A “STRAW MODULE” INTEGRATION - INFN-LNF - SPAS -STRAW MODULES INTEGRATION- INFN-LNF-SPAS- December D. Orecchini – P.
Tracking Session, Groningen, August 30th, News from Krakow on the Forward Tracker J. Smyrski Institute of Physics UJ Model of the tracking stations.
Central Tracker Cabling and Mechanics Paola Gianotti26/4/111.
Comments on Services Elba Comments on Services & … Bill Wisniewski SLAC.
STT Detector risk’s assessment. STT detector work packages Straw Tubes modules Straw Tracker mechanics Front-End Electronics Analog electronics Digital.
Concept for LOKI detector system. Rear Detector 2 Spider Cob (central detector) Octant (Out detector) Maybe subdivided in two parts.
1)– CENTRAL TRACKER INTEGRATED ITEMS: > Central Tracker, “Assembly & Insertion Auxiliary Structure”. > “CSF”- Central Tracker Support Frame (In collaboration.
- “STRAW TRACKER AND CLASH ITEMS ANALYSIS. - “STRAW TRACKER AND STILL OPENED ITEMS ANALYSIS. - “STRAW TRACKER AND DANGEROUS ITEMS ANALYSIS. INFN-LNF -
EC: 7 DISK concept Preliminary considerations
Straw man layout for ATLAS ID for SLHC
Rosier Ph. – IPNO – Detector Dpt. – 30/10/2012GASPARD Padova meeting 1/13 Mechanical engineering for GASPARD Unité mixte de recherche CNRS-IN2P3 Université.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
STT gas system a possible implementation
Test beam straw prototype production status
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
“CENTRAL SUPPORT FRAME” -
STRAW TRACKER SYSTEM CAD STATUS :
Gaspard-Hyde-Trace workshop 2015
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
FCAL R&D towards a prototype of very compact calorimeter
Update of MVD services and requests
- CT INSTALLATION PROCEDURE OVERVIEW -
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
STRAW TRACKER CLASH AND INTEGRATION ANALYSIS- INFN-LNF - SPAS
cooling and supports of the forward endcap EMC
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Vertex Detector Mechanical R&D Design Questions and Issues
STT Status Update Peter Wintz (FZ Jülich) for the STT group
Requirements of the support mechanics
Some proposals on HV circuits realization for segmented straw detector
Chamber Design and Integration RE3/1 and RE4/1
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
SIT AND FTD DESIGN FOR ILD
Initial BIS installation
Integration and IR Hall
LST Module Installation
Overview of T1 detector T1 is composed by 2 arms
DET. Integration Inner detector envelope Radial clearances.
OT Survey & Adjustment Outline: Survey technique at present
TEC Services Status 30/12/2018 Nick Lumb.
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
BCM Overview Placement such that system is sensitive to all types of beam accidents. => 2 independent subsystems Halo losses inside the Pixel volume ie.
General wiring procedure for a new instrument
Inner DET. Integration Inner detector envelope Radial clearances.
Limited Streamer Tube Project Summary
as a prototype for Super c-tau factory
RE3/1 & RE4/1 Parameter Space Services
Presentation transcript:

We present today a new study for the housing of STT electronics, cables, gas pipes. First of all we will remind some numbers: STT channels and layout: numbers and nomenclature; electronics cards; number and types of signal cables, gas pipes, HV cables, etc... The aim is to make everybody aware of the status and to agree upon solutions.

LNF/SPAS -12/10/2012 SECTOR “A” SECTOR “B” SECTOR “C” N.5 OUTER STRAW MODULES: -13° MODULE 24+17+6= 47 STRAWS -12° MODULE 32+29= 61 STRAWS -11° MODULE 35+34= 69 STRAWS -10° MODULE 35+35= 70 STRAWS -9° MODULE 34+35= 69 STRAWS SECTOR “A” 316 N.4 SKEWED STRAW MODULES: -8° MODULE 30+31= 61 STRAWS -7° MODULE 28+29= 57 STRAWS -6° MODULE 26+27= 53 STRAWS -5° MODULE 24+25= 49 STRAWS 220 N.5 OUTER STRAW MODULES: -13° MODULE 24+17+6= 47 STRAWS -12° MODULE 30+29= 59 STRAWS -11° MODULE 38+37= 75 STRAWS -10° MODULE 38+37= 75 STRAWS -9° MODULE 36+37= 73 STRAWS N.4 INNER STRAW MODULES: -4° MODULE 22+23= 43 STRAWS -3° MODULE 20+21= 41 STRAWS -2° MODULE 18+19= 37 STRAWS -1° MODULE 16+17= 33 STRAWS 154 329 N.4 SKEWED STRAW MODULES: -8° MODULE 32+33= 65 STRAWS -7° MODULE 30+31= 61 STRAWS -6° MODULE 28+29= 57 STRAWS -5° MODULE 26+27= 53 STRAWS TOT. 690 SECTOR “B” 236 TOT. 690 N.4 INNER STRAW MODULES: -4° MODULE 24+25= 49 STRAWS -3° MODULE 22+23= 45 STRAWS -2° MODULE 20+21= 41 STRAWS -1° MODULE 18+19= 37STRAWS N.4 INNER STRAW MODULES: -1° MODULE 16+17= 33 STRAWS -2° MODULE 18+19= 37 STRAWS -3° MODULE 20+21= 41 STRAWS -4° MODULE 22+23= 43 STRAWS 172 154 TOT. 737 N.4 SKEWED STRAW MODULES: -5° MODULE 24+25= 49 STRAWS -6° MODULE 26+27= 53 STRAWS -7° MODULE 28+29= 57 STRAWS -8° MODULE 30+31= 61 STRAWS 220 N.5 OUTER STRAW MODULES: -9° MODULE 34+35= 69 STRAWS -10° MODULE 35+35= 70 STRAWS -11° MODULE 35+34= 69 STRAWS -12° MODULE 32+29= 61 STRAWS -13° MODULE 24+17+6= 47 STRAWS TOT. STRAWS 2117 SECTOR “C” 316

-The encumbrance of the connectors has not been considered! PATHWAYS OF FLAT CABLES BUNCHES -The encumbrance of the connectors has not been considered! - Flat cable cross section 28,6mm^2/each - Total: 28,6x85 = 2431mm^2 6 13 4 Weight: 0.059 kg/m 8 7 3 4 7 7 13 15 15 4 4 4 85 Flates (2890 Ch.) 13 8 8 4 4 0,65mm 4 13 15 14 6 4 7 44mm 3 7 8 4 13 6

Approx. weight of connector: 5g / Each FLAT CABLE CONNECTOR ELECTRONIC CARD CONNECTOR 56mm 10mm 7mm 13,5mm 6,6mm E_Card 52mm

HV CABLE DIMENSIONS GAS PIPE DIMENSIONS PATHWAYS OF HV CABLES AND GAS PIPES 12 Gas Pipes - The encumbrance of the connectors has not been considered! 20 HV Cables 4 Gas Pipes (From the Forward Side) 13 HV Cables 8 Gas Pipes (From the Forward Side) 13 HV CABLE DIMENSIONS 7 - Cross Section 8,1mm^2/each - Total: 8,1x20 = 162mm^2 (Each Pathway) - Weight: 0,0162 Kg/m 13 HV Cables 6 8 Gas Pipes (From the Forward Side) 13 13 HV Cables GAS PIPE DIMENSIONS - Cross Section 28,26mm^2/each - Total: 28,26x12 = 340mm^2 (Each Pathway) Weight: 0.016 kg/m 4Gas Pipes (From the Forward Side) 12 Gas Pipes 20 HV Cables

Thinner cables exist, but we have only 40... Weight: 0,0162Kg/m Out diam.: 3.2 mm L = 50mm Thinner cables exist, but we have only 40...

Weight: 0,0162Kg/m Outer diam: 6 mm

Mounting sequence: step 1 The ST modules are mounted in the mechanical frame. Each chamber is attached to the Central Support Frame

Mounting sequence: step 2 Area laterale 6092 mm2 An independent mechanical frame (material can be aluminum) is inserted and connected with the ST Tracker. Its duty is to support electronics and route cables and other services outside in the backward region.

Mounting sequence: step 2 - Electronics cards: one plane for each double-layers One of the advantages of this solution is that the weight of the electronics is decupled from the detector. The length of the straws is the maximum possible inside the mechanical frame. The connections between the electronics and the straw tubes should be made with flexible wires.

Mounting sequence: step 3 - Four areas have been left for the STT services Signals cables, HV cables, gas pipes etc.. are connected and routed in the 4 available zones.

Side view of STT detector after cables and gas pipes mounting - Forward region - Backward region 123 mm Gas distribution is done in the forward region, then gas pipe have to run along the external surface of the detector to reach gas-manifolds

Mounting sequence: step 4 Cable are attached to the routing system. Left and right boxes are filled with signal cables. Top and bottom space is for HV-cables, gas pipes and other services. NB: Where the flats bent, their thickness double. A test on a prototype is mandatory. The cable routing system is attached to the STT rails. It drives the cables outside of the PANDA magnet in a tidy way.

1600mm^2 6000mm^2

DIRC inner radius: 448mm -20 hv Cables -12 Gas Pipes DIRC inner radius: 448mm STT Cable housing: 443mm 85 Flates (2890 Ch.) EMC-BW: 413mm STT Cable housing: 410mm STT Cable housing: 410mm ADDITIONAL SPACE NEEDED: 10mm EMC-BW: 413mm