Controls CBETA controls will extend existing EPICS control system

Slides:



Advertisements
Similar presentations
Machine Physics at ISIS Proton Meeting 24 th March 11 Dean Adams (On behalf of ISIS Accelerator Groups)
Advertisements

Beam-based Measurements of HOMs in the HTC Adam Bartnik for ERL Team, Daniel Hall, John Dobbins, Mike Billing, Matthias Liepe, Ivan Bazarov.
Bunch shape monitor for Linac-4 A.V.Feschenko Institute For Nuclear Research (INR), Moscow , Russia.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Experimental set-up at E.S.R.F. L. Farvacque. 1/04/2004L. Farvacque - E.S.R.F.2 Experimental set-up Hardware Kickers Bpms Software Data acquisition processing.
Linac4 BPM and Phase Pickup L. Søby08/ LINAC4 Beam Position, Phase and intensity Pick-ups.
TUPD02 BEAM DIAGNOSTICS FOR THE ESS BLM BPM Trans Profile Bunch Shape BCM Preliminary System Count A. Jansson, L. Tchelidze, ESS AB, Lund, Sweden Hybrid.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Injector Setup/Mini-phase  Description of injector setup  sources of drift  Mini-phase procedure for injector  Checking the rest of the machine. Stephen.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
High Current Run I 2015 Feb 3 22:45 to Feb. 4 23:00 High Current Run II 2015 Feb 5 12:15 to Feb. 6 13:00 Current ~ 20 mA Approx. 40 trips, i.e. fast shutter.
S. De Santis “Measurement of the Beam Longitudinal Profile in a Storage Ring by Non-Linear Laser Mixing” - BIW 2004 May, 5th Measurement of the Beam Longitudinal.
05/05/2004Cyrille Thomas DIAMOND Storage Ring Optical and X-ray Diagnostics.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
FFAG-Workshop Dec Kumatori Japan Diagnostics for FFAG- accelerator Takahisa ITAHASHI Department of Physics, Osaka Univ. Toyonaka, Osaka, ,Japan.
M. Körfer, DESY Salzau Light guide dosimeters and loss monitors H. Henschel, J. Kuhnhenn Fraunhofer-Gesellschaft INT M. Körfer, K. Wittenburg.
The ISIS Dual Harmonic Upgrade The Council for the Central Laboratory of the Research Councils Andy Seville Joint Accelerator WorkshopMarch 28th, 2006.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
ICFA-HB 2004 Commissioning Experience for the SNS Linac A. Aleksandrov, S. Assadi, I. Campisi, P. Chu, S. Cousineau, V. Danilov, G. Dodson, J. Galambos,
October, 2009 Internal Review Beam Instrumentation David Gassner.
T. Limberg Position of the 3rd Harmonic System. Injector (with first Bunch Compression Stage) 2 European XFEL MAC May 2010 T. Limberg.
Beam Halo Monitoring using Optical Diagnostics Hao Zhang University of Maryland/University of Liverpool/Cockcroft Institute.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
MeRHIC Internal Cost Review October, Dmitry Kayran for injector group MeRHIC Internal Cost Review October 7-8, 2009 MeRHIC: Injection System Gun.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
ApEx needs for CeC PoP Experiment December 11, 2015.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
Transverse Coherent Transition Radiation (TCTR) Experiment First Ideas for a Measurement Setup Max-Planck-Institute for Physics Munich Olaf Reimann, Scott.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
Operated by JSA for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Alex Bogacz NuFact’08, Valencia, Spain, July 4, 2008 Acceleration.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
Beam Diagnostics for the FAIR Proton LINAC RFQ Workshop at GSI
Operations Machine Simulator.
Beam Commissioning Adam Bartnik.
Challenges of Dual Harmonic RF Systems
The ISIS Dual Harmonic Upgrade
Have a chance to operate your own beam at CERN
DC Injector and Space Charge Simulation Status
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Notes on Machine Protection for long bunch trains
Longitudinal Diagnostics for start-up
G0 Backward Angle Accelerator Preparations
Damping Ring Kicker Tests at AØ
Bunch Tiltmeter Steve Smith SLAC Snowmass July 16, 2001 Update date
LHC (SSC) Byung Yunn CASA.
Beam Current Monitoring with ICT and BPM Electronics
Advanced Research Electron Accelerator Laboratory
Electron cloud studies at CESR
Feed forward orbit corrections for the CLIC RTML
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
VELA BPMs Alex Brynes.
Summary of Beam Cooling Parallel Session
High Level Physics Applications for LCLS Commissioning
Linac Diagnostics Patrick Krejcik, SLAC April 24, 2002
CLIC Feasibility Demonstration at CTF3
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Linac Diagnostics Commissioning Experience
Undulator Cavity BPM Status
PSB magnetic cycle 900 ms MeV to 2 GeV
LCLS Longitudinal Feedback System and Bunch Length Monitor Juhao Wu Stanford Linear Accelerator Center LCLS DOE Review, February 08, 2006 LCLS longitudinal.
Breakout Session SC3 – Undulator
Presentation transcript:

Controls CBETA controls will extend existing EPICS control system EPICS include standard components: data acquisition and control operator interface save/restore settings data archiving alarm state notification interfaces to Matlab, Python, C++, … Leverages a proven, scalable platform supported by a large, open, active community

Two important additions to be made to existing controls infrastructure: Accelerator configuration repository – provide a central repository for component details, make these details available to controls, simulation, and user Implement an interface between Bmad and EPICS, allowing Bmad to read/write current machine settings

Diagnostics

Diagnostics The principal challenge for CBETA diagnostics is the presence of multiple beams which must be individually diagnosed and controlled. Additionally must cope with limited longitudinal space and large horizontal offsets in FFAG-arcs

BPMs – dealing with multiple beams: separation in time Diagnostics - BPMs BPMs – dealing with multiple beams: separation in time Probe bunches separated by 9.5 RF cycles (7.3 nS)

Diagnostics - BPMs

Reflection from first beam pulse Diagnostics - BPMs Injector 8 mm buttons in 35 mm diameter beam-pipe First beam pulse Reflection from first beam pulse

Diagnostics - BPMs ‘Oscilloscope trace’ for injector button trace acquired with V301 (Dec. 2016) ADC clocked from injector RF master oscillator read out EPICS Need to address the ringing

Diagnostics - BPMs EPICS user interface screen from beam test 4 bunches shown in this raw ADC data ~40dB gain in V301, no external amplifiers timing seemed remarkably stable – but in CBETA will need to automate timing adjustment to machine state 1 second average position

Diagnostics - BPMs Current plans are for 70 mm ID pipe with 18 mm buttons oriented as shown. For different arrangements of buttons we evaluate the average sensitivity over a region of interest. The ROI is show here is for the FFAG arc. The arrangement shown on top favors horizontal resolution over vertical in the ROI. The reverse is true for the bottom arrangement.

Synchrotron Radiation for 40 mA beam, 5 m bend radius Diagnostics - BPMs Synchrotron Radiation for 40 mA beam, 5 m bend radius 4 eV

4-Button BPM (for Halbach Cell) Diagnostics - BPMs 4-Button BPM (for Halbach Cell)

Bunch Arrival Monitors Diagnostics - BAMs Bunch Arrival Monitors CBETA operation requires precise control of the timing/phase of the bunch entering the linac. BAM BAMs Control Arrival Time here

Diagnostics - BAMs Injector RF BPM electronics 1300 MHz RF Laser at 1300 or subharmonic LO at 1300 – 12.5 MHz ADC clock at 50 MHz are all phase locked. The phase of the IF signal relative to the ADC clock is a direct measure of bunch phase relative to 1300 MHz reference. Typically achieve 0.1° or 0.2 pS Note: no adjustment required for changing machine conditions

Diagnostics - BAMs The existing RF BPM electronics don’t work in the presence of multiple beams. However in the splitters there are only two beams. Measurement of amplitude and phase at two harmonics does work – amplitude and phase of two beams can be reconstructed. (e.g. the signal from two equal amplitude beams 180° out of phase cancel at 1.3 GHz but add at 2.6 GHz)

Diagnostics – Viewscreens Viewscreens are destructive diagnostics – all subsequent beam is lost. Their value is for first pass commissioning, especially before BPMs are working, and for beam transverse profile measurements. We plan to include: FFAG section – one per girder initially 2 viewscreens per splitter 10 additional screens in injector, linac, mirror merger, and transport to dump BeO screens are planned (low cost vs. YAG:Ce or diamond). During the upcoming MLC test run period we will quantify resolution, linear range, and damage threshold.

Machine Protection Machine Protection Melting time for 100 mA, 50 MeV electron beam incident on aluminum beam-pipe.

Machine Protection Machine Protection System: Beam Loss Monitors and subsystem specific circuitry feed Fast Laser Shutter Beam loss monitors will be implemented as a combination of PMT + scintillator (possibly fiber) Offers easy gain adjust Requires base, HV supply, HV cables Photodiodes Beam current monitors (injector – dump)

Machine Protection Number and location of BLMs to be informed by Identification of loss scenarios (Bmad) Modeling of radiation pattern (Geant4) Thermal modeling of deposited power (Ansys) We would like to identify a ‘safe’ current for commissioning as well a loss threshold for the monitors. Related issues: activation of beam-line components, radiation damage

Summary – Controls: existing EPICS controls provide a solid foundation for CBETA Diagnostics: we have identified a set of hardware approaches requiring modest development that will allow us to commission CBETA